Biosolids Planning – Core Team Meeting

Slides:



Advertisements
Similar presentations
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Advertisements

KING COUNTY & BROWN GREASE Local sewer agencies have a need to address restaurant grease trap waste. In response, there is the potential of a renewable.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
NC AWWA-WEA 93rd Annual Conference November 12, 2013 Tim Woody Resource Recovery Division Director, City of Raleigh Jonathan Treadway P.E, BCEE, CDM Smith.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Wastewater Collection System Optimization An Innovative Approach to Capital Improvement Planning COPYRIGHT – OPTIMATICS PTY LTD
Do it pro bono. Key Messages & Brand Strategy Service Grant.
Community Development & Planning Grant Pre-Application Meeting April 17,
Biosolids Management Program Update Briefing for Environmental Quality and Operations Committee July 19, 2007 Briefing for Environmental Quality and Operations.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
Planning and Community Development Department Housing Element City Council February 03, 2014.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
1 Draft1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Biosolids Management Program Update May 22, 2008.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Bioenergy Update Presented by: Glenn Hummel, PE. Agenda / Objectives Background & Mission Major Recent Achievements Current Focus & Activities Local Update.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
CarolloTemplateWaterWave.pptx City of Bainbridge Island Water System Plan Policy Discussion April 21, 2015.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Why Class A does not always make cents: Cost model to drive biosolids planning decisions Thor A. Young | Service Line Leader Sebastian E. Smoot | Engineer.
Camera PDR/CD1 Planning 19 September 2008
Long-Term Planning Presented by: APP Site Visit Don Untch
Strategic Planning When Engineers and Planners Work Together
Strategic Information Initiatives
Market Operations Engagement Group EVSE Working Group – Principles
Green and Sustainable Remediation (GSR) Overview
NC AWWA-WEA 97th Annual Conference
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
Status Update for Reliability/Market Power Mitigation Assessment
NWA Suitability Criteria
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
Heli Karaila Valmet Suleyman Gemici Valmet
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Renewable Biogas Options
Improving Energy Reliability & Performance
Indiana “Blue Ocean” Project
Improving Energy Reliability & Performance
2014 PNCWA Conference Utilizing an Industrial Incentive Policy to Achieve Nampa’s Strategic Goals October 28 | 2014 Matthew Gregg, P.E
Article 41 Wastewater Planning Capacity Study
Long Range Facilities Plan
GCF business model.
CE 445 Wastewater Reclamation and Reuse
City of Bellingham Resource Recovery Project Update
Energy performance and Carbon emissions Assessment and Monitoring tool
STATION 1 Brown and Caldwell.
Solids Stream Train incinerator (#1) built in 1972
Biosolids Planning – Core Team Meeting
2-Step Process 1 High level screening of potential alternatives 2
Biosolids Planning – Core Team Meeting
PROJECT OVERVIEW Liquids Stream Solids Stream
Biosolids Planning – Core Team Meeting
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Capital Improvement Plan April 9, 2018 Status Update
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
The Wausau Wastewater Treatment Facility
The Project Overview and Status Report
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Sustainable Agricultural Lands Conservation Program
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Biosolids Planning – Core Team Meeting City of Bellingham April 3, 2017

Agenda Topic Description Leader Introductions (5 mins) Review agenda and meeting objectives Status update Get input and confirmation on recommendations Identify areas that need additional follow-up Giesbrecht Schedule Overview (5 mins) Overview of schedule and work sequence status Preliminary BCE (30 mins) Overview of alternatives Inputs and assumptions Benefits and risks Discussion: Confirm what’s needed for getting to a decision. Stephens Infiltration (20 mins) Status update of field investigations work Overview of next steps and how information will be used Turk WWTP Impacts (20 mins) Overview of disinfection/treatment considerations Overview of site layout considerations Discussion: Confirm recommendations Tam or Stephens? Bureau of Reclamation Site Visit (3/13) Prep (10 mins) Discuss materials needed and logistics for the site visit. Zaroff Stakeholder Meeting (6/7) (15 mins) Confirm purpose and messaging: Next Steps Brown and Caldwell

Brown and Caldwell

Overview of changes to Pass/Fail Brown and Caldwell

Pass/Fail Criteria Updates From Last Workshop Brown and Caldwell

Pass/Fail Criteria Updates From Last Workshop Brown and Caldwell

Pass/Fail Criteria Updates From Last Workshop Brown and Caldwell

Conceptual Alternatives – focus now on post-digestion options and end use Brown and Caldwell

Revised Financial criteria TBL+ process TBL+ Criteria Revised Financial criteria TBL+ process Brown and Caldwell

Updated Financial Criteria Parameter Examples of Metric F1. Optimizes system value Provides balanced ROI using TBL+ criteria over 50 year life Compare the life-cycle cost of alternatives (e.g., cost of construction, land, mitigation, ongoing O&M expenses) with the monetized value of key benefits (e.g., reduced carbon emissions, soil tilth) F2. Affordability Consistent with long term financial, environmental and social goals of Wastewater utility   Illustrate how the ability to achieve desired environmental and social benefits is linked to the anticipated rate impacts for each alternative F3. Minimizes risk of end use market sensitivity Limits risk or maximizes benefits from commodity market changes of end use products Brown and Caldwell

TBL+ Comparison of Alternatives 8 E2 Global Impact 7 E1 Local Impact 6 S2 Assets E2 Global Impact 5 S1 Health & Safety S1 Health & Safety Number of Objectives Met 4 F2 Life Cycle $ F2 Life Cycle $ E2 Global Impact 3 F1 Capital $ F1 Capital $ E1 Local Impact E1 Local Impact E1 Local Impact 2 T2 Efficiency T2 Efficiency S2 Assets S2 Assets S2 Assets 1 T1 Reliability/ Performance T1 Reliability/ Performance S1 Health & Safety T1 Reliability/ Performance Ideal Alternative Alt. 1 Alt. 3 Alt. 4

Key Differentiators Identified in Detailed Analyses

Design Year Flows/Loads Basis Brown and Caldwell

Current Population Projection Range

Key Load Projection Assumptions Land capacity analysis (LCA) represents land use buildout of City and UGA. Changes to zoning would be required to continue growth Industrial loading (SIUs) is approximately 10% of total BOD/TSS load. Industrial load will increase based on employment growth through 2036 City/UGA will be 100% sewered by 2036 LWWSD growth projection consistent with 2009 Comprehensive Sewer Plan Per capita loads 0.20 ppcd BOD, 0.24 ppcd TSS

Preliminary Influent BOD Projection Land Capacity Analysis

Preliminary Influent TSS Projection Land Capacity Analysis

Confirmation of Key Assumptions to finalize flows and loads Land capacity analysis (LCA) represents current land use of City and UGA. Zoning would change to continue same rate growth beyond 2036 Industrial loading (SIUs) is approximately 10% of total BOD/TSS load. Industrial load will increase based on employment growth through 2036 (7%) City/UGA will be 100% sewered by 2036 Linear LWWSD growth projection consistent with 2009 Comprehensive Sewer Plan North Shore (+100 households by 2026) South Shore (+1650 households by 2026)

Team Discussion What is design year/load for Biosolids planning?

Incinerator Capacity Preliminary Peak 3-Day Loading Projection Begin 24/7 operation Combined incinerator capacity Land Capacity Analysis

Proposed Layout/Design Criteria Brown and Caldwell

General Redundancy Criteria Mechanical Equipment One redundant unit above peak loading condition (thickening, dewatering, process pumps, compressors, gas flares, etc.) Process Units No redundant unit – size based on service condition of one unit off line during max month condition (digesters) No redundant unit – size based on 2 units at 60% peak day load each (driers) No redundant unit – size based on optimized capacity (cogeneration, gas upgrading where flare backup is available) Brown and Caldwell

Solids Sizing Criteria Process Sizing Criteria Thickening Assume reusing existing GBTs and co-thickening Sized for peak day load with one unit out of service Digestion Assume TPAD for Class A option (including batch tanks) 4 digesters sized for: - Peak 2-week with all tanks available - Peak month with one tank out of service Digested Sludge Storage One tank sized for 1 day of storage (at peak day), assuming 24/7 operation of dewatering process Dewatering Assume reusing existing centrifuges Cake Storage Sized based on end use (land application = 3 days, dried product = 1 day, soil blending = 0-1 day depending on location of digestion) Dryer Assume 2 dryers, each sized for 60% of peak day load Product storage Storage for 120 days of product (except land application which is covered by cake storage above) Brown and Caldwell

Biogas Sizing Criteria Process Sizing Criteria Boilers 2 boilers sized to handle 60-100% of peak 2-week load Redundant unit or cogeneration serves as redundancy Redundant pump (peak day) for main heat loop CHP Engines 1 or 2 engines sized to handle max month No redundant unit Biogas Upgrading Sized for peak 2-week No redundant units Flares 2 flares sized to handle 50%+ each with 2x safety factor

Offsite Assessment Brown and Caldwell

Off-site Considerations Advantages Easier implementation of co-digestion Reduces trucking and neighborhood impacts to Fairhaven Economy of scale/regional option Could preserve future capacity for Post Point Liquids treatment Could open door to privatization options Disadvantages Land purchase Permitting Conveyance from Post Point Operations staff at 2 locations Brown and Caldwell

Documentation Goals Brown and Caldwell

Who’s the Audience? Brown and Caldwell

Public Outreach Brown and Caldwell

April 10th Council Meeting Overview of TBL+ criteria proposed for assessing alternatives Demonstrate link to City Legacy Statements and Strategic Commitments Brown and Caldwell

April 19th MNAC – Draft Fact Sheet Brown and Caldwell

Status on other Public Outreach Activities Official project name Website Other? Brown and Caldwell

Next Steps Action Items Site visits? TBL+ development Tacoma CTP (Digesters and TAGRO) CCWWTP (Digester and Dryer) TBL+ development Brown and Caldwell