802.11bd Timeline Date: Authors: January 2019

Slides:



Advertisements
Similar presentations
IEEE mc Closing Report for March 2015
Advertisements

Doc.: IEEE /0778r0 Report June 2014 Dorothy Stanley (Aruba Networks) Slide 1 P802.11REVmc Status and Overview Date: Authors:
Doc.: IEEE /0695r0 Report May 2015 Dorothy Stanley, Aruba NetworksSlide 1 IEEE mc Closing Report for May 2015 Date: Authors:
Submission doc.: IEEE /0609r2 May 2015 Yan Xin, Huawei TechnologiesSlide ay Timeline Date: Authors:
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
A Proposed Timeline for IEEE ba TG
TGv Closing Report March 2008
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGw March Agenda Date: Authors: May 2008
TGax March 2017 Closing Report
IEEE TGz Vancouver Agenda
IEEE aj Process Overview
Sub-1 GHz Study Group Closing Report Sept 2018
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
January 2009 Closing Report
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
HTC 34; 5656 AE Eindhoven, the Netherlands
Submission Title: [Proposed project timeline]
802.11ax Timeline Scenarios Date: Authors: May 2014
TG4k Project Time line (draft)
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGs Montreal Closing Report
TGz Beijing May 2010 Closing Report
Avoiding unnecessary delays in the WG Letter Ballot process
TGaf Geneva Closing Report
TGac Status and Timeline
HTC 34; 5656 AE Eindhoven, the Netherlands
IEEE aj Process Overview
<month year> doc.: IEEE < e> <September 2018>
TGn Closing Report Vancouver, BC, Canada 802 Plenary
A cascading process for major amendments
Submission Title: [Proposed project timeline]
IEEE aj Process Overview
An Introduction of IEEE TGbd
IEEE TGmc Nov 2012 Agenda Date: Authors:
TGn Closing Report Los Angeles, CA, US 802 Interim
Proposed timeline for the Light Communications TG
IEEE SGa Project Timeline
Straw polls and Motions on Spec text for and
TGn Closing Report Vancouver, BC, Canada 802 Plenary
IEEE Revision Timeline
TGak November Closing Report
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
September 2009 Closing Report
Timeline for the Light Communications TG
November 2010 Closing Report
2019 March TGba Closing Report
IEEE mc Closing Report for July 2013
802.11be Timeline proposal Date: Authors: May 2019
Avoiding unnecessary delays in the WG Letter Ballot process
Straw polls and Motions on Spec text for and
Submission Title: [Proposed project timeline]
TGae Closing Report – July 2011
IEEE TGmc January 2016 Agenda
IEEE TGv November 2010 Agenda
Task Group BA - January 2017 Since the last (November) F2F meeting
PAR Extension Motions Date: Authors: July 2016 Name Company
IEEE mc Closing Report for September 2015
IEEE mc Closing Report for September 2016
IEEE mc Closing Report for May 2016
TGax November 2017 Closing Report
TGbd Closing Report – Vietnam
Presentation transcript:

802.11bd Timeline Date: 2019-01-16 Authors: January 2019 Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2019 802.11bd Timeline Date: 2019-01-16 Authors: Bahar Sadeghi, Intel Corp. John Doe, Some Company

Overview of Timelines for 802.11ac,11ax, 11ba, and 11p Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2019 Overview of Timelines for 802.11ac,11ax, 11ba, and 11p 11ac 11ax 11ba 11p Page count 429 729 106 34 Stage Duration 11ac [1] 11ax [1][2] 11ba [5] 11p [3][4] PAR approval -> Approved Standard 64 months 68 months 46 months 70 months PAR approval -> D0.1 29 months 20 months 14 months 6 months D0.1 – Draft 1.0 12 months 8 months Draft 1.0 – Draft 2.0 10 months 4 months Draft 2.0 - Final 22 months 26 months 42 months Bahar Sadeghi, Intel Corp. John Doe, Some Company

Timeline for 802.11bd PAR [6] includes the following dates: January 2019 Timeline for 802.11bd PAR [6] includes the following dates: Initial Sponsor Ballot Sept 2020 Submission to RevCom Sept 2021 Option 1 An aggressive timeline to meet the dates in PAR PAR to RevCom: 33 months Option 2 A more realistic alternative timeline PAR to RevCom: 45 months Bahar Sadeghi, Intel Corp.

Proposed Timeline for 802.11bd- Option 1 January 2019 Proposed Timeline for 802.11bd- Option 1 PAR approved Dec 2018 First TG meeting Jan 2019 D0.1 Sept 2019 D1.0 Letter Ballot Nov 2019 D2.0 LB recirculation Mar 2020 Form Sponsor Ballot Pool May 2020 D3.0 LB recirculation May 2020 D3.0 unchanged recirculation July 2020 Initial Sponsor Ballot (D4.0) Sept 2020 Final 802.11 WG approval July 2021 802 EC approval July 2021 RevCom and SASB approval Sept 2021 Bahar Sadeghi, Intel Corp.

Proposed Timeline for 802.11bd- Option 2 January 2019 Proposed Timeline for 802.11bd- Option 2 PAR approved Dec 2018 First TG meeting Jan 2019 D0.1 Mar 2020 D1.0 Letter Ballot Sept 2020 D2.0 LB recirculation Jan 2021 D3.0 LB recirculation May 2021 Form Sponsor Ballot Pool Sept 2021 D4.0 LB recirculation Sept 2021 D4.0 unchanged LB recirculation Nov 2021 Initial Sponsor Ballot (D5.0) Jan 2022 Final 802.11 WG approval July 2022 802 EC approval July 2022 RevCom and SASB approval Sept 2022 Bahar Sadeghi, Intel Corp.

Proposed Timeline for 802.11bd (option 2) Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2019 Proposed Timeline for 802.11bd (option 2) Stage Duration 11ac [1] 11ax [1][2] 11ba [5] 11p [3][4] Option 2 for 11bd PAR approval -> Approved Standard 64 months 68 months 46 months 70 months 45 months PAR approval -> D0.1 29 months 20 months 14 months 6 months (?) 15 months D0.1 –> Draft 1.0 6 months 12 months 8 months Draft 1.0 –> Draft 2.0 10 months 4 months Draft 2.0 -> Final 22 months 26 months 42 months Bahar Sadeghi, Intel Corp. John Doe, Some Company

Straw Polls Which option do you prefer for 802.11bd timeline Option 1 Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2019 Straw Polls Which option do you prefer for 802.11bd timeline Option 1 Option 2 Do you agree with the timeline presented as option 2 (on slide 5) as the time estimates for the work in 802.11bd? Yes: No: Abstain: Bahar Sadeghi, Intel Corp. John Doe, Some Company

References [1] IEEE802.11-14/0649r1, “802.11ax Timeline Scenarios” Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2019 References [1] IEEE802.11-14/0649r1, “802.11ax Timeline Scenarios” [2] IEEE802.11-18/0968r0, “TGax timeline” [3] http://www.ieee802.org/11/Reports/802.11_Timelines.htm [4] IEEE802.11-05/0090r0, “Wave Closing Report” [5] IEEE802.11-18/2109r1 “January TGba agenda” [6] IEEE802.11-18/0861r9 “NGV-SG-Proposed-PAR” Bahar Sadeghi, Intel Corp. John Doe, Some Company

January 2019 Backup Slides Bahar Sadeghi, Intel Corp.

11p timeline January 2019 Par approval: 09-2004 [D0.1] Jan 2005 report= A draft amendment was presented and is available on the web site [Commenting started] WG Letter ballots: D1.0: 04-2006 (56%) D2.0: 01-2007 (67%) D3.0: 09-2007 (74%) D4.0: 05-2008 (79%) D5.0: 12-2008 (85%) D6.0: 03-2009 (89%) D7.0: 06-2009 (85%) D8.0: 08-2009 (89%) D9.0: 10-2009 (93%) WG Sponsor ballots D9.0: 11-2009 (93%) D10.0: 2-2010 (96%) D11.0: 4-2010 (99%) Standard board approval: 7-2010 Bahar Sadeghi, Intel Corp.