Working With Progress Reports

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

A Short Course on How to Manage SLOs with TracDat.
ADD COLLATERAL TO A LOAN ACCOUNT. 2 How to Add Collateral to a Loan Account? This guide will show you how to add Collateral to a Loan Account with Mifos.
SCREENSHOTS INSTRUCTION OF THE FOLLOWING:  How to access my account in the website? HHow to view my Re-Entry Action Plan? - How to edit my Re-Entry.
Travel Roster Go to Login under member login which is located at the top right side of the page.
My Penguin Math Book By:. I see How many penguins do you see? Count them & type the number in the box penguins.
DataMine 2.0 Role: Manufacturer AASHTO’s NTPEP Program presents: NTPEP DataMine 2.0 NTPEP DataMine 2.0.
Research Core Laboratories. Requirements: Adobe Acrobat (Full Version) In order to digitally sign form you must be using the full version of Adobe Acrobat.
To get to the Progress Toward Degree worksheets, click on “Contents” on the menu bar…
Vanche Gujarat Abhiyaan(VGA)- Best Reader Competition Online Student Registration and Data Entry presentation.
MPA Online Entering Solos, Ensembles, and Bands. The first step is to log into MPA Online at: You will need.
Technical Support and RMA Tutorial Customer Interaction Center - CIC.
Lethbridge Christian Tabernacle Managing Events
Cigarette Distributing Agent’s Report. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Entering a Loan into OpenClose. OpenClose is a web based program that can be access from any computer Login to OC by going to
 Requesting Additional Orders (pgs. 2-9) *Call CEC for assistance  Adding New Students/Registering Students (pgs ) *Call CEC for assistance  Editing.
SOML Large Optics Daily Reporting Guide to using the new ETSEDMS server for Large Optics Daily Reporting.
Setting up Wordpress Directions Creating an account Lost your password? Finding your dashboard Choosing background theme Adding a new page Setting the.
EAGLE LINK TRAINING Fall YOUR CLUB’S EAGLELINK PAGE Updating the info about your club that prospective and current members can see.
A Short Course on How to Manage SLOs with TracDat.
SAMHSA’s Faith and Community Based Support Initiative.
Create new project or open existing project (here, we will create a new project)
Mandatory steps to be performed by the admin before efiling a petition  New Project / Generation Station should be added before filing TT / GT type applications.
Adding/Removing Responsible Party This module will discuss how to add and remove Responsible Party information.
LOGIN PAGE Login Page Support CRM:
Adding, editing, and deleting items using CONTENTdm Administration.
Set up a “Group” in G-mail August, FIRST Go to your G-mail account Click on “Contacts” under “Children Come First”
Share or Assign Site. Create a Site Click ‘Edit’
How to Create & Edit a Company Page Sorry that this presentation is 9 slides, but it only takes 2 minutes to do this, at the most!
Elluminate Creating a meeting in Blackboard. Select You Module Select an appropriate space to create the meeting Click “EDIT VIEW”
Instructions To Include Contacts In Gmail Login your Gmail Account.
ADDING TILES IN UACCESS
ASI Table [Instructor Notes, if any, will appear here.]
Bulk Import 3104 E. Camelback Road #559, Phoenix, AZ 85016
View Address Page Helpful Hints
How To Use the Med List Tool (MLT)
How to Add Contacts in Gmail
Adding Patients Chapter 3.
UNITED IN SERVICE TO OUR NATION
Setting Up Classes and Groups in EbD-BUZZ A Tutorial for EbD Teachers
NAMI 360 – Screenshot Guide 2
UML Diagramming with JUDE
THE BASICS PIONEER PLACE
The Smarter Balanced Assessment Consortium
FAQ 02 How to upload completed Assessment Tasks to the website
The Smarter Balanced Assessment Consortium
How to complete a Referral Form via “Student” tab
Log in with your SHSU username and password.
BEGINNER PROGRAMMING LESSON
HOW TO INPUT YOUR REFERENCE:
Manage Funding In this training module, you will be guided through the process of adding funding and funding documents to a requirement package. This feature.
GMG - How to RENEW Administratively Continued Permit
How to go about it….
Navigating the QuickBase System
Adding a Document to Your Report
Marking Work Orders Complete/Ready For Supervisor To Close
Help..
The Smarter Balanced Assessment Consortium
The Smarter Balanced Assessment Consortium
Creating an Expense Report Goods and Services
Engrade Discussions.
EFF Factor Training Program
When you first enter the Knowledge Base module, the three tabs allow you to search Active records, to browse all records (what most of you use a lot),
Version-2.0 Changes in Tests.
Training Presentation for McCormick’s Proficiency Sample Program Website Lesson 5 - How to display your microsanitary results [Instructor Notes, if any,
How to Use templates?.
Test Manager Plugin for Trac Part 2/3 Roberto Longobardi
How to do a Peer Review on Turnitin.com
Presentation transcript:

Working With Progress Reports Adding, Viewing and Editing Reports

Add a New Progress Report Click on the blue “Progress Report” button to the right of the black button.

Add a New Progress Report In the dropdown list select “Add a new Progress Report”

Add a New Progress Report Fill in the fields; fields with a red asterisk have to be completed to submit your report.

Add a New Progress Report Save your report by clicking the Save button.

View an Existing Progress Report Click on the blue “Progress Report” button to the right of the black button.

View an Existing Progress Report In the dropdown list select “List All”

View an Existing Progress Report The Progress Reports are displayed in rows, one report to a row. At the left of each row are 2 buttons that say “Edit” and “View”. Click the View button

Edit an Existing Progress Report Click on the blue “Progress Report” button to the right of the black button.

Edit an Existing Progress Report In the dropdown list select “List All”

Edit an Existing Progress Report The Progress Reports are displayed in rows, one report to a row. At the left of each row are 2 buttons that say “Edit” and “View”. Click the Edit button of the report you want to edit