INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…
PASSAGES DE CABLES NIVEAU MACHINE PERIODE 15 PERIODE 1 PERIODE 16 PERIODE 14 PI PT SMV BSW GEN
ZONE A ZONE B ZONE C EVAC
Re-installation of large band pick up BR.WCM8L1; Impact BI.MTV30 (2 hublots),BI.MTV60 (8 hublots), BT.MTV30 (1 hublot); Impact Maintenance of the PSB tune system. Impact Remplacement pick-up UMA by BPSHV positions:BI.UMA20BI.UMA30BI.UMA40 (4 positions) BI.UMA50 (4 positions): Impact Replacement of BE-BI-PI transformers.BT.BCT.10; BTP.BCT10; BTM.BCT10; BTY.BCT112: Impact Maintenance FWS Booster; Impact Démontage/Rénovation/Remontage des transformateurs BI.BCT10, BI1.BCT20,BI2.BCT20, BI3.BCT20, BI4.BCT20; Impact Dismantling of 50 BLMs for repair and calibration and reinstall; Impact Replace the electronics of the SEM-grids BTM-line, Impact BT.UES40 : BT.UES10 tank MTV BTP..UES00: BTM.UES00 BTM:UES10 : BTY.UES120: BTY.UES152: Replace with new type pick up Impact Requires ECR Dedicated meeting to be organised by D.Hay directly after the PSB LS1 coordination meeting.. Invite P.Demarest, Jose Antonio Ferreira Somoza, Tobias, Delphine,
GEN
PASSAGES DE CABLES NIVEAU MACHINE PI PT