INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

Slides:



Advertisements
Similar presentations
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Advertisements

Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
0 - 0.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Kicker SloW (KSW) magnets and Generators PSB 160 MeV H - injection L. Feliciano TE/ABT.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
WHICH PORT TEST INTEGRATED TECHNOLOGY. 1: WHICH PORT IS THIS?
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Doubles Facts Doubles with Pictures Doubles without Pictures Pictures Only.
Week 1.
1 Unit 1 Kinematics Chapter 1 Day
One step equations Add Subtract Multiply Divide Addition X + 5 = -9 X = X = X = X = X = 2.
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
BI Activities for LS2 Ray Veness for BE-BI.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
PSB MD C. Bracco, G.P. Di Giovanni. Outline Aim MD1: – Matching – Trajectories – Transmission MD2 – Matching – Trajectories – Transmission Next steps.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
YETS & LS2 Works EN-EL / Power distribution
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
EYETS Works EN-EL [ FC excluded ]
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
LIU–PLI report LIU PSB meeting.
Planning and Installation
LIU–PLI report LIU SPS meeting.
Status of the BI Work Package in the LIU-PSB frame
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
YETS PS + PS SWY + TT2 Facility Coordinator:
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
LIU Wire Scanner Series Costs
PSB-PS instrumentation for LIU
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
!'!!. = pt >pt > \ ___,..___,..
Status of the BI Work Package in the LIU-PSB frame
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

PASSAGES DE CABLES NIVEAU MACHINE PERIODE 15 PERIODE 1 PERIODE 16 PERIODE 14 PI PT SMV BSW GEN

ZONE A ZONE B ZONE C EVAC

Re-installation of large band pick up BR.WCM8L1; Impact BI.MTV30 (2 hublots),BI.MTV60 (8 hublots), BT.MTV30 (1 hublot); Impact Maintenance of the PSB tune system. Impact Remplacement pick-up UMA by BPSHV positions:BI.UMA20BI.UMA30BI.UMA40 (4 positions) BI.UMA50 (4 positions): Impact Replacement of BE-BI-PI transformers.BT.BCT.10; BTP.BCT10; BTM.BCT10; BTY.BCT112: Impact Maintenance FWS Booster; Impact Démontage/Rénovation/Remontage des transformateurs BI.BCT10, BI1.BCT20,BI2.BCT20, BI3.BCT20, BI4.BCT20; Impact Dismantling of 50 BLMs for repair and calibration and reinstall; Impact Replace the electronics of the SEM-grids BTM-line, Impact BT.UES40 : BT.UES10 tank MTV BTP..UES00: BTM.UES00 BTM:UES10 : BTY.UES120: BTY.UES152: Replace with new type pick up Impact Requires ECR Dedicated meeting to be organised by D.Hay directly after the PSB LS1 coordination meeting.. Invite P.Demarest, Jose Antonio Ferreira Somoza, Tobias, Delphine,

GEN

PASSAGES DE CABLES NIVEAU MACHINE PI PT