EU/GB Charging Project – Delivery Timescales

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2. EU Tariff Code – Emerging Issues. EU Tariff Code – ACER Feedback No.ACER Request/Issue 1Redefine Transmission Services Definition -Harmonised definition.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
Mental Health Partnership Arrangements Integrated services for adults with a mental health problem in Solihull.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Food Suppliers Implementation of EDI &PAV March 2010
Recommendation of Texas Test Plan Team to RMS
DSC Change Committee UK Link Future Releases Proposed Approach
EU Tariffs Code Update Based on Refined Draft as of 30th October
Capacity Conversion – 616s
EU Implementation Programme
Regulators’ update on Congestion Management and Balancing
Transmission Workstream, 2nd March 06
Transmission Workstream 4th July 2007
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
How to Successfully Implement an Agile Project
RRC arrangements for Storage sites
Amendment Invoice Task Force Progress Report
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
2019 Release Planning Options inc Modification 0621 / GB Charging Project DSC Change Management Committee update July 2018.
COR1072 Enduring Transfer and Trade Arrangements
Exit Capacity Substitution and Revision
UKLP Programme Plan End Stage Assessments
Mod 621A Supporting analysis
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Update on Exit Capacity Substitution and Revision
Modification 501 slides for Workgroup
PARCA Timeline.
Transmission Workstream – Partial Assignment
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Amendment Invoice Task Force Progress Report
Revised Tender Timescale for DN Interruption Arrangements
Mark Freeman 29th January 2007
Optimisation of Entry Capacity Modification Proposal
Review Group Action November 2008.
Revised Tender Timescale for DN Interruption Arrangements
Capacity Access Review
Customer Issue Management Dashboard CoMC
Presentation transcript:

EU/GB Charging Project – Delivery Timescales March 2018

Delivery Timelines Development of EU/GB Change Roadmap for Charging began summer 2017 Project teams formed between NG & Xoserve Acceptance that we would have to “work at risk” – i.e. implementation would begin before detailed requirements agreed Need for Change Requirements is built into the programme

Delivery Timelines Implementation programme formally began in January 2018 Start date required to ensure ability to deliver for early 2019 Project split into 2 Phases Phase A aims to deliver required changes for first half of 2019 to facilitate Annual Auction in July 2019 Phase B aims to deliver remainder of required changes for October 2019 gas year Splitting project allows flexibility to incorporate changes associated with alternates if required

EU/GB Charging Project – Delivery Timescales Analysis & Design (Jan to Apr 18) Build (May/June 18) Testing (July to Oct 18)** Implementation (Nov18) Part A Analysis & Design (May to Aug 18) Build (Sept 18 to Jan 19) Testing (Feb to July 19) User Trials (July/August 19) Implementation (Sept 19) Part B **Current working assumption is that User Trials are not required for Part A delivery

EU/GB Charging Project – Delivery Timescales Analysis & Design (Jan to Apr 18) Build (May/June 18) Testing (July to Oct 18)** Implementation (Nov18) Part A Focussed on Systems changes required for setting up Annual Auction Transparency requirements Assumes all long-term auctions prior to 31 May 2019 are under existing rules

EU/GB Charging Project – Delivery Timescales Focussed on all remaining system changes, including Fixed/floating rules at all points Treatment of historic capacity and new allocations New charge types etc. Delay in Analysis & Design in Phase B allows all alternates to be considered Analysis & Design (May to Aug 18) Build (Sept 18 to Jan 19) Testing (Feb to July 19) User Trials (July/August 19) Implementation (Sept 19) Part B **Current working assumption is that User Trials are not required for Part A delivery

EU/GB Charging Project – Impact of Alternates Requirements gathering for system changes has considered impact of alternates System changes have been designed to incorporate a degree of flexibility to allow for possible outcomes for approved solutions Some alternates have no system impacts on NG proposed approach (e.g. storage discount 50% or 86%) Latest alternates shall be assessed as part of Phase B and may require a formal Change to current project Such requirement has been allowed in planning of project

Duel Reconciliation Mechanisms March 2018

Dual Reconciliation Mechanisms Dual Reconciliation Mechanisms – situations were one reconciliation rule is applied to some capacity, and another reconciliation rule is applied to the rest of the capacity. Such a situation exists under Proposal 0621 in the enduring arrangements for Storage Capacity obtained under Historical Contracts will not pay a capacity-based Revenue Recovery charge Any Fully Adjusted Entitlements in excess of the Historical Contract Capacity will pay a capacity-based Revenue Recovery charge. Reminder: Historical Contract is defined as ‘...entry capacity... allocated up to and including the end of the month in which Ofgem issues direction to implement’

Example (Storage > Oct 21) Capacity Amount RegisteredHistorical 300 RegisteredNon-Historical 100 Transfer -50 Surrender Net entitlements 350 The general rule for sites in the enduring (post October 2021) arrangements is to pay capacity-based Revenue Recovery on the Fully Adjusted entitlements i.e. 350. For Storage: exempt quantity = Historical Contracts = 300 capacity-based Revenue Recovery = max(350-300,0) = 50

2nd Example (Storage > October 2021) Capacity Amount RegisteredHistorical RegisteredNon-Historical Transfer 50 Surrender Net entitlements Only capacity registered in an auction is captured by the definition of Historical Contracts. For Storage, the exempt quantity should be considered: exempt quantity = Historical Contracts = 0 Capacity-based Revenue Recovery = max(50-0,0) = 50

Similar arrangements for IPs? National Grid is considering similar arrangements for the IPs during the interim period (October 2019 – September 2021) Site Storage Interconnection Point Period Enduring Interim exempt* quantity Historical Existing Charge on exempt quantity None Flow based (commodity) Charge on any further capacity Capacity-based Revenue Recovery A case for exemption from the capacity-based Revenue Recovery can only be made for Existing Contracts (rather than Capacity allocated in Historical Contracts) *Exempt from capacity reconciliation

Example (IP October 2019 – September 2021) Capacity Amount RegisteredExisting 300 RegisteredNon-Existing 100 Transfer -50 Surrender Net entitlements 350 exempt quantity = Existing Contracts = 300 This can be treated as an allowance. So a commodity (flow-based) charge will be applied on allocations up to 300. No commodity charge will be levied on flow above this, but further capacity will need to be acquired to avoid an overrun. Capacity-based Revenue Recovery = max(350-300,0) = 50

Dual Reconciliation Mechanisms - Conclusion We welcome feedback on the approaches proposed In particular, we are aware that other Proposals (e.g. 621E) also have dual reconciliation mechanisms. We would welcome further bilateral discussions with any proposer whose Proposal has such a mechanism.