Linac/BC1 Commissioning P

Slides:



Advertisements
Similar presentations
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Advertisements

Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Sara Thorin, MAX IV Laboratory
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Short pulse, low charge LCLS operation
Beam-Based Feedback in LCLS-II
Thermal emittance measurement Gun Spectrometer
Revised Commissioning Strategy
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Gun Commissioning Status & Plans David H
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Electron Source Configuration
Commissioning Status of the LCLS Accelerator and Undulator Systems
Injector/BC1 Commissioning (Jan. 2, 2007 through Aug. 31, 2007) P
LCLS Longitudinal Feedback and Stability Requirements
LCLS Injector Commissioning Dates ( )
Injector Commissioning C
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
High Level Physics Applications for LCLS Commissioning
LCLS Commissioning: Results & Plans P
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Breakout Sessions SC1/SC2 – Accelerator Physics
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Maximum Credible Beam Event Paul Emma et al
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
LCLS Injector System Overview D. H
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Injector Diagnostics Status
Injector/BC1 Commissioning (Jan through Aug. 2007) P. Emma, et al
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Injector/Linac Design Status C. E
Injector Physics C.Limborg-Deprey Feb.8th 2006
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
LCLS e- Beams Systems Manager
SuperKEKB required (e+ / e-)
Presentation transcript:

Linac/BC1 Commissioning P Linac/BC1 Commissioning P. Emma LCLS Injector Commissioning Workshop (ICW) Oct. 10, 2006 LCLS

LCLS Injector Commissioning Dates (’06 - ’07) July 24: Sector-20 ready for laser installation Aug. 29: Laser installation complete Dec. 18: Virtual cathode fully characterized (ready to install gun) Dec. 19: RF gun installation starts (10 days) + pre-beam checkout + laser rate switched to 30 Hz (5 days) Dec. 20-Jan. 1: Holidays Jan. 2: VVS’s switched on (RF power available) Jan. 12: First laser UV-light on cathode! Jan. 12-Feb. 4: Electrons in GTL and gun-spect. (RF processing L0a,b, L1, LX) Feb. 5: Beam into L0a, L0b and down to 135-MeV spect. Feb. 20: Beam into main linac (to TD11 dump) ~June: Take beam down full linac (to SL2 stopper)

Straight Ahead Spectrometer Bunch Length Diagnostics Injector Through BC1 RF Gun & Solenoid L0a&L0b S-Band Linacs Transverse RF Cavity BC1 (BPM, OTR, collimator) OTR & Wire Scanners Gun Spectrometer L1 S-Band Linac Wire Scanners + OTR Main SLAC Linac 135 MeV 250 MeV TD-11 stopper X-Band RF Straight Ahead Spectrometer Bunch Length Diagnostics 40 m

Dog-Leg-1 up to First L1 RF Section (135 MeV) Bend 2 Matching quads e- Bend 1 OTR Wire-scanner Existing linac Minimize energy spread

L1-Linac (135 to 250 MeV) Cut-off RF sections with new BPMs & quads inserted e- 21-1 klystron, new SS sub-booster Set RF phase (-25º) & voltage for BC1 compression

Accelerator Sections Straightened Coordinate Measurement Machine (CMM) after before (De/e  30%) Four RF sections measured on CMM and straightened (L0a, L0b, L1a, L1b) Jose Chan

Set S & X RF ampl. & phase, and chirp for BC1 compression BC1 Chicane e- tweaker quad 2 0-30 cm translation stage Bunch length monitors tweaker quad 1 OTR X-band RF collimator BPM Set S & X RF ampl. & phase, and chirp for BC1 compression

(allows passage of 30-GeV beam) Moveable BC1 Chicane BPM critical for energy feedback (20 mm resolution) offset: 0 to 30 cm (23 cm nominal) collimator BPM tweaker quadrupole screen (allows passage of 30-GeV beam) 3-cm contraction

BC1 Dipole Fields are Marginal tracking through fields measured with stretched wire De/e0  1 to 6 % Pole nose pieces in fabrication + tweaker quadrupoles available

Dispersion Correction in SPPS Chicane One linear comb. of 2 tweaker quads

Diagnostic Section After BC1 3 wire-scanners e- Bunch length monitors Insertable stopper (TD11) OTR Future EO? Measure emittance, beta match, bunch length, CSR effects

Tune-up simulations have been run... steering with quad and BPM offsets

Setup of Linac-1, X-band RF Phases 20-mm res. BC1 BPM 20-mm res. BC1 BPM LX RF phase L1 RF phase Linac-1 RF phase scan (X-band off, BC1 at 295 MeV) Linac-X RF phase scan (BC1 at 250 MeV) set phase to -25˚0.5˚ set phase to -160˚0.5˚ Linac-1 new rf gun 21-1b 21-1d X Set L1 and LX RF phase and amplitude Turn on BC1 energy feedback (if ready) Use RF-deflector to meas. bunch length (sz1) Adjust S-band RF phase (0.5˚) to set sz1  195 10 mm

Longitudinal Beam-Based Feedback gun L3 L2 X DL1 BC1 BC2 DL2 L1 sz1 d1 1 V1 sz2 d2 2 V2 d3 V3 d0 V0 Longitudinal feedback (J. Wu): Maintains DL1 energy, BC1 energy, post-BC1 bunch length Measures DL1-BPM, BC1-BPM, BC1 bunch-length monitor Controls L0 and L1 RF amplitude, and L1 RF phase Use MATLAB in 2007 as temporary slow (~1 Hz) solution

Slice-Emittance Measurement Simulation RF-deflector at 1 MV sy  bunch length slice OTR 10 times 135 MeV quad scanned

y-slice-Emittance Measurement in BC1 “Q21201” scanned ±20% 0.3 mm 16 mm

Full Compression (q = 5.70°) BC1 CSR Effects at 1 nC Nominal Bend (q = 4.97°) Full Compression (q = 5.70°) e/e0 = 1.04 e/e0 = 6.78 sz = 200 mm sz = 12 mm

R56 = 39 mm BC1 CSR Effects CSR-Track: De/e0  8%

Study Micro-bunching Instability at BC1 (~Summer 2007) Scan BC1 bend angle, , to adjust compression factor Use RF deflectors before and after BC1 to detect bunch density (energy) modulations and compare with micro-bunching gain from theory & simulations 0= 50 m 0= 150 m 0= 300 m  (degrees) Z. Huang

Concluding Remarks Drive-Laser and gun probably most intensive commissioning areas Linac through BC1 is mostly magnets, RF, and diagnostics (but most is new) Need to take beam down full linac (1 km) in order to use RF deflector (LOLA) in sector-29 (test BC1 compression) Next commissioning phase will start in ~Jan. ’08 with BC2, LTU, undulator, and dump