The Treasure Valley Population expected to increase from 625k in 2015 to 1.57 million in 2065 Households expected to increase by 280% - from 226,600.

Slides:



Advertisements
Similar presentations
FARM BILL UPDATE. LAST FARM BILL: A LOT ACCOMPLISHED ON WORKING LANDS.
Advertisements

WATER FOR THE 21 st CENTURY ECONOMY AND ENVIRONMENT Santa Ana River Watershed Conference April 11, 2013.
Vision For the Future of Water in Kansas. 1.Technology and Crop Varieties 2.Water Management 3.Water Conservation 4.New Sources of Supply Breakout Topic.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Kansas Westward Water Transportation: Setting the Stage Presented by: Mark Rude August 1, 2014 Kansas Water Congress.
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Comprehensive Aquifer Management and Planning Program Helen Harrington Idaho Department of Water Resources/ Idaho Water Resource Board October 16, 2008.
Comprehensive Aquifer Planning Program Status Update Helen Harrington October 22, 2009.
State Water Planning Methodology of Texas Michelle Buckholtz Rebecca Cesa Wyatt Ellertson.
2007 Idaho Climate and Water Forecast Workshop Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
2 1)Familiarize State agency staff with Water Plan Update 2013 information, tools and resources 2)Identify opportunities for State agencies to derive.
WESTCAS - Shortage Impacts on AZ CAP General Manager David Modeer October 29, 2014.
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
Water in California: Self-induced Scarcity Waterscape International Group.
Drought and the Central Valley Project August 2014.
North Idaho Adjudication— Background and Issues September 26, 2007 Dave Tuthill Idaho Department of Water Resources.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Making the Linkage Between Water Management & Planning Rita P. Maguire, President and CEO ACMA 2006 Summer Conference July 27, Tucson, AZ.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Eastern Snake Plain Comprehensive Aquifer Management Plan A Positive Path Forward Hal N. Anderson June 11, 2009.
Statewide Water Needs and future estimated costs September 20, 2011.
WATER ISSUES IN THE EASTERN EUROPE:
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Managing Drought: A Roadmap for Change in the United States
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
EFFECTIVE, EFFICIENT, SUSTAINABLE SOLUTIONS TO COMMUNITY PROBLEMS THROUGH THE COLLABORATIVE EFFORTS AND RESOURCES OF CITIZENS, BUSINESS, GOVERNMENT, AND.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
SAFETEA-LU Reauthorization Process and USDOT’s Reform Proposal November 2008 Todd Kohr Office of the Assistant Secretary for Transportation Policy U.S.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Adjusting Supply and Demand: Technical Analysis to Support the ESPA Management Plan Idaho Water Resource Board Meeting May 17, 2007.
Case Study: Saving the San Pedro River Adam Czekanski 17 November 2005.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Jeff Raybould, Idaho Water Resource Board December 9,2014 Idaho Council on Industry & Environment Statewide Trends for Water Supply State Water Plan Henrys.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
The Source Idaho’s water and the vital role it’s played in the state’s culture and development Idaho Council On Industry and the Environment Water for.
Central Valley Salinity Coalition Developing a Salt and Nutrient Management Plan for the Central Valley.
Reclamation and Hoover Dam It’s All About The Water.
Meeting Colorado’s Future Water Needs: CWCB’s Role The Colorado Water Conservation Board.
BACWA RECYCLED WATER COMMITTEE. Recycled Water Committee 16 agencies represented Coordinate and collaborate on short-term and long-term regional water.
Leveraging Funding and Outcomes through Partnerships Domenica McClintock, Cuyahoga County Board of Health Jan Bayne, Cuyahoga County Department of Development.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Partners in Conservation
Richland Creek Water Supply Program Briefing
Water Resource Management Planning Update
How to Make WIIN a Win for You
Overview of Spokane- Coeur d’Alene Hydrology
Reservoir Operations and Water Supply Planning at Salt River Project
Title XVI Water Reclamation and Reuse Program
Potholes Supplemental Feed Route Project
Florida and Reclaimed Water
The Land and Water Conservation Fund What is Happening, Why It Matters, and What Land Trusts Can Do To Help Presented By: Graham Chisholm, Conservation.
2018 Kern County Water Summit
Importance of Flood-irrigation to Continental Bird Populations
Los Angeles County Department of Public Works
Water Resource Management Planning Update
Washington State Infrastructure Financing
Nebraska Water Infrastructure Funding and Financing Programs
October 29, 2018 Terry Lauritsen, P.E.
Yakima River Basin Integrated Water Resource Management Plan 2011 Yakima Basin Science & Management Conference Central Washington University Ellensburg,
CBEWP Chino Basin Conjunctive Use Environmental
Antelope Valley-East Kern Water Agency
Mutually Beneficial Partnerships in Groundwater Banking Paul Weghorst Irvine Ranch Water District August 15, 2019.
California’s Water Resilience Portfolio
Presentation transcript:

The Treasure Valley Population expected to increase from 625k in 2015 to 1.57 million in 2065 Households expected to increase by 280% - from 226,600 to 638,700 Average temperatures could increase by 1.9 to 6.1 degrees (increasing evapotranspiration by 5- 20% Increase of 109,000 to 188,000 AF/year by 2065 The fasted growing area of the state Population more than double in the next 50-years Warmer temperatures expected Increase of 109k to 188k af in next 50-years Treasure Valley DCMI Water-Demand Projections (2015 – 2065) – SPF Water Engineering, 2016 (Terry Scanlan & Christian Petrich)

Elmore County Water-level declines of 100-200 feet since the 1960’s Current decline of 5-feet per year in areas Annual pumping deficits of 43,000 AF/year West of Boise Aquifer in steep decline 43,000 deficit / year and getting worse Elmore County Water Supply Alternatives Study – SPF Water Engineering, 2017 (Terry Scanlan)

Rathdrum Prairie Aquifer Anticipated population growth of 88,000 by 2045 Maximum daily demand will increase by 61.56 cfs; and the peak hourly demand will increase by 159.41 cfs by 2045 North Idaho: Coeur d’Alene, Post Falls, Hayden, Rathrum, etc. Significant growth and expanded water needs into the future Rathdrum Prairie Integrated Water Resource Management Report – Idaho Water Resource Research Institute, 2015 (Mark Solomon)

Palouse Aquifer (Idaho) 4,874 af/year increase in demand by 2065 2,256 af/year required to stabilize the aquifer Moscow, Idaho and Pullman, Washington area Aquifer needs stabilized – both Idaho and Washington communities are working to develop a plan to address water needs

Idaho Infrastructure Work Group

Meetings in D.C. Idaho needs to get on the same page! Dr. Tim Petty, Assistant Secretary over Water & Science, U.S. Department of the Interior. Don’t come to me with different, conflicting demands for federal partnership opportunities. Form a coalition. Senator James Risch, Idaho (R) Meetings in D.C. We have seen time and time again that collaboration and coalition building leads to the highest opportunity for success Idaho water users recognize need for infrastructure to address different issues throughout the State BUT, different water users have their different “pet projects” and would advocate for those Need to form a Coalition speaking with one voice

Idaho Water Infrastructure Work Group Speaker of the House Chairs of the House & Senate Resource Committees Director, Idaho Department of Water Resources 3 Members (including chair) of Idaho Water Resource Board Stakeholders from throughout Idaho

Original Purpose of Work Group Develop opportunities for federal, state and private partnerships to fund new storage projects in Idaho.

Broadening the Scope Realize the need for stakeholders to speak with one voice on other infrastructure-related issues throughout the state. Not just about $$. Coalition of diverse users have broader political influence to remove regulatory impediments to getting projects done.

Revised Purpose of Work Group Develop and advocate for water supply projects in Idaho through federal, state and private funding partnerships and/or the removal of regulatory hurdles.

Funding & The Removal of Regulatory Hurdles

Federal Funding: WIIN Act Creates fund managed by Reclamation for infrastructure projects Streamlines processes Up to 50% federal funding Reclamation prioritizes projects based on several factors (including cost/benefit analysis) List presented to Congress to identify in legislation (any legislation) After 2019 Omnibus, over $300 million in WIIN Act fund Federal Funding: WIIN Act This is a great act! Streamlines the processes to obtain approval and funding Federal funding is based on federal benefit received from a project

Federal Funding: WaterSMART Smaller projects Broad range of grants Up to 50% cost-share Types: Water and Energy Efficiency Grants Small-Scale Water Efficiency Project Grants Cooperative Watershed Management Program Drought Program Federal Funding: WaterSMART

State Contributions Working with Governor’s office and Legislature to create a fund State partnership on large and small projects Incremental development (long- term savings plan) Working to create a fund and an avenue for state partnerships on projects

Regulatory Hurdles Title Transfer Greater flexibility with facilities Access to prime recharge locations Recharge over Federal Lands Better management of water resources Flood Control Rule Curves Regulatory Hurdles Title transfer allow for greater flexibility in operation of system – i.e. ability recharge through system In Idaho, some of the best recharge locations are on federal land – authorization processes can be quite cumbersome. Working to streamline authority to recharge on federal land through legislation, including the Reclamation Title Revise flood control curves may allow for better management of water resources.

Developing a List

List Categories New / Enlarged Surface Storage Re-Purpose of Existing Surface Storage ESPA Managed Recharge Projects Ground Water Sustainability Projects Small, multi-purpose projects

Anderson Ranch Dam Approved for WIIN Act funding Feasibility / NEPA done by early 2021 Construction begin in 2021 28,000 a/f increase Approx. $40m For new / enlarged storage, we prioritized our list. Anderson Ranch was 1st priority due to WIIN Act funding

Island Park Reservoir Eastern Idaho 12,000-30,000 a/f increase Inexpensive to construct (bladder) Expensive to mitigate (easements)

Minidoka Dam South-central Idaho $250m total cost 50,000 a/f increase Mitigation: freeway & wildlife refuge About 1 mile of freeway would have to be raised

Other Storage Projects Galloway Dam (800,000 a/f) Weiser River Lost Valley Dam Raise (10,000-30,000 a/f increase) Weiser River Basin headwaters Caribou Dam (40,000 a/f) Bear River Each of these have been on Idaho’s radar for many years Have not advanced for many reasons – environmental being the priority reason

Re-Purpose Existing Storage Ririe Reservoir Relaxing flood control rule curves Bear Lake Reduce fall drawdown Maximize storage Bear Lake: Power company draws lake down in fall. Working to acquire water rights and authorizations necessary to minimize drawdown

Recharge Projects Roberts Pipeline $108m Deliver water from Snake River to Mud Lake area for recharge Prosperity Canal (aka “Canal to Nowhere”) Large managed recharge facility Deliver water into desert for recharge Longer retention time

Sustainability Projects Mountain Home (Elmore County) Pipeline from Snake River to Air Force Base $70m Palouse Basin / Moscow, ID Pump water to basin to satisfy existing and future needs Working on concepts / plans

Small Multi-Purpose Projects In-canal projects with multiple purposes Regulating reservoirs; Water quality; Sediment control; Flood control Usually less than $1,500,000