DPAR Training Material Nordin Mimouni – Supplier Quality Manager Rev

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.1 Principles for budgeting construction and implementation.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
© Solution Selling, Inc. •
PPAP Requirements Training
First Article Inspection Report
Variation Management of Key Characteristics
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Chapter 24 - Quality Management 1Chapter 24 Quality management.
Entrepreneurship: Ideas in Action 5e © 2011 Cengage Learning. All rights reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
8-Aug-15 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work.
Chapter 24 - Quality Management
First Article Inspection
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Fundamentals of ISO.
BRC Food Safety Quality Management System Training Guide
BASIC IRRS TRAINING Lecture 7
Visit us at E mail: Tele:
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Quality Control Concepts. Outline 1.Introduction 2.Quality Control 3.Quality Assurance 4.Total Quality Management 5.Quality Tools 6.Summary.
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
Supporting Industry Change Planning: Risk, Issue & Milestone Assessment Process Clarifications 04/08/2014.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Project management Topic 1 Project management principles.
Assessment Entry Module (AEM) Kick-off November 15, 2012 interRAI Preliminary Screener Toronto Central LHIN.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Supplier Performance Development Process
DOCUMENT CONTROL BASICS. Less clutter Avoid missing files More professional look?
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
Eaton Supplier APQP Process Overview
Production Part Approval Process
Eyes Wide Open A little about us…..
Process engineering Quality controls.
Product Lifecycle Management
Part Approval / Compliance Data Submission via Jotform.com
Product Process Change Notification PROCESS
Quality Control and Quality Assurance
CallTower Implementation Process Overview
REPORTING THROUGH THE EMS
ECE361 Engineering Practice
BUSINESS PROCESSES MAP
44th Meeting of the Standing Committee Bonn, Germany, October 2015 Report on activities of the Strategic Plan Working Group Ines Verleye,
Fundamentals of ISO.
Lesson 4 Systems Engineering Plan Exercise Team #
First Article Inspection
DSQR Training Supplier Quality Manual
First Article Inspection (Per AS9102)
Supplier Performance Development Process
Product Development Scenario Overview
Supplier Request for Engineering Approval
SQA01 Guidance Material: FAI Review
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
This PPAP File Is Under Construction
First Article Inspection
Production Part Approval Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
DMAIC STANDARD WORK TEMPLATE
Training Outline Definitions CoPQ – What’s inside???
How to conduct Effective Stage-1 Audit
Supplier Performance Development Process
13.0 PROCESS CAPABILITY SPECIAL TOPICS
DMAIC STANDARD WORK TEMPLATE
Advanced Product Quality Planning (APQP) and Production Part Approval Process (PPAP) Training Material Nordin Mimouni – Supplier Quality Manager Rev. 01.
First Article Inspection (Per AS9102)
Supplier Quality Review Training Material Nordin Mimouni – Supplier Quality Manager Rev. 1 – June 26th 2017.
Advanced Product Quality Planning 2nd Edition
9-3 Applying for Employment
Presentation transcript:

DPAR Training Material Nordin Mimouni – Supplier Quality Manager Rev DPAR Training Material Nordin Mimouni – Supplier Quality Manager Rev. 3 – Sep. 19th 2017

Training Outline DPAR Purpose and objectives DPAR Participants Understanding the DPAR Template Supplier Expectations

DPAR Purpose to achieve Zero Defects and Time to Market DPAR stands for Design, Process and Assembly Review Purpose for DPAR process is to get a commitment from Supplier and CAMSO cross functional teams regarding feasibility of a material. We ensure we clarified all requirements in terms of manufacturability, quality, packaging definition and timing and we ensure Supplier understand them. This will minimize any risk and cost avoidance upfront. Objectives: Create/Complete actions to agree on a drawing and measurement method for tool kick off Target for supplier to provide parts 100% to drawing at PPAP submission on-time DPAR required for each new design developed by CAMS0, Supplier Change Request (source, tooling, material…), new source, Customer Request The owner of this activity is Procurement Project Leader Note: The word “shall” indicates mandatory requirements. The Word “should” indicates a recommendation. Ask Participants what DPAR is and what DPAR is not Write on paperboard pros and cons

DPAR Participants Participants Support (if necessary) CAMSO – Procurement Project Leader CAMSO – SPQD Function CAMSO – Facility QA CAMSO – Product Engineer Supplier - Representative(s) (covering functions: Engineering, Tooling, Quality, Account Management, Sales) CAMSO – Project Manager CAMSO – Tool Engineer CAMSO – Logistics CAMSO – Industrial Engineer CAMSO – Raw Material Expert Supplier – Tool Maker Supplier – Logistics

Understanding the DPAR Template Sections Sum up of DPAR steps 1 Sections to be reviewed, fulfilled and submitted by Supplier to CAMSO prior to DPAR meeting CAMSO Team shall also review and fulfill those sections prior to DPAR meeting 2 You can open the file in parallel

Understanding the DPAR Template Tab 1: Design Review CAMSO Input: Information fulfilled by CAMSO Procurement Project Leader before meeting 1 CAMSO Input: fulfilled by Procurement Project Leader, reviewed and agreed during DPAR meeting 3 CAMSO/Supplier Input: fulfilled by Procurement Project Leader, these fields shall list all data shared during DPAR (drawings, specifications, CAD data, systems screenshots…) 2 3 4 CAMSO/Supplier Input: actions to be prepared by assigned responsible

Understanding the DPAR Template Tab 1-2: Measurement Agreement – example – Steps 1 and 2 CAMSO Input: Information fulfilled by CAMSO Engineering and submitted to Supplier before the DPAR meeting CAMSO Input: Information fulfilled by CAMSO Engineering + SPQD and submitted to Supplier before the DPAR meeting 1 2 PPAP: Production Part Approval Process Cpk: Process Capability Index. Adjustment of Cp for the effect of non-centered distribution Ppk: Process Performance Index. Adjustment of Pp for the effect of non-centered distribution

Understanding the DPAR Template Tab 1-2: Measurement Agreement – example – Steps 3 and 4 Supplier Input: Information fulfilled by Supplier and submitted to CAMSO before the DPAR meeting Supplier Input: Information fulfilled by Supplier and submitted to CAMSO before the DPAR meeting The 3 sections have to be prepared (P3, PPAP, Production) 3 4 Measurement frequency: Poka Yoke: mistake-proofing system SPC: Statistical Process Control MSA: Measurement System Analysis IPS: Initial Process Studies

Understanding the DPAR Template Tab 1-2: Measurement Agreement – example – Step 5 CAMSO Input: Information fulfilled , reviewed and agreed during DPAR by SPQD: Agreed/Not Agreed 5

Understanding the DPAR Template Tab 2: Process Review CAMSO/Supplier Input: fulfilled by Procurement Project Leader, these fields shall list all data shared during DPAR (drawings, specifications, CAD data, systems screenshots…) CAMSO Input: fulfilled by Procurement Project Leader, reviewed and agreed during DPAR meeting CAMSO/Supplier Input: actions to be prepared by assigned responsible 1 2 3

Understanding the DPAR Template Tab 3: Quality Review CAMSO/Supplier Input: fulfilled by Procurement Project Leader, these fields shall list all data shared during DPAR (drawings, specifications…) CAMSO Input: fulfilled by Procurement Project Leader, reviewed and agreed during DPAR meeting CAMSO/Supplier Input: actions to be prepared by assigned responsible 1 2 3

Understanding the DPAR Template Tab 4: Packaging Review CAMSO/Supplier Input: fulfilled by Procurement Project Leader, these fields shall list all data shared during DPAR (drawings, specifications…) CAMSO Input: fulfilled by Procurement Project Leader, reviewed and agreed during DPAR meeting CAMSO/Supplier Input: actions to be prepared by assigned responsible 1 2 3

Understanding the DPAR Template Tab 5: Procurement Review CAMSO/Supplier Input: fulfilled by Procurement Project Leader, these fields shall list all data shared during DPAR (drawings, specifications…) CAMSO Input: fulfilled by Procurement Project Leader, reviewed and agreed during DPAR meeting CAMSO/Supplier Input: actions to be prepared by assigned responsible 1 2 3

Understanding the DPAR Template Tab: PPAP Submission Index CAMSO Input: fulfilled by SPQD, reviewed and agreed during DPAR meeting 1

Understanding the DPAR Template Tab: PPAP Submission Index CAMSO Input: this is an aid to remind the Team of PPAP manual chapters 2 1 CAMSO Input: this is an aid to remind the Supplier of Chapters to be retained Chapters to be submitted For each PPAP level NOTA: whatever PPAP level we ask for, ALL chapters are required. The only difference is the submitted chapters

Understanding the DPAR Template Tab: PPAP Submission Index Supplier Input: Supplier confirms submitted documents at PPAP submission Nota: this PPAP submission index shall be attached to PPAP package CAMSO Input: SPQD selects PPAP level and all required documents during DPAR 1 2 CAMSO/Supplier Input: fulfilled by SPQD during DPAR based on comments from CAMSO and Supplier 3

Supplier Expectations Review each “note” and “dimensions” from drawing for concerns Check measurability for each characteristic Proactively suggest solutions for each concern identified Suggest improvements for more robust production (quality and efficiency) Promote open and honest communication with CAMSO Address issues/concerns as soon as possible Response in a timely manner to achieve project milestones Supplier responsible to meet agreed timing Supplier representatives shall sign off each DPAR tab as a confirmation of feasibility