PROGRESS on EE VPTs, Dees D Cockerill

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Peter Hobson - Brunel University, UK3 July 2003 VPT 4 Tesla testing  An automated characterisation facility based at Brunel has been commissioned to handle.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Tracker Summary Alan Bross MICE CM October 10, 2007.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
B W Kennedy, RAL PPD VPT testing status Visual inspection of VPTs The RAL 1.8T test rig VPT testing at RAL High-field testing at Brunel Bruce Kennedy,
University of Wisconsin
BSS Prep work at CERN and Acceptance of Parts
SCHEDULE Nov 1st - Assembly Table Complete
T1 Electronic status Conclusions Electronics Cards:
Support Structure Fabrication
Status Brussels GANTRY
Quick link: cern.ch/cmstb04


4x5 SC array for the test beam in Apr 2007
Studies of the effect of the LHC cycle on
UK CMS Oversight Committee Mtg
Cavity-Compton Regular Meeting design report summary
Potential Minor Release Drop 4 Timeline & Scope
Potential Minor Release Drop 4 Timeline & Scope
Reviewing Abbreviations
Progress on cryostat design and production
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

PROGRESS on EE VPTs, Dees 1 - 4 D Cockerill 31.1.2008 CMS Jim 31.1.2008

VPTs To PNPI ? CMS Jim 31.1.2008

VPTs – put aside/rejected at RAL Total of 1203 VPTs put aside or rejected in RAL/Brunel tests Total of 14898 VPTs accepted for use at CERN in RAL/Brunel tests Total of 14648 VPTs needed Put aside or failed in 1.8T rig at RAL or 4T rig at Brunel CMS Jim 31.1.2008

Dee progress Bat 27 14 naked SCs per week for past 2 weeks now at > SC 386 Projections (updated 1.2.08) Dee1 ` Motherboard trigger mapping from next week on SU#1 Dee2 SC mounting Finish next week Validation J-L Faure, J-M Raymond 11-15 Feb Dee4 Dismount 20 SCs in 867 5–15 Feb Dee3 Fibres onto BP 18–22 Feb Start SC mounting 21/22 Feb CMS Jim 31.1.2008

Dee progress CMS Jim 31.1.2008

Dee1 assembly Uva fibres UVa stability fibres installed on LH quad LV cabling started on Dee1, using LV jig plates for correct positioning. CMS Jim 31.1.2008

Additional info CMS Jim 31.1.2008

VPT leakage currents, CERN acceptance rig CMS Jim 31.1.2008

VPT visual inspection, off-axis anodes Yield at 1.8T Pedestal width CMS Jim 31.1.2008

SC assembly Crystal delivery, naked SC assembly profile and HV tested SCs Over halfway in production for naked and tested SCs All naked SCs for EE by 4 June 2008 SCs HV tested, ready or mounted CMS Jim 31.1.2008

Dee assembly – SC mounting Dee1 SC mounting completed on Mon 19 Nov Smooth follow on for SC mounting on Dee2, 1st quad done Expect to complete SC mounting on Dee2 by Feb 14 Dee3 SCs mounted by 10 Apr Dee4 SCs mounted by 20 Jun (assuming 9 weeks per Dee if 17.5 SCs mounted per week) CMS Jim 31.1.2008

From VPT to mounting on Dee Activity Test/comment VPT reception/sorting HV test VPT - crystal gluing 75/d VPT/crystal multibox Naked SC assy 14/w HV card mounting Shipment Mount on loader arm Mount fibres/bolt to Dee CMS Jim 31.1.2008