TGs LA Closing Report Date: Author: January 2011

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
TGax March 2017 Closing Report
TGaf San Francisco Closing Report
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2014 doc.: IEEE November 2017
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
TGz Los Angeles Closing Report
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
HTC 34; 5656 AE Eindhoven, the Netherlands
TGaf Waikoloa Closing Report
TGs San Diego Closing Report
TGs Montreal Closing Report
TGs Atlanta Closing Report
TGs Waikoloa Closing Report
IEEE Motions in July Plenary DCN:
TGaf Geneva Closing Report
HTC 34; 5656 AE Eindhoven, the Netherlands
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGs Waikoloa Closing Report
TGaf San Antonio Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGs Process, November Date: Author: November 2009
Task Group 4 Low Rate WPANS Opening Report
TGaf Waikoloa Closing Report
Mar 2010 Closing Plenary Motions
TGu Motions Authors: March 2010 Date: March 2010
Mar 2010 Closing Plenary Motions
TGs Waikoloa Closing Report
Mar 2010 Closing Plenary Motions
TGs Dallas Closing Report
IEEE TGaf Palm Springs Closing Report
TGu Teleconference Motions
TGak November Closing Report
September 2009 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
2019 March TGba Closing Report
TGs Waikoloa Closing Report
TGs Singapore Closing Report
TGaf Orlando Closing Report
TGaq Closing Report Date: Authors: July 2016 July 2016
TGae Closing Report – July 2011
TGn Closing Report – September 24 ‘09
TG 1 November Session Opening Report
TGu Motions Authors: March 2010 Date: March 2010
TGaf San Antonio Closing Report
TGs San Diego Closing Report
IEEE aj May Closing Report
TGaq Closing Report Date: Authors: July 2015 July 2015
TGaq Closing Report Date: Authors: March 2015 March 2015
TGax November 2017 Closing Report
IEEE TGaf Beijing Closing Report
TGaj editor report for Sponsor Ballot
Presentation transcript:

TGs LA Closing Report Date: 2011-01-20 Author: January 2011 November 2009 doc.: IEEE 802.11-09/1091r0 January 2011 TGs LA Closing Report Date: 2011-01-20 Author: Name Address Affiliation Phone Email Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands Philips +31 40 2749743 Dee.Denteneer@philips.com Dee Denteneer (Philips) Guido R. Hiertz (Philips)

TGs closing report for the January 2011 meeting. November 2009 doc.: IEEE 802.11-09/1091r0 January 2011 Abstract TGs closing report for the January 2011 meeting. Extensively discussed most likely timeline, which would lead to a request for Unconditional Approval in July and a publication date around September 2011. Worked on resolutions to the comments received during the first Sponsor Ballot. Expect a first recirculation after the TG s ad hoc in Munich Dee Denteneer (Philips) Guido R. Hiertz (Philips)

January 2011 Status Before meeting TGs passed its first Sponsor Ballot based Draft 8.0 with 95.6% approval rate (closed: January 10 2011). We received 367 technical comments During meeting Reviewed the timeline, joint with a REVmb and in the editors’ meeting. Resolved comments Dee Denteneer (Philips)

January 2011 Timeline review During meeting, we reviewed the timeline, joint with a REVmb and in the editors’ meeting; see 11-11/107r1. Currently envisaged scenario date Recirculations February-June, 2011 Request EC Unconditional Approval to go to Revcom July 2011 Get on September Revcom agenda Before 29 July 2011 Revcom approval September 2011 Publication Dee Denteneer (Philips)

January 2011 Comment resolution During meeting, we resolved 290 comments, or approximately 80% of the comments received in the recirculation; see 11-11/0027r5. Straw polls gave clear directions on the resolutions of remaining comments. editorial technical received open Part of no vote 7 113 27 Not part of no vote 177 33 70 12 Dee Denteneer (Philips)

Plan First recirculation targeted mid february after the Eindhoven ad hoc, February 7-9, hosted by Philips Prepare tutorial for March plenary