PPC-Energy: Update on Window 1 RE-IPP Procurement Programme. 07 June 2012 1.

Slides:



Advertisements
Similar presentations
NET METERING & FEED IN TARIFF REVIEW IURC Technical Conference
Advertisements

1 Making Contract Opportunities and Awards More Transparent Ahmet Arif Sezgin Public Procurement Authority of Turkey Rabat 03 April 2008.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
The EUROSTUDENT view on equity Brussels, 07 November 2012 Christoph Gwosć Findings from EUROSTUDENT IV
INTERREG III C: Past experiences and future expectations on Interregional Co-operation Brussels, Thomas Wobben Verbindungsbüro des Landes Sachsen-Anhalt.
The Implementation Structure DG AGRI, October 2005
- GDP 2011 versus 2010 – increase by 5.5%
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
1 Solicitations/Advertisements Solicitations/Advertisements
ZMQS ZMQS
Renewable Energy IPP Procurement Programme Window two Preferred Bidders announcement 21 May 2012 Slide 1.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
NIH RESEARCH CONTRACTS
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Office of Operations 2010 Fall Conference State Agency Compliance with Prompt Contracting Regulation Dan Agosto, John Moriarty & Patricia ODonnell.
EU Remedies Directives Update Florence Gregg figpc ltd, M:
1 Cost Estimating Comparative Study The UK MoD Perspective Defence Procurement Agency (DPA) U.K. Ministry of Defence (MoD) Pricing & Forecasting Group.
Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
Risk Sharing in Drug Development Richard Malcolm, Ph.D. CEO, Acurian September 15, 2011 | BIOCOM.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
Department of Finance and Administration Office of the Mississippi Management and Reporting System 1 MAGIC Implementation Services Discussion February.
Panel of Accident Investigators RAF/2013/00015 Compulsory Briefing Session July 2013 The Road Accident Fund.
VOORBLAD.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
15. Oktober Oktober Oktober 2012.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
# 1 October 2003 Petroleum Reserves & The Needs of Financial Reporting Michael Lynch-Bell Partner in Charge Energy, Chemicals & Utilities, Transaction.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Public Procurement in Macedonia Achievements in 2011.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Addition 1’s to 20.
25 seconds left…...
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Januar MDMDFSSMDMDFSSS
Week 1.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
Get Britain Building – key points for partners Versha Koria, Area Manager South & South West HCA 2 nd March 2012.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
SOUTH AFRICA’S RENEWABLE ENERGY INDEPENDENT POWER PRODUCER PROGRAMME (REI4P) 2014 REVIEW REPORT:
Republic of South Africa IPP Procurement Programme
Offsite Storage RAF/2013/00023 Compulsory Briefing Session 16 August 2013 The Road Accident Fund.
Duquesne Light Company Request For Proposal
African Aviation Training Organization
MyFloridaMarketPlace Roundtable July 1, 2003 MyFloridaMarketPlace.
WIOA Timeline and Action Plan for States
Mi-Project Program Breakout Session MDIT/DMB. IT Supplier Forum Breakout Session: Mi-Project Program Mi-Project  Introductions  Diana Quintero, MDIT.
Overview of the South African Renewable Energy Independent Power Producer Programme (IPP Program) Bruce Linke Finance and Projects 30 April 2012.
Renewable Energy IPP Procurement Programme: Summary of Evaluation Findings 07 December
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
6/8/12 PPC-Energy: Update on Window 1 RE-IPP Procurement Programme. 07 June
Background The Department has adopted an IRP with 42% target of electricity generation from renewable energy sources 03 rd August 2011 the Department.
Small Projects IPP Procurement Programme First Stage 2 Bid Submission Phase Preferred Bidders’ Announcement 4 October 2015.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
IPP Bidders Conferance LICENSING OF IPP PREFERED BIDDERS DoE IPP BIDDERS CONFERENCE – Presented by TAMAI HORE.
Progress on the Renewable Energy IPP Procurement Programme
Presentation transcript:

PPC-Energy: Update on Window 1 RE-IPP Procurement Programme. 07 June

Presentation Content Introduction. RE-IPP Procurement Process Background. Overview of Evaluation Process (bid window 1). Sequence of event. Evaluation Composition. Preferred Bidder Results and MW allocation. Financial Evaluation. Bid Window 2 progress. 2

Introduction The procurement documents were released on the 03 of August 2011 and compulsory bidders conference for the first and second window on the 14 of September The document provides for procurement of 3725MW in five different rounds subject to the availability of the MW The Department, under bid window one: – Received 53 Bids by the 4 th of November – Announced 28 preferred bidders in December 2011 With regards to bid window two: – Received 79 bids on the 5 th of March 2012 – These bids amount to 3255MW whilst the cap was 1275MW 3

Procurement documents: Part A: General Requirements and Rules Part B: Qualification Criteria Part C: Economic Development Request for Proposals Wind PPA Solar PPA Small hydro PPA CSP PPA…….etc Power Purchase Agreement Contract between the IPP and the Department Obligation for IPP to deliver on economic development In buyer default – Department to pay the IPP Implementation Agreement Procurement Process Background 4

Procurement Process Background: IPPGovernmentEskom Government Framework Support Agreement Implementation Agreement Power Purchase Agreement Contractual Arrangement 5

Request for Proposal (RFP) Requirements Rules RFP Part A Environment Land Economic Develop Finance Technical Price Capacity RFP Part B Qualification Price Job creation Local content Preferential Procurement Enterprise Development Socio-economic development RFP Part C Comparative Evaluation Procurement Process Background 6

PART C EVALUATION 7 Price 70 % 30 % Economic Dev Job creation Socio -Economic Local content Preferential Procurement Job creation Socio -Economic Local content Preferential Procurement Project cost Rand/MW Project cost Rand/MW

OVERVIEW OF EVALUATION PROCESS (BID WINDOW 1) 8

9 EventDate Ministerial determination (in consultation with National Energy Regulator of South Africa) 3, 725 MW of new generation capacity required by 2016 Q 2 of 2011 Programme launch DoE issued a Request for Proposals 31 July 2011 Procurement uploaded on DoE website Interested Bidders requested to register on a dedicated programme site: 03 August 2011 Compulsory Bidders Conference Interested Bidders taken through the bidding process Drew interest from across the globe 14 September 2011 Close of 1 st Bidding Window Evaluations ensued from 04 to 28 November 2011 Conducted by international and local financial, technical and legal experts 04 November 2011 Announcement of Preferred Bidders 28 preferred out of 53 Projects need to reach financial close by June December 2011 Sequence of Events: Bid Window 1

Evaluation team: International reviewers Legal review – Linklaters (UK) Technical review – Blueprint consult Financial review – cross-moderation between the two Financial Advisory firms Governance review – Ernst & Young Legal evaluation team Bowman Gilfillan Edward Nathan Sonneberg Ledwaba Mazwai Webber Wentzel BKS Technical evaluation team Mott Macdonald Financial evaluation team Ernst & Young PWC International reviewers Legal review – Linklaters (UK) Technical review – Blueprint consult Financial review – cross-moderation between the two Financial Advisory firms Governance review – Ernst & Young Legal evaluation team Bowman Gilfillan Edward Nathan Sonneberg Ledwaba Mazwai Webber Wentzel BKS Technical evaluation team Mott Macdonald Financial evaluation team Ernst & Young PWC Evaluation Streams: Legal Environment Environmental Authorization Legal Land Land right Notarial lease registration Proof of land use application Legal Commercial Acceptance of the PPA Project structure Economic Development Contributor status level 5 Compliance with threshold Financial Full and partial price indexation Technical Eligibility Energy resource Legal Environment Environmental Authorization Legal Land Land right Notarial lease registration Proof of land use application Legal Commercial Acceptance of the PPA Project structure Economic Development Contributor status level 5 Compliance with threshold Financial Full and partial price indexation Technical Eligibility Energy resource Evaluation Composition 10

Renewable Energy IPPs: Window 1 Preferred Bidder 11 Allocation to Preferred Bidders: Window 1 Allocation per Determination Still Available MW allocation per Determination MWPercentageMWPercentage Solar PV % % Solar CSP % % Wind % % Biomass % %12.50 Biogas % %12.50 Landfill gas % %25.00 Small Hydro % %75.00 Total MW % % Total Capacity - Bids Received Percentage Preferred Bidders66.5% Number of Passing Bids28

Contracted Number of Jobs: Window 1 & Window 2 Compared. 12 Jobs during constructionJobs during operations First Round Second Round

FINANCIAL EVALUATION (BID WINDOW 1) 13

Introduction Majority of bids to a generally high standard; No bidder submitted a fully compliant Part B submission; Significant number of failures related to non-material omissions and inconsistencies perhaps reflecting tight timeframe for bid preparation; 14

Financial Evaluation Key areas of shortcoming included: Letters of support not provided by parent company &/or funders; Rationale and quantum of success fees not fully described; Limited information on hedging strategies; Incomplete financial accounts for equity participants Calculation of partial/fully indexed tariffs not done comprehensively. 15

Financial evaluation results Results post-clarification: Solar PVWindCSPHydroTotal Pass (MW) No. Projects Fail (MW) No. Projects

Financial Analysis – Tariffs Majority of bidders have priced at or just below the applicable technology price cap; Similarly most bidders have shown a strong preference for a fully indexed tariff; This may reflect bidder expectation that Round 1 would be undersubscribed. 17

Bidding Price Differential: Window 1 & Window 2 Compared. 18 Technology 2 nd Round Average 1 st Round AverageDifferencePrice Cap Solar PhotovoltaicR R %R Onshore WindR R %R Small HydroR %R Concentrated Solar Power R R %R Landfill GasR

OVERVIEW OF EVALUATION PROCESS (BID WINDOW 2) 19

20 Financial Investment: Bid Window 2 Number of Projects Net Capacity (MW) Total Project Cost (R' ) Concentrated Solar Power Northern Cape150R Landfill Gas Gauteng114R 237 KwaZulu Natal13R 52 Onshore Wind Eastern Cape10619R Northern Cape2238R Western Cape10599R Solar Photovoltaic Eastern Cape6190R Free State4145R Gauteng3136R Limpopo4127R Mpumalanga19R 248 North West367R Northern Cape23799R Western Cape7221R Small Hydro Free State28R 202 Northern Cape110R 498 Grand Total R

Preferred Bidders Geographic Distribution 21