30th Annual State Construction Conference

Slides:



Advertisements
Similar presentations
Critical Approval Commissioner/ State Board of Education Commissioner/ State Board of Education Concept Conference s Concept Review Review and Approval.
Advertisements

Internews Network Ukraine Media Project (U-Media) Evidence-based Local Capacity Development in Ukraine October 2012.
American Recovery and Reinvestment Plan District Six Economic Stimulus Information Meeting FDOT ROADWAY MAINTENANCE AND CONSTRUCTION PROJECTS – PROCURED.
April 30, 2009 County Accountants’ Conference. Merry Daher Federal Aid Plans Engineer Phone: (651) Fax : (651)
Cameron County Distributed Renewable Energy Technology Stimulus Grant Robert Lopez | February 18, 2011.
Presented to: 33 th Annual Airport Conference Hershey, PA By: Tom Felix Date:March 4, 2010 Federal Aviation Administration AUDITS OF AIP & ARRA PROJECTS.
Energy Grant Program. Program Overview ARRA Funds - $20 Million Solar Projects - 30% Energy Efficiency Upgrades - 70% “The projects shall meet the requirements.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
US Dept. of Housing and Urban Development CDBG-R Closeout Procedures.
State Auditor’s Office March 10, 2010 Brad White, CPA Single Audit Coordinator.
ARRA Training Accountability and Reporting Water Quality/Drinking Water Program Overview OCTOBER 05, 2009 Trenton, New Jersey NJ Environmental Infrastructure.
Improving Permit Review and Approval for Small Solar Photovoltaic (PV) Systems Fire Safety Requirements November 1, 2012 Presented by: Stuart Tom, ICC/LABC.
Facilities and Infrastructure Requirements
What’s New - QAM Update #6 Author Stuart Hartley, FCPA, FCA, CAIT EFFECTIVE IMPLEMENTATION OF YOUR FIRM’S QUALITY CONTROL SYSTEM.
July 30, SWCAP Recoveries. July 30, SWCAP Recoveries Recoveries mean the recovery of indirect costs from the federal government. Indirect.
2015 CONAWAY CONFERENCE Consultant Inspection & Prequalification Lyle Flower Administrator Office of Consultant Services.
Special Education Restructure Local Annual Plan Application for Federal Funds (Title VI-B) Individuals with Disabilities Education Act (IDEA 2004)
Jason Martin February 2013 Design Section Engineer’s Manual 1.
MURK Presented By Awni Alsous, MURK Engineer 2010.
Susan Wyatt Sedwick, PhD, CRA Associate Vice President for Research and Director, Office of Sponsored Projects Campus Briefing – September 9, 2009 The.
ACEC-Yukon Steven Bartsch, P.Eng. President Presented to: Yukon 1 St Annual Industry Conference Whitehorse, February 17, 2015.
Brussels, 4 June 2010 Introduction I. HOTREC – an umbrella II. HOTREC Fire safety Project.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
1 Construction Engineering in State Highway Projects Legislative Audit Bureau September 2009.
OSE Plan Streamlining of Hazardous Waste storage, handling, transportation & disposal at all locations as per new legal requirement. (Oct.03.
Suspension and Debarment in the U.S. Department of Transportation DOT Office of Inspector General Presentation at National Fraud Awareness Conference on.
FOI Retreat: July 2008 USING THE NEXT 6 MONTHS EFFECTIVELY Format: USING THE NEXT 6 MONTHS EFFECTIVELY Format: Likely types of FOI requests – the need.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
How Do Students with Disabilities Participate in the Standardized Testing and Reporting (STAR) Program? December 9, 2009.
September 21, 2011 OVRD Director’s Report Occupational Information Development Advisory Panel Quarterly Meeting.
1 CONNECTICUT DEPARTMENT OF TRANSPORTATION’S ARRA REPORTING June 1, 2009 R2 CTDOT Internal Version.
2010 AHCA/NCAL National Quality Award Program - Bronze Overview – Session Two Courtney Krier Tim Case.
USDA Food and Nutrition Service WIC Program 1 Revised APD Process for EBT WIC EBT Users Group Meeting July 23, 2014 Erin McBride Technology Specialist.
Facilities and Infrastructure Requirements
Preparing and Submitting PS&E Packages What does ODOT need? Local Agency Project Delivery Conference May 2 & 3, 2006.
CSBG OVERSIGHT NASCSP Mid-Winter Conference February 2012.
1 Norwegian experiences energy efficieny and energy management in industry according to ISO International training conference on energy efficiency,
2009 WASHINGTON STATE BUILDING CODE (WAC 51-50) RESIDENTIAL CODE (WAC 51-51) FIRE CODE (WAC 51-54) CARBON MONOXIDE ALARM REQUIREMENTS IN THE 2009 WASHINGTON.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
WORKFORCE ADVANCEMENT Scholarship Program  Double the number of scholarships awarded annually  Recognize the importance of operators to the equation,
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
Mt. San Jacinto Community College District Five Year Construction Plan
2011 National Airport Civil Rights Training Conference
City Government (Obtaining Permits).
New Designed OL Office.
Pre-Proposal Conference
Introduction of Code Contingency Guidelines Document
Quality Management Systems – Requirements
Designers’ Manual Overview and Chapter Contents
MODULE ONE Background to the GBV Guidelines
Creating Student Learning Objectives
Navigating FDOT Specifications and Standards
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
Project Development Quality Program QA/QC – What does ODOT need?
Delta Sigma Theta Sorority, Inc.
Presented to the City Council by
Data Governance and the Ohio Educational Research Center (OERC)
EVERYTHING YOU NEED TO KNOW ABOUT THE NAWIC MANUAL
Embarking on the journey…
Introduction of Code Contingency Guidelines Document
The Survival Plan.
WESLEYAN P-FAFS-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Supplementary Data Tables, Organizational Trends
Richland Creek Water Supply Program Program Update
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Council Orientation October 24, 2017
DRAFT ISO 10004:2018 Revision Overview Quality management — Customer satisfaction — Guidelines for monitoring and measuring ISO/TC176 TG 01.
Presentation transcript:

30th Annual State Construction Conference SCO Office Overview & Changes Design Review Section March 24th 2011

Organizational Chart Design Review Construction Management Plan Review + Tent permits Construction Management FCAP + Construction Admin (monitoring) Design & Construction Services Consulting Services + Electrical Inspections + Contracts Admin

SCO Website Changes State Construction Manual, Revised Restructured the documents New or revised documents: Electrical Guidelines (revised, effective July 2011) Fire Alarm Guidelines (new) Sprinkler Guidelines (new) Roofing Design Criteria (in revision) Added features: Status of Projects under design review Status of Projects under construction Design Review Requirements and Exemptions Arrangment of Documents in accordance to process

Design Review Requirements ARRA Project (American Recovery & Reinvestment Act) Performance Contracting (IGA Investment Grade Audit Report) University Download Project (<$2M)