Instability measurement plans at ATF

Slides:



Advertisements
Similar presentations
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Advertisements

SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Dream test facilities for Damping ring R&D October 25 th, 2012 Yannis PAPAPHILIPPOU CERN.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Beam Test status and Plans of the ILC Main LINAC BPM
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Experiments on Fast Ion Instability at PLS
Re-entrant BPM R&D for ILC Main Linac
Status of Fast Ion Instability Studies
CLIC Damping ring beam transfer systems
Oversea collaborators
WP11: electron and proton beam testing
Status of ATF/ATF2 and machine schedule in this fall
Utilization of KEKB for ILC R&D
Fast Ion Experiments at ATF
Recent Electron Cloud Studies at CESR and Future Plans
Junji Urakawa (KEK) for ATF International Collaboration
Pol. positron generation scheme for ILC
ATF Intrabeam Scattering Results
Fast ion instability WP 15
Junji Urakawa ( for collaborators ) March KEK at LNF
Electron Source Configuration
INFN and the ILC S. Bertolucci, INFN.
CLIC damping rings working plan towards the CDR
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Status of CTC activities for the Damping rings
CEBAF Pulsed Operation for JLEIC Electron Injection
Proposal for a CESR Damping Ring Test Facility
Damping Ring parameters with reduced bunch charge
Presentation transcript:

Instability measurement plans at ATF Junji Urakawa ( for collaborators ) at ILC Damping Rings Workshop – ILCDR07 2019/2/25 3rd ILCDR07

Experimental condition for single bunch instability study at ATF Damping Ring Bunch intensity : 0.3 to 3 x 1010 electrons/bunch Bunch length : 5mm to 10mm Energy spread : 0.06% to 0.1% Transverse emittance : ~1nm horizontally, ~10pm vertically Necessary effort to achieve above condition: 1. Upgrade of ATF Linac injector system : we will change modified photo-cathode RF gun in coming spring. 2. Damping Ring beam tuning to keep a good flat beam. 3. Control on-coupling and off-coupling to evaluate intra-beam effect. 2019/2/25 3rd ILCDR07

Photo-cathode RF Gun Manufacture for New injector of KEK-ATF 2001 2007 2019/2/25 3rd ILCDR07

ATF Beam Diagnostic System for single bunch instability study XSR monitor Bunch length monitor (Bunch profile) CSR monitor Precise energy spread monitor at Extraction line Current monitor,--- 2019/2/25 3rd ILCDR07

Measured beam profile by XSR monitor in normal vacuum condition Single bunch/single train , 2×1010 bunch/train Ave: 2×10-7 Pa X : 49.5±2.3 mm Y : 8.1±0.7 mm This profile was appeared on normal beam operation 2019/2/25 3rd ILCDR07

Bunch Length Measurement (Synchronized Streak Camera) 2019/2/25 3rd ILCDR07

CSR monitor location Remove all wigglers and replace the chambers to BH1R.10 Detector block Waveguide BH1R.11 SD1R.10 QM21R.1 SF1R.10 QM20R.1 Ceramic flange Waveguide corner block Remove all wigglers and replace the chambers to circular one. Wiggler Z H 1 8 R V L W . 2 3 4 M 9 T Q F 5 D o v a b l e B m - u p ( X ) Z H 9 R S F 1 . D 8 V 7 6 Q M 2 3 B P 4 Z W 2 R S F 1 . D 3 9 Q M 8 B P V H 4 5 B W 1 R . 2 3 Z Z V 1 9 R Q F 2 . 8 H 7 M ( 6 ) 5 4 3 6 B P M . 2 7 8 9 3 1 4 Z V R 5 Q F M S 4 T Z H 5 8 M B 1 T K I S 3 . 2 9 C H X ( Z 5 ) 4 B P M . 1 5 6 H R 9 8 2 3 4 Q F 1 X B S 2 ( Z ) 3 H . D V 6 C K I M T 1 X Z V 5 C 2 4 ( S ) L B H 7 o m p t n h a b e r 6 x , y Q K 3 W K Z H 2 X K I C E R Q F 3 4 D 5 6 V 7 8 1 9 B e a m u p M L M L 9 X 1 3 4 ( S 6 ) 5 H i g h R e s W 2 C E 1 R V Z 3 X Z Z Z H 9 V H 4 X X 5 X 2019/2/25 3rd ILCDR07 Q 5 F X

Spectrometer Stage SBD Set of 11 Mesh Filter Synchrotron radiation Set of 11 Mesh Filter Freq. range 90 to 140GHz with 5GHz step on center frequencies Specifications: 3dB attenuation at  5% From center frequency Center frequency transmission 100% Dimensions: 30mm X 30mm Stage SBD To the Amp 2019/2/25 3rd ILCDR07

Results measured at ATF DR so far 2019/2/25 3rd ILCDR07

Bunch length 5mm to ~10mm R~ 1kW L~20nH to 50nH By 1998 to 2001 measurements 2019/2/25 3rd ILCDR07

Requests for instability study from 2008 to 2009 Preparation for single bunch instability is ready. We need several shifts of machine time in 2008 and 2009. Welcome the evaluation of existing impedance before fast kicker system installation. (need a good coordination.) Most important issue is very good beam tuning for stable operation on coupling-resonance and off-resonance (flat-beam). 2019/2/25 3rd ILCDR07