3.1 PARTICIPATORY DESIGN.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Participatory Research Aden Aw-Hassan Aleppo, April 28, 2005.
Farmer Water User Community (FWUC)
6.3 Sediment management options
6.6 Canals and Command Area Structures. (1) Canals in Spate Schemes  traditional systems are diverted to short, steep canals in the upstream areas (with.
1.3Economic Costs and Benefits. Spate irrigated areas are often among the poorest areas in a country and therefore require special attention.
CASE STUDY OF WADI LABA AND WADI MAI ULE (ELWDP – ERITREA) Lesson 5
Module 1 : Understanding the Wadis John Ratsey
6.4 Improving Diversion Works
(Görans Manure management presentation here). BAAP THE BALTIC SEA AGRICULTURAL RUN-OFF ACTION PROGRAMME.
3.6 Case Study Irrigation Improvement Project: Developing Water Users Organizations.
الجمهورية اليمنية وزارة الزراعة والري الهيئة العامة لتطوير تهامة الحديدة REPUBLIC OF YEMEN MINISTRY OF AGRICULTURE AND IRRIGATION TIHAMA DEVELOPMENTAUTHORITY.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
DEVELOPMENT OF FARMER ORGANIZATIONS 3.3. WHY? Management is key to balanced water distribution, adequate maintenance and hence to high productivity Strong.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
CASE STUDY: SHEEB FARMERS ASSOCIATION, ERITREA 2.3.
3.3 Community Contracts. Rational Community Contracts To ensure that:  Irrigation rehabilitation and improvement works comply with the needs of the farmer.
Sediment Transport in Wadi Systems Part 1: Overview
Sediment transport in wadi systems Part 3 - Sediment management structures and canal design
Module 2 (part 1) Improving Diversion Works John Ratsey
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Q & A WITH INSTRUCTORS. PITIP Summary the Key Messages.
SOIL MANAGEMENT AND MOISTURE CONSERVATION
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Project Management Learning Program July 2008, Mekong Institute, Khon Kaen, Thailand Project Design and Planning Sequence of Systematic Project Design.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
6.7 Improved Traditional Systems
Water resources engineering Giannis Kleopa. What is a water resources engineering? Water resources engineering is the profession that is responsible for.
2.2 Spate water rights and distribution rules. This is Anambar Weir, Balochistan (Pakistan) What happened here?
3.1 Participatory Design. WHY PARTICIPATORY DESIGN?  To understand and agree priorities and make the best design for the system accordingly  To tap.
6.11 Case: Wadi Labka – What to Do When Traditional System Becomes Unsustainable.
Project Work Plan - Manchester JSNA National Dataset Project Workshop 3 London, 28 th May 2009 Neil Bendel Manchester Joint Health Unit.
1 Hydraulic and Hydrologic Considerations in Planning.
4.3 Groundwater management in Spate Irrigation Systems.
SPATE IRRIGATION GLOBAL TRENDS 1.1. Spate irrigation – globally In addition there is small spate irrigation in Ethiopia, Kenya and West Africa Spate irrigation.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
THE UNITED REPIBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION NATIONAL IRRIGATION COMMISSION GENDER MAINSTREAMING IN IRRIGATION INTERVENTIONS Presented.
Auditing the Implementation of Multilateral Environmental Agreements (MEAs) (4) Narges Rezapour Tehran- May 2016.
Needs based assessment: participation of pupils and parents
1.2 Typology of spate irrigation systems
The need to combine road and water management in Tajikistan Aksakolov Ukumatasho Mirzoshoevich Frank van Steenbergen.
Field Visit of overall campaign in Tigray Region Ethiopia-Birds
PROJ 595 RANK Lessons in Excellence-- proj595rank.com.
PROJ 595 RANK Education for Service-- proj595rank.com.
Performance Achievement a quick reference guide to
The Gender Perspective
New Work Programme and mandates 2005/2006
CASE STUDY: SHEEB FARMERS ASSOCIATION دراسة حالة: جمعية مزارعي شيب
6.2 Sedimentation Issues: Overview
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Nick Bonvoisin Secretary to the Convention on the
The Geography of the Fertile Crescent
Water Harvesting.
Chapter 16 Planning and Management of Health Promotion
ECONOMIC COST AND BENEFITS
Part 4 - Sediment management options + exercise
6.8 Case - ‘River Engineering Approach’ Wadi Labka – Gabion/ Soil Diversion Spurs.
2.2 Spate water rights and distribution rules
Project Design and Planning
GROUNDWATER MANAGEMENT IN SPATE IRRIGATION SYSTEMS
November 20, 2018 Open up canvas
IMPROVED TRADITIONAL SYSTEMS
3.5 Community Contracts.
SUSTAINABLE MICRO-FINANCE for WOMEN’S EMPOWERMENT
Urban Waste Water Reporting: a common approach!
SPATE WATER RIGHTS AND DISTRIBUTION RULES
Field water distribution
Irrigation Improvement Project: Developing Water Users Organizations
FIELD WATER DISTRIBUTION
Roles and Responsibilities of the tutor
Presentation transcript:

3.1 PARTICIPATORY DESIGN

WHY PARTICIPATORY DESIGN? To understand and agree priorities and make the best design for the system accordingly To tap into long-time farmers knowledge on floods, slope of the land, sedimentation, etc.. Because it is (and will remain) the farmers system after all

Participatory Design: Two Stages Agree on the priorities – what are the main issues and priorities in the area, how should the system be improved Agree on the specific designs – what structures, where and what design

Set up farmers representative group, like a Farmers Design Committee STEPS Discuss specific issues and problems and set and rank priorities AGREE ON PRIORITIES Walk through survey Evalution of priorities and common agreement on design concept Design meeting – agree on scope of works Agree on cost sharing Detailed designs AGREE ON DESIGN Work agreement and initiation of the physical works

STEP 1 SET UP A REPRESENTATIVE GROUP

Participatory design is the negotiation with a representative and mandated group, such as a Farmers Design Committee Discussion on the design should not be a loose discussion with ‘the farmers’

Local Steering Committee, Sheeb (Eritrea): All project decisions – including design and timing – discussed and agreed between project staff and traditionally elected farmer leaders Project Director Traditional Farmer Leaders Project Staff

STEP 2 SYSTEMATICALLY DISCUSS PROBLEMS AND PRIORITIES

It is important to understand and come to terms with farmers priorities: Farmers may have a different risk assessment than engineers: If the river changes course they may be able to ‘catch’ it They may be keen to capture all flood water and be willing to except some erosion In many cases scour sluices are closed so as not to loose any water even if it causes sedimentation of canal bed or river

It is important to understand and come to terms with farmers priorities: Farmers may have a different appreciation of the value of sediment then engineers for instance They may want to exclude only the very coarse sediment or sediment from certain parts of the catchment, but otherwise appreciate its fertilizing value Childrens drawing showing great concern that sedimentation pond in modernized system in Wadi Laba is intercepting all nutrients

STEP 3 JOINT WALK THROUGH SURVEYS TO ASSESS FIELD SITUATION

JOINT WALK THROUGH SURVEYS Systematically walk the entire system JOINT WALK THROUGH SURVEYS

JOINT WALK THROUGH SURVEYS Discussion and explanation Pinpoint what needs to be done Engineer taking notes JOINT WALK THROUGH SURVEYS

STEP 4 COMMON AGREEMENT ON PRIORITIES AND SCOPE OF WORK

USE PAPER, DRAWINGS, MODELS INVOLVE FARMERS DESIGN GROUP OR ANY AUTHORIZED GROUP

STEP 5 DESIGN MEETINGS

Understanding and consensus required of the larger group

Agreement should come after - not before discussion

Proposed design: Gated Flood Channel Intake Example

Final construction: Ungated Intake No gate provided Because farmers do not want the Irrigation Agency (TDA) to control their intake

STEP 6 AGREEMENT ON COST SHARING

WHY COST SHARING? PARTNERSHIP PRINCIPLE TO AVOID ‘WISH LISTS’ AND INSTEAD HAVE REALISTIC SCOPE OF WORKS REQUIRES FARMERS TO BE INTERNALLY ORGANIZED

DIFFERENT TYPES OF COST SHARING IN CASH MONEY BY PROVIDING LAND BY PROVIDING LABOUR BY DOING PART OF THE WORK

Agreement on cost sharing

Agreement on cost sharing

STEP 7 AND 8 AGREEMENT ON DESIGN AND IMPLEMENTATION

MAKE SURE FARMERS CONTRIBUTION ORGANIZED THROUGH FARMERS GIVE FARMERS COMMITTEE ROLE IN ASSESSING EVEN SUPERVISING OVERALL WORKS

FINAL POINT…

ALTERNATIVE TO PARTICIPATORY DESIGN IS FARMERS MAKING THEIR OWN DECISIONS AND DESIGNS FARMERS ARE QUITE CAPABLE OF SUBSTANTIAL CIVIL WORKS THIS DROP STRUCTURE IN WADI ZABID FOR EXAMPLE HAS BEEN CONSTRUCTED BY FARMERS THEMSELVES