CMBG Performance Indicator Workshop

Slides:



Advertisements
Similar presentations
Human Performance: Observation Principles of Excellence
Advertisements

Experiences in sharing information What can be done? Key findings from the IATI pilots.
2007 CMBG Conference Keith Reinsmith PPL Susquehanna, LLC June 17-20, 2007 Charleston, SC Engineering Change Impact Evaluation Process.
Future directions for CHAs Benchmarking Member Service.
Intensified action on seven behaviours by all development partners Session objectives 1.To review status of intensified action: progress, issues and challenges.
Australian Oil and Gas Safety Background  Significant improvement in last decade  Continued serious incidents and losses of containment  We have rapid.
Driving Configuration Management on the Road to Excellence Welcome.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Deployment of a Margin Model at Comanche Peak Presented.
Monash University Library Quality Cycle EXCELLENCE AND DIVERSITY and LEADING THE WAY Monash University’s strategic framework and overall directions MONASH.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Welcome to Charlotte 17th Annual Configuration Management Benchmarking Group Conference CMBG XVII Charlotte, NC June 20-23, 2010.
1 CMBG 2009 Knowledge Management at PPL Monday June 29, 2009 Keith Reinsmith PPL Susquehanna.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
ANSI/NIRMA Standard CM 1.0 Status Update
Sunderland City Council : Support and Aspiration Children and Families Bill Implementing the Reforms for Special Educational Needs and Disability.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG CMBG History Presented By: Mike Stout CMBG Steering.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Creating A Single Equipment Database Presented By Keith.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
2006 CMBG Conference Workshop 2: Facilitator: Keith Reinsmith PPL Susquehanna June 11-14, 2006 Richmond, VA.
2006 CMBG Conference CMBG History Presented By: Rick Harris CMBG Steering Committee.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
1 Configuration Management Performance Indicators Presented By: Lloyd Hancock LRH Consulting Services.
2010 CMBG Conference Temporary Design Changes Tony Hathcock Duke Energy - Oconee June , 2010 Charlotte, NC.
5 April, 2013 Indicator 4 on Transparency Consultation IATI Steering Committee, 3 Dec 2015 Alejandro Guerrero UNDP-OECD Joint Support Team (Global Partnership.
2006 CMBG Conference BREAKOUT 2: Electronic Approval & Authorization Including E-Signatures John Parler South Carolina Electric & Gas & Diane Derr PPL.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Standard Design Process Overview
Industry Standard CM Indicators Mike Hayes Exelon Nuclear CM SME CMBG Steering Committee.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Design Oversight Working Group (DOWG) – Next Steps
Sub-heading Font: Trebuchet MS Regular Size: 24pts
What Works Conference 2017 Jackie Cooper – Project Manager
PPS Leave Audit Update Human Resources February 27, 2017
Excellence Leader (CEO/Owner/General Manager) Role Description…
Exploring Supplier Development
Ryan Cantor, MSPH Director of Statistical Reporting, Intermacs
Overview of recommended indicators for routine monitoring of iCCM
Multi-state Corridor Pooled Fund Program
Process Models at Statistics New Zealand METIS Workshop on the Statistical Business Process and Case Studies 11th March 2009 Craig Mitchell Standards,
Metric: Supplier Attendance by Meeting Location
Primary health care performance measurement initiatives across three Canadian provinces Martin-Misener, R., Johnston, S., Burge, F., Blackman, S., Scott,
Developing and Issuing the RFP
Presented By: Mike Stout – PPL Glenn Neises - INPO
CMBG Performance Indicator Working Group
Promoting CM Breakout Session
Configuration Control and the Standard Nuclear Performance Model
Fast Track Modifications Keith Reinsmith PPL Susquehanna
Electronic CM Processes
Reducing Managed Facility Configuration Information
Break Out 6: CM Organizational Structure
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF-NM Project (Process Re-engineering & Optimization of Operations & Maintenance Functions.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
CMBG Steering Committee
Drivers of change + + = Benetas strategy Growth in all sectors Consumer Directed Care New residential model of care Aged Care workforce challenges.
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Key Value Indicators (KVIs)
BREAKOUT 8: CM and The Next Generation of Plants
Vendor Technical Information
Configuration Management Operating Experience
BREAKOUT 3: CM Health Reporting
DG Environment, Unit D.2 Marine Environment and Water Industry
Break Out 5: AP-929 Revision
Overview Headlines SIP Summary of progress High level plan
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Region 9 Regional Tourism Organization, The Great Waterway(RTO9)
WORK STREAM TEAM DELIVERABLES
Presentation transcript:

CMBG Performance Indicator Workshop Facilitated By: Keith Harvey- Wolf Creek Keith Reinsmith- Susquehanna

CM P.I.’s CM P.I. Background and History P.I. Development requested by CMBG attendees Steering committee commissioned a team to develop Developed P.I.s around CM Equilibrium diagram Defined P.I.s to measure effectiveness, timeliness, and cost of each CM sub-process (CM001- CM004) Also created P.I.’s for overall program effectiveness

Facilities Using CM P.I.s (6 Generator and 2 DOE) Cooper “Program Health” P.I. Other P.I.s focused on FCI Wolf Creek P.I.s in development Don’t have proper capability to bin yet Modeling P.I.s after Duke Fermi Use CR process for problem I.D. Low tolerance level for identification Use cause codes for trending Don’t have overall CM P.I.

Facilities Using CM P.I.s (6 Generator and 2 DOE) Susquehanna P.I.s developed for some of NEI CM P.I.s Several focused on mod process effectiveness Have overall CM Process effectiveness P.I. (Roll up of seven CM indicators) Columbia KPIs based on INPO 03-004 5 CM P.I.s based on INPO OEOs. These align with CM P.I.s Use CRs with cause codes

Facilities Using CM P.I.s (6 Generator and 2 DOE) Bruce Have CM P.I.s as part of site wide P.I. System Track obvious backlogs Yucca Mtn Fully functional P.I. System Focused now on requirements mgt not CM Use CRs to identify Los Alamos Getting 17-18 facilities to implement CM program Have same P.I.s across all fac. Some are CM.

Performance Comparison Important to enable industry benchmarking of performance (apples to apples) Agreement to identify a subset of CM P.I.’s to focus on and share across industry Use as pilot for broader application over time Would normalize to account for program and facility differences (e.g.; use % vs. actual numbers) Would require plant profiles to aid in comparison Would focus on trends

Performance Comparison Identified a list of 5-6 common “easy” P.I.s 5 volunteers agreed to work as a team to develop detailed description of each P.I. Team will share results with others from workshop Each plant would capture data periodically (monthly, quarterly?) and send to common place for publication Discussed putting on CMBG website Would revisit effectiveness at ’05 conference