Relationship between World Bank and Romanian EA requirements

Slides:



Advertisements
Similar presentations
Recommendations of the Initial Environmental Assessment (IEE) According to the SIEE, the project is identified as a category of B under the ADB environmental.
Advertisements

SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.
EMS Checklist (ISO model)
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Training Workshop for Financial Intermediaries and Implementing Agencies May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World Bank.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
ENVIRONMENTAL MANAGEMENT PLAN
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
OP/BP 4.01 Environmental Assessment Zagreb, May Presenter: Natasa Vetma Presentation prepared by Ruxandra Floroiu.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Major project development in the Framework of CF and ERDF funds JASPERS - a technical support facility Presented at an InterAct Danube Region Strategy.
Integrating Environmental Management Plans into Project Operational Manuals Agi Kiss Safeguards Training Workshop, Chisinau, Oct 28-31, 2008.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Presentation For the Moldova Safeguards Training Workshop October 28-31, 2008 By Victor B. Loksha Consultant Europe and Central Asia Region The World Bank.
Project Appraisal: Overview March 28, Country Level Rapid Assessments: Key Areas A. Status of Plans and Activities Current status of AI in the country.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
1 Permitting of industrial facilities in Croatia.
Agi Kiss Zagreb, May 7, Operational Policy/Bank Procedure 4.00 Piloting the Use of Borrower Systems to Address Environmental and Social Safeguard.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Environmental Management System Definitions
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
1 ASPECTS REGARDING PLANNING AND REPORTING RELATED TO RECOMMENDATION 331/2001/EC ON MINIMUM CRITERIA FOR ENVIRONMENTAL INSPECTION AND ITS IMPLEMENTATION.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
Mini-Case / Quiz Topic: EA Categorization and EMP Requirements By Victor B. Loksha ECA Safeguards Team Europe and Central Asia Region The World Bank Discussion.
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
Financial Intermediary Lending World Bank Safeguards Workshop May 2013.
World Bank Safeguards Training Workshop Information & Resources Chisinau, October 28-31, 2008 Ruxandra Floroiu.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
INTERNATIONAL EXPERIENCE AND TRENDS IN EIA FOR DEVELOPMENT PROJECTS Clive George EIA Centre and Institute for Development Policy and Management University.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
SEA in the Czech Republic Prague, 24 September 2008.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
National Environmental Assessment Requirements and Relation to World Bank Policies Relevance to Central Asia Gulana Hajiyeva WB Safeguards Training Workshop.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
ISO Session 3 Environmental Management and Ethics in Management.
Environmental Safeguards
Municipal Class Environmental Assessment
I II Review areas Review criteria Weighted Rating Description of
EIA approval process, Management plan and Monitoring
Infrastructure planning and management
Debbie Kopsick EVPP 991 February 22, 2007
DNV experiences and viewpoints
Marc Thauront Brussels 30 June 2008.
Involuntary Resettlement 0P 4.12: Planning Instruments
Importance of Law and Policies in the Environmental Management System
BERCEN 2nd Exchange program – 8-12 April 2003, Bulgaria
World Bank project example
SCREENING SCOPING SEA QUALITY CONTROL DECISION
Environmental Impact Assessment EIA
Presentation transcript:

Relationship between World Bank and Romanian EA requirements Regional Safeguards Training Chisinau, Moldova October 28-31, 2008 Ruxandra Floroiu, Environmental Engineer, ECSSD

Romanian Environmental Legislation Revised in accordance with the EU legal system Provides laws on air, water and soil and related to these parts of environment (dangerous substances; flood management; forestry and biodiversity protection); The Environmental Protection Law and the Water Law govern the environmental legislation Ministry of Environment and Sustainable Development (MESD)– legal responsibility

Romanian Institutional Responsibility for Environmental Legislation Enforcement MESD Departments and Directions; National, Regional and Local EPA; National Environmental Guard (NGA); Other national agencies (e.g., “Romanian Waters”)

EA process in Romania Specific licensing and permitting procedures Environmental License to Construct (Environmental Agreement) Procedure includes several steps: Initial Project Screening EIA Report Preparation EIA Report Review (public consultation) Decision and Approval of the License Environmental Permit to Operate/ Environmental Audit

EA process in Romania (cont’d) Monitoring Aspects Compliance with meeting standards and permit requirements local EPA, National Environmental Guard, technical departments Non compliance done through warnings, administrative fees and possibly court action

Romanian EIA System versus Bank’s policy on EA – Equivalency aspects - Screening process is comprehensive and provides adequate procedural details (e.g., checklists) - Projects and activities are classified into categories RO: 3 project categories – (i) require full EIA; (ii) “unique agreement” and summary description of impact mitigation measures and control; and (iii) do not require an EIA WB: 3 project categories – “A”, “B” and “C” (also FI) - Environmental authorities review all category (i) and (ii) for potential impacts and determine the scope of EIA

Romanian EIA System versus Bank’s policy on EA – Equivalency aspects cont’d - Assessment of potential impacts related to proposed project; - Assessment of applicable legal and institutional framework; - Assessment of feasible investment, technical and sitting alternatives, including the “no action” , potential impacts, their mitigation costs, training and monitoring requirements

Romanian EIA System versus Bank’s policy on EA – Equivalency aspects cont’d Romanian standards on emissions, waste management, water wastewater discharge and air pollution are compatible with measures set forth in the Bank’s Pollution Prevention and Abatement Handbook (PPAH); Romanian system emphasize both positive and negative impacts with major focus on mitigation measures for addressing possible negative impacts BUT no specific requirements are given for EMP

Romanian EIA System versus Bank’s policy on EA – Equivalency aspects cont’d Public involvement is foreseen at screening, EIA review, and decision stage of the project BUT there is no provision for continuing consultation throughout high risks project implementation Certified expertise is required for EIA study preparation and review BUT no specific recommendation to use independent advisory panels during high risk project implementation

Romanian EIA System versus Bank’s policy on EA – Equivalency aspects cont’d Measures are provided to link the EA process and findings with economical, financial, social and technical analyses of the proposed project Disclosure of EIA documents and required consultation

Romanian EIA System versus Bank’s policy on EA – Acceptability aspects Acceptability - confirms the implementation practices, track record and institutional capacity in addressing environmental and social issues No gaps in system design and general implementation; Need to finalize staff increase More experience on new monitoring, inspection and compliance programs Limited track record of improved performance under a strengthening structure

Romanian EIA System versus Bank’s policy on EA – Acceptability aspects cont’d Proposed gaps measures: Prior review by the Bank of first EIA report and permits/license required by Romanian law; Review of relevant annexes of bid documents describing environmental mitigation and monitoring procedures to be carried out by works contractors