SPOKE Cavities frequency preparation plan and RF control procedures

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ESS cavities interfaces
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
ESS LLRF and Beam Interaction
Areal RF Station A. Vardanyan
Cryomodule test stand at ESS site
WP5 Elliptical cavities
WBS 1.03 Readout Systems Scope, Cost and Schedule
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
CMMI Q & A.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Test plan of ESS HB elliptical cavity
XFEL Vacuum System Commissioning
Test stand preparation and EMR "live" data summaries
Test plan of ESS HB elliptical cavity
High Gradient Cavities: Cost and Operational Considerations
ESS – RF checks up to cavity operation readiness in tunnel
Cryogenic C&C Scope of work
XFEL cavities and cryomodules measurements at AMTF
CLINICAL INFORMATION SYSTEM
CEPC RF Power Sources System
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Test plan of ESS HB elliptical cavity
C75 Commissioning Michael Drury SRF Operations Support
Status of HOMS Spectra Measurements in 1.3 GHz Cavities for LCLS-II
SRF Frequency data flow (focus on elliptical)
First High Power Test of the ESS Double Spoke Cavity package
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Installation Binder / IRR – an example
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
PSS verification and validation
PSS Verification and validation
How Do We Define Acceptance of a Cryomodule? - A Discussion
High Level Readiness Reviews
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Status of the ESS High Power RF Systems
Status & Schedule for ESS TS2
Charge and Agenda of the 18th TAC meeting
ThomX – Commissioning Meeting – 25/01/2018
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Summary of the maximum SCRF voltage in XFEL
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
High level ESS SRF test plan
CryoModule Calibration & Measurements Configuration Management Tools (CMCMCMT) aka CM3T because no one came up with a better name Nuno Elias, Paolo.
Presentation transcript:

SPOKE Cavities frequency preparation plan and RF control procedures Cecilia G. Maiano www.europeanspallationsource.se

Technical Commissioning of Systems After the handover from In-Kind Contributors and the testing at TS and tunnel installation the technical commissioning phase will start at ESS Planning has started at ESS, in order to define a proper structure in the Linac group/SRF section and set necessary procedures for this activities This presentation collects material for discussion, in order to properly match IK requirements and FREIA testing procedures to the information that will be needed during the technical commissioning activities 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Spoke Test/ Turn on Procedure Discussion - C.Maiano Operation readiness Before switching RF on, the ESS technical commissioning team will have to verify the ”operational readiness” of the modules, which is largely based on data collected by IK and TS activities E.g. are the cavities in the expected state? Are all subsystems functional? Are all connections properly routed? Are all interlock thresholds set to safe values? Operation Modes defined by ESS-34178 The technical commissioning team will need to handle the relevant interfaces with MPS and local technical interlock systems 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Reference data from IK and testing First discussions during the RF Cell Review (May 2017) and with MPS and interlock experts pointed out the need to have, during the technical commissioning, a fast access to the handover state of all systems Performance data of all tested cavities (in VT and at TS) E.g. Q vs Eacc curves, limitation mechanisms during tests, reference frequencies in various conditions (warm, cold before tuner action), probe calibration coefficients, nominal transmissions, cable calibrations, etc. Full understanding of the operation of all subsystems E.g. expected steps to tune, nominal tuner response per step, warm and cold coupler conditioning procedures and experience, etc. 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

1. Need for a local database At ESS we are settin up a system to handle the management of these data, in order to Verify operational readiness E.g. nothing unexpected has changed during storage and installation Make properly informed decisions by the SRF section of all operational limitations and correspondingly set the interlock protection levels E.g. Max field of a cavity before quench limitation or avoiding eccessive field emission regions, coupler conditioning signals, etc. 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Proposed path for the data All IK partners store production and test data during their activities, e.g. BW frequencies at warm/cold, transmissions, field flatness Antenna Qext and calibrations, cable calibration Power rise curves Position of harmful HOM modes We have to agree on a mechanism to transfer the data for consolidation at ESS, in a storage area accessible by the ICS, the commissioning/operation group and IKC. consolidation is ESS responsibility, IK partner submit data in any suitable “standardized” form that can be used to feed it 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Data documentation/transfer Example of an elliptical cavity (using our XFEL 3.9 GHz data) Passband measurement are retrieved from cavity producer and during the module assembly stage (any form used at IKC) Normalization to ESS ICS standard (HDF5, Nexus extension) => ESS Task Analysis logic built on the collected data (e.g. visualize, compare, etc.) => ESS Task We can implement it also for spokes 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

2. Need for a “user manual” Design criteria and test experience during the R&D and prototyping phase is documented by a large amount of reports, scientific and conference publications, by the IK contributors It is often a ”work in progress” snapshot, on the path to the technical maturity of the series components, one should be careful to extract values The ESS team/ SRF section needs to ”take ownership” of all design aspects and the valid design parameters Compile a summary report in consultation of IK partners and reach consensus for its finalization For “RF experts”, physics-oriented. Not just list of numbers, but design motivation 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Agreed path for the design information I am compiling a “summary” of all the current information concerning the cavity design (spokes and elliptical) and nominal system and subsystem parameters, starting from published material from the IK and involving the IK for the completion, its review and its finalization Focus is on the understanding of all design background in order to fulfill the goals of the technical commissioning phase at ESS Develop procedures at ESS for verification and measurement activities 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Example from the SPK document (+…) 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Spoke Test/ Turn on Procedure Discussion - C.Maiano SPK document (2) 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Spoke Test/ Turn on Procedure Discussion - C.Maiano SPK document (3) 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Example: Frequency preparation What are the expected cavity frequencies during all stages? Uncertainties? At least for the technical commissioning we will foresee measurements before proceeding to the further OM Goal frequency at 2 K (before CTS)? 352.132 +- 0.042 Assuming cavity sens tolerance 121-176 kHz/mm 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Typical questions (SPK example) Hard limit of tuner range to be enforced? N. Gandolfo email < 1.18 mm (~170 kHz) to limit stress < 400 Mpa Then goal frequency at cold need to be higher (including its estimated spread, which should then be quantified) Minimum value for the CTS action e.g. for piezo preload: 1.43-2.59 kN 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Spoke Test/ Turn on Procedure Discussion - C.Maiano MBL/HBL Example Requirements exists but are not readily usable for checks in OM1 (Ready for cooldown) or OM5 (Stand-By at 2 K). Commissioning team needs full strategy 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano

Spoke Test/ Turn on Procedure Discussion - C.Maiano Summary Requirements and Interface specifications are extremely important for the success of the project, but are not sufficient Technical commissioning of all systems will require the full understanding by the ESS team/SRF section of all design details These are not necessarily captured by requirement / interface specifications “Knowledge transfer” from the IKC to the project team! “Data transfer” to enable assessments and decisions by the project team from the IKC experience 2019-02-22 Spoke Test/ Turn on Procedure Discussion - C.Maiano