QXF schedule and milestones

Slides:



Advertisements
Similar presentations
QXF Cable, 1 st generation Giorgio Ambrosio, Paolo Ferracin Fermilab CERN QXF Video-meeting June 18, 2013 The HiLumi LHC Design Study is included in the.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
MQXF considerations MDT section 11/04/2012. Summary Revised planning Development Personnel Production: strategy and personnel Cost Planning issues not.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Heaters for the QXF magnets: designs and testing and QC M. Marchevsky (LBNL)
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
MQXF Design and Conductor Requirements
11 T Dipole Integration & Plans M. Karppinen
CSP 25th November 2010 Technical agreement number 3: overview
Task T HTS Dipole Magnet Design and Construction
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Nb3Sn IR Quadrupole Program
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Status report on MQYY (Q4)
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
P. Ferracin and G. Ambrosio
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
Presentation transcript:

QXF schedule and milestones P. Ferracin July 2nd, 2014

SQXF 3D CAD model P. Ferracin 02/07/2014

Critical milestones Schedule presented at Daresbury Short model program: 5 CERN-LARP models, 2014-2016 Start winding in 02-03/2014 Support structure available and qualified by early 2015 First magnet test in 05/2015 (3 LARP coils, 1 CERN coil) Long model program: 2 (CERN) + 3 (LARP) models, 2015-2017 Start winding: LARP in 01/2015, CERN in 09/2015 Paolo Ferracin 08/05/2014

SQXF plan and schedule (Slide presented at Daresbury) Definition of cable geometry in 06/2013 Update of coil design in 07/2013 Coil parts fabrication/optimization in progress Decision on end parts for first set of coils: 12/2013 End spacer turn-around: ~2 months Coil tooling Procurement Parallel coil fabrication LARP-CERN CERN: 1 Wind&Curing + 2 React&impreg LARP: 1 Wind&Curing + 2 React&impreg Winding and curing tooling by 11/2013 Reaction and impregnation tooling by 02/2014 Fabrication of full practice coil starts, both at CERN and in the US, in 02/2014 Fabrication of second set of coils starts in 03/15 (LARP), 05/15 (CERN) Possibility of fine tuning cable geometry by 06/2014 G. Ambrosio and P. Ferracin 13/11/2013

SQXF Status and milestone From conceptual to engineering design: 03/13 Coil winding started in 03/14 Cu coil at CERN Nb3Sn coil by LARP P. Ferracin 02/07/2014

SQXF plan and schedule (Slide presented at Daresbury) First “real” or “mirror” coil (#3) to completed by CERN in 12/14 (#1 or #2) to be completed by LARP by 9/14 G. Ambrosio and P. Ferracin 13/11/2013

SQXF plan and schedule (Slide presented at Daresbury) Support structure fabricated and qualified by 02/15 First magnet assembly in 03/15 1 coil from CERN First test by 06/15 P. Ferracin 02/07/2014

SQXF plan and schedule (Slide presented at Daresbury) Start winding LARP in 01/2015 CERN in 09/2015 First “real” or “mirror” coil LARP in 10/2015 CERN in 08/2016 First long prototype test LARP in 11/2016 CERN in 11/2017 P. Ferracin 02/07/2014

Long model program Plan and schedule G. Ambrosio and P. Ferracin 13/11/2013