FIRESIDE CHAT February 27, 2012. Pews Ratigan-SchottlerPioneer Refinishing Delivered/Installed Solid Oak PewsStrip/refinish$42,200 597 – 42 pewsReplace.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

2 Casa 15m Perspectiva Lateral Izquierda.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Kick Off WB assignment Measurement and Dimensions.
Who Wants to be a Millionaire? Adapted from TCEA 2002
AP STUDY SESSION 2.
1
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Jesus, The Way I am the way, the truth, and the life John 14:6.
STATEMENT OF CASH FLOWS
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
David Burdett May 11, 2004 Package Binding for WS CDL.
CALENDAR.
Welcome to Who Wants to be a Millionaire
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Summative Math Test Algebra (28%) Geometry (29%)
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Calculation Addition.
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
5/18/2014Righter Group, Inc.1 Tnemec Stranlock Revêtements Renforcies Présente.
Decision Making and Relevant Information
INVENTORY AND OVERHEAD
Inspections on an iPad, iPhone, iPod Touch, Android Tablet or Android Phone.
7 | Means of Egress (Life Safety Code)
Building and Grounds Committee Mike Clarey, chairman Ken Plueger Tom Reuter Tim Pick Bill Anthony Fr. Matt Hewitt.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
Analyzing Transactions
CILA Junior Conference 2012 Buildings Damage Luke Exford.
SCHH Computer Club Treasurers Report February 8, 2007.
PP Test Review Sections 6-1 to 6-6
MCQ Chapter 07.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
Sprayer Economics Gary Schnitkey University of Illinois.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Dassel-Cokato Schools 2013 School Support Levy November 5, 2013.
4. Inequalities. 4.1 Solving Linear Inequalities Problem Basic fee: $20 Basic fee: $20 Per minute: 5¢ Per minute: 5¢ Budget: $40 Budget: $40 How many.
The Church is… 1. God’s people 2 Our Facility is… 3.
Before Between After.
Equal or Not. Equal or Not
Five-Minute Check (over Lesson 5–9) Main Idea and Vocabulary
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
& dding ubtracting ractions.
Weekly Attendance by Class w/e 6 th September 2013.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

FIRESIDE CHAT February 27, 2012

Pews Ratigan-SchottlerPioneer Refinishing Delivered/Installed Solid Oak PewsStrip/refinish$42, – 42 pewsReplace kneelers$13,000 Total$57,392$55,200 deduct (assist)($1,319) Tax(6%)$ 3,364.38$ Pew sponsorship – $1,500 per pew (38)

Gunder Church Furniture $53, Includes delivery, installation, & taxes Requires two people to assist installers

CARPET Hanson FurnitureZems Furniture Carpet/glue$14,066.76$10, (with $950 rebate) Installation/demolish$ 4,870.00$ 3, Plus tax$ 1,193.21$ The sanctuary needs new underlaymentDoes not include to glue carpet direct, the altar may needremoval. it also. The two long steps need repair.

Conrad-Schmitt $150,000 - $206,000 (Mural in the of sanctuary and front wall, if done separately, will cost $94,380.) Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, and narthax, not stairways or vestibules. 23kt gold leaf to be applied in different locations within the church. With mural of God the Father receiving His Son, the bid would be $178,380, which includes the fiberglass covering of the large cracks. Without the mural, deduct $10,000. Additional $28,310 to fiberglass all large flat wall and ceiling surfaces with an 18 mil thick polymer coat. All large cracks will be routed out, caulked and covered with fiberglass mesh. Large living cracks may reappear, but this is the best procedure to prevent any recurrence.

RIEHLE $120,000 - $175,000 + taxes (Art work of sanctuary and front wall, if done separately, will cost $80,000.) Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, narthax, and stairway. Install polymer system to all walls and ceilings. Furnish steel scaffold. Owner to unload and load scaffold. Custom made reredos