HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.

Slides:



Advertisements
Similar presentations
The Role of Clays in Shielding DNA against X-Ray Radiation: Possible Implications on the origin of life Angela Ciaravella F. Scappini (2), M. Franchi (3),
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
International Telecommunication Union September 2010 WRC-12 PREPARATIONS MID Regional Planning Seminar 19/20 September 2010 W. Frank Radiocommunication.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Notes on EE activation, shielding and removal Dave Cockerill
ZMQS ZMQS
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
EDMS R ADIATION P ROTECTION TAS/TAN D OSE R ATE M EASUREMENT HL-LHC WP8 B I -W EEKLY M EETING, M AY 19 TH 2014 Cristina Adorisio (CERN - DGS/RP)
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
15. Oktober Oktober Oktober 2012.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
Number bonds to 10,
1 Unit 1 Kinematics Chapter 1 Day
Simulations des niveaux de radiations en arrêt machine M. Brugger, D. Forkel-Wirth, S. Roesler (SC/RP)
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
S. Evrard — EN/MEF IEFC Workshop, March 08, 2012 TCC2/TDC2 Shutdown Activities and Consolidation Plans On behalf of the TDC2/TCC2.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
HiRadMat : report from WG2 – WANF dismantling WG3 - Irradiation Area October S. Evrard 1 WG2&3 meeting organization Preliminary WBS for related.
Lessons learnt from WANF (*) dismantling Outline  Introduction  WANF/HiRadMat location  WANF operation  WANF dismantling  Preparation  Dismantling.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Transport & Handling of Detectors TAN Workshop S. Prodon –
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
HIGH RADIATION TO MATERIALS Ans Pardons for the HiRadMat project team IEFC Workshop, March 22, 2011 Outline  The HiRadMat facility – Why, What, When,
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
WP5: – STATUS REPORT EUCARD Steering Committee Meeting INFN-Frascati, November 4-5, 2009 Outline  HiRadMat – overview/reminder  Project.
TAXS and TAXN ABSORBERS - OVERVIEW
Status of HRMT23 Activities F. Carra, E. Berthomé, G
TDI Coating test at HiRadMat Proposal 1605 HRMT-35 HiRadMat Technical Board Meeting 15th September 2016 EDMS I. Lamas Garcia, M. Butcher,
A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC
Components for the Machine-Interface Regions
TAS at IP1 Present situation and plans
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
EN-STI activities in LHC during EYETS
Radiation-safe area for electronics, or laser or
Radiation Protection Handbook
Presentation transcript:

HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area tables (EDMS , Michael Lazzaroni) Ans Pardons– EN/MEF Weekly WG3 meetings material:

HiRadMat 2 January 2011: TBID dismounted Dose rate inside collimator volume (1mx1mx1.2m) was measured (N. Conan): The 4 copper blocks: Each bloc has hottest surface on the outside Axis of bloc 2&3 is outside range of overhead crane No remote handling foreseen (in 1993) Transformation of T9 Ans Pardons EN/MEF Débit de dose télétector cm à lextérieur des blocs : 20mSv/h 5 cm à lextérieur des blocs : 60mSv/h cm dans les blocs Cu: 430mSv/h Max obtenu (distance non estimée) : 1 Sv/h

HiRadMat 3 Axis of bloc 2&3 is outside range of overhead crane Take 1&2 / 3&4 together Use custom-made lifting beam No remote handling foreseen Use existing threaded holes (4 per block) Handling plates must be installed on copper blocks Hottest surface on the outside Handling plates + extra shielding protect personnel when fixing plates Blocs will be placed inside container in sarcophagus downstream TNC (40cm iron) Transformation of T9: downstream collimator Ans Pardons EN/MEF

HiRadMat 4 Extensive tests on mock-up (S. Evrard) (carried out 02/02/2011, extensive report on EDMS ) Transformation of T9: downstream collimator Ans Pardons EN/MEF

HiRadMat 5 Presentation in ALARA L3 committee of 17/1/2011 Followed-up by review in the following week (M. Tavlet, P. Bonnal) Extensive documentation (procedure, DIMR, risk analysis,...) in EDMS for approval per phase Phases: 0- Preparation area & tests 1-Dismount and transport upsteram collimator & target 2- move two upper copper blocs to downstream TNC 3-move two lower copper blocs to downstream TNC and place all 4 blocks in containers inside sarcophagus : Prepare area for receiving TED, install TED, close shielding Transformation of T9: ALARA approval Ans Pardons EN/MEF

HiRadMat 6 Green light for phase 1 received 1/2/2011 roof block, target and collimator removed on 2/2/2011 Transformation of T9 Ans Pardons EN/MEF

HiRadMat 7 Green light for phase 2 received 3/2/2011? two upper copper blocks planned to be removed 3/2-5/2 (~18h of work) (situation on 5/2: shielding in place downstream from lower copper blocks) Green light for phase 3? two lower copper blocks removal & storage in closed sarcophagus (~20h of work) Then: phase 4 (~8h) – with last transport TNC TT61 Transformation of T9 Ans Pardons EN/MEF