TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint: https://espace.cern.ch/sba- workspace/tcc2wg/LS1%20worksite%20meeting/https://espace.cern.ch/sba-

Slides:



Advertisements
Similar presentations
Chapter 5 One- and Two-Sample Estimation Problems.
Advertisements

1 Grafcet point de vue système. 2 Cliquez pour mise en route 0P 0Z 1V 2V 2V 1 1V 1 1V 2 1Z BPR 0Z 3 0V 1A.
LA FORMATION CONTINUE DES ENSEIGNANTS DE LANGUE 1 LA FORMATION CONTINUE DES ENSEIGNANTS DE LANGUE DAFAP 1.Plan académique de formation 2.Formations à public.
Part 1 3.Yes 5. C 25 H O 2 25CO H 2 O Part C 2 H 2 + 5O 2 4CO 2 + 2H 2 O 9. Complete: 1/10, Incomplete: Black deposit/product.
1 Chapter 58 - Clinical Syndromes of Metabolic Alkalosis Copyright © 2013 Elsevier Inc. All rights reserved.
1 Chapter 43 - The Urine Concentrating Mechanism and Urea Transporters Copyright © 2013 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
ALGEBRAIC EXPRESSIONS
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Tests de montée en charge SharePoint Saturday – MONTRÉAL 2 février 2013.
Groupes de réconfort Calendrier des rencontres Lundi, 18 novembre, 2013 (en français) Monday, November 25, 2013 (in English) Lundi, 2 décembre, 2013 (en.
Unité 3 Leçon oui! Yes! 2. mais oui! Sure! 3. Bien sûr! Of course! 4. Non! No 5. Mais non! Of course not! 6. Peut-être Maybe 7. Pierre est….. Pierre.
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino.
CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Yacine Kadi (EN) Kick-off Meeting, 23 May 2011.
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL CONFERENCE OF DATA PROTECTION AND PRIVACY.
EN/STI investigations during LS1 in TDC2 and TCC2 TDC2: -TCSC (collimator) to be replaced if … TCC2: -Targets Stations T2-T4-T6 *Monitors and Target equipment.
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
1 of Audience Survey Results Larry D. Gustke, Ph.D. – October 5, 2013.
EDMS R ADIATION P ROTECTION TAS/TAN D OSE R ATE M EASUREMENT HL-LHC WP8 B I -W EEKLY M EETING, M AY 19 TH 2014 Cristina Adorisio (CERN - DGS/RP)
WALT: SAY WHAT YOU CAN DO IN TOWN WILF: A PARAGRAPH OF DESCRIPTION USING THE PHRASE ON PEUT FOR LEVEL 3.
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL CONFERENCE OF DATA PROTECTION AND PRIVACY.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Vocabulaire 2.2 Français II. 2 Là, cest.... Here / There is.... Here / There is.... Imagine that youre showing someone around and are pointing as you.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Amener, Emmener, Apporter, Emporter
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
Provider Portal and IC Reports Update for Artemis Users May 20, 2014.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Energy & Green Urbanism Markku Lappalainen Aalto University.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Enrico Chesta Trasferimenti tecnologici dal CERN: come accelerare l'innovazione Enrico Chesta Head of CERN Technology Transfer and Intellectual Property.
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Warm Ups {(2,0) (-1,3) (2,4)} Write as table Write as graph
Week 1.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Wednesday, March 20, 2013MAT 145. Wednesday, March 20, 2013MAT 145.
Magali Pauzié Magali Pauzié
Thomas Otto, Safety Officer, TE Dept. 13th LSC, Thomas Otto, TE Safety Officer2.
NA YETS: schedule week by week S. Evrard.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
1 times table 2 times table 3 times table 4 times table 5 times table
MANUTENTION EN UL55 CREATION D’UN QUAI DE DECHARGEMENT

Exemple de PowerPOint Petit exemple de mise en page et animation etc … 28/03/2012.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland SMS CERN General Infrastructure.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Tables Learning Support

Visit:
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Le module Prévention ALCOOL
Les additions à retenues CE2 : Bilan n°1
Inventory for the non-radioactive waste
Les additions CE1 : Bilan n° 5
Godrej Prakriti Sodepur | Godrej Prakriti Kolkata
Times Tables.
Giftalove Best Cake Offers
Vendredi 6 avril Français PreAP-AP
Figure 9.1.
3 times tables.
6 times tables.
Visit us:
East Hall under construction
Presentation transcript:

TDC2TCC2 Réunion de chantier In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/ workspace/tcc2wg/LS1%20worksite%20meeting/

Statut Retrait MDLV Mise en place protection table plug-in TCSC Manutention et stockage chambre a vide Visite GS-CE à planifier en S51 Bilan des doses

MDLV

Protection TCSC

Liste des Impacts IntituleNumeroDose cumulee (uSv) Retrait TCSC37401 (closed)363 Suite et remontage TCSC Retrait 5 aimants Consolidation vide Survey EN-EL Signalisation TDC2-TCC Total3031