Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

West County Transit Enhancement Plan Tuesday, May 24, 2011 El Cerrito City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Warning!!! Work in Progress. Details may change before final approval WESTERN AUSTRALIA LIVEABLE NEIGHBOURHOODS CODE 2004 Review Towards a mandatory state-wide.
CALENDAR.
6F.01 – Types of Devices Support: FHWA policy that work zone devices meet NCHRP Report 350.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Enhanced Pedestrian Crossing Treatments in Santa Monica ITE 2012 Western District Annual Meeting Session 8C Wednesday June 27, 2012 Sam Morrissey, P.E.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
New Pedestrian Crossing Devices for California Wayne Henley Caltrans Division of Traffic Operations Beth Thomas District 4 Pedestrian Coordinator.
Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows.
Oregon EPHT Dan Rubado, Epidemiologist Environmental Public Health Tracking Program Office of Environmental Public Health Oregon Health Authority.
City of Oakland: Road Diet Experience
Road Diets Jennifer A. Rosales, P.E. Presentation to ACEC/ODOT
October An educational facility will feature: child-sized miniature buildings, streets, crosswalks, traffic lights, a railroad crossing, Bicycle.
Safe Driving Rules and Regulations
Safe Driving Rules and Regulations
Before Between After.
Signs, Signals, and Pavement Markings
Static Equilibrium; Elasticity and Fracture
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
PSSA Preparation.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
US 52 Corridor Study Public Meeting November 15, 2010.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Signs, Signals and Roadway Markings
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Oregon Pedestrian and Bicycle Safety Implementation Plan.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Understanding the Purpose of Pavement Markings
80 th and Foster Intersection Analysis Kevin Hace Chris Hass Matt Palmer CE 410/510: Bicycle and Pedestrian Engineering Design.
TRAFFIC SIGN BY kru Somjai Triratsuk Warning Signs School Signs Slipper Road Turn left Curve Right.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Highway Functional Classification Chapter 16 Dr. TALEB M. AL-ROUSAN.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
SIGNS, SIGNALS AND ROADWAY MARKINGS. SECTION OBJECTIVES 1. State the meaning of the eight shapes and colors used for traffic signs 2. Describe the actions.
Right-of-Way Who Goes First?.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
 Warn drivers about dangerous situations  The are for road conditions that need caution for specific hazards that may be encountered.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Do Now Questions 1. When parking downhill on a street with a curb, the vehicles wheels should be? 2. The most common type of parking on city streets and.
Norwalk Bikeway and Pedestrian Transportation Plan Fitzgerald & Halliday, Inc. with Alta Planning + Design and Stantec Innovative Planning, Better Communities.
Saving the King Street Bicycle Boulevard
Traffic safety for cyclists and pedestrians
District 3 Complete Streets Projects
Signs, Signals, and Markings
Safety Effects of Marked vs
Design Standards.
Rules of the Road Chapter 10
Presentation transcript:

Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking

Biking trips in Boulder

About Boulder 101,500 people 25 square miles County seat Home of CU-Boulder serving 29,000 students Gateway community to the Rocky Mountains 101,500 people 25 square miles County seat Home of CU-Boulder serving 29,000 students Gateway community to the Rocky Mountains

Pearl Street Pedestrian Mall

Boulders Greenway System a series of corridors along Boulder Creek and six of its tributaries

Greenway paths Bear Creek Path Boulder Creek Path

On-Street bike facilities

Multi-use Side Path

Biking System Underpasses 67 built 55 more proposed Multi-use path miles 105 built 65 more proposed Underpasses 67 built 55 more proposed Multi-use path miles 105 built 65 more proposed

Biking System On-street lanes miles* 192 built 110 more proposed *Includes bike shoulders 95% of arterial streets have bike facilities Bike racks on all buses On-street lanes miles* 192 built 110 more proposed *Includes bike shoulders 95% of arterial streets have bike facilities Bike racks on all buses

Three Projects Making Connections 1.Enhanced Pedestrian Crossings 2.Multi-use path crossings 3.On-street bike facility improvements 1.Enhanced Pedestrian Crossings 2.Multi-use path crossings 3.On-street bike facility improvements

Enhanced Pedestrian Crossings State Law - Yield to Pedestrians signing Pedestrian Actuated Flashing Beacons at Crosswalks Raised Crossings at right turn by-pass islands State Law - Yield to Pedestrians signing Pedestrian Actuated Flashing Beacons at Crosswalks Raised Crossings at right turn by-pass islands Enhanced pedestrian crossings

State Law Yield To Pedestrian Signing Enhanced pedestrian crossings

Flashing Beacon Warning Signs Enhanced pedestrian crossings

Raised Crossing at Right Turn By-Pass Island Enhanced pedestrian crossings

140 Pedestrians in 3 hours. Volume = 14,000 vpd. Original Compliance - 34% New Compliance - 65% No Significant accident trends Arapahoe Avenue and 13th Street State Law - Yield to Pedestrians signage Enhanced pedestrian crossings

Walnut Avenue and 9th Street State Law - Yield to Pedestrians signage 190 Pedestrians in 3 hours. Volume = 10,000 vpd. Original Compliance - 54% New Compliance - 93% Fewer X-walk accidents after pedestrian treatment Enhanced pedestrian crossings

Canyon Boulevard & 11th Street Ped-actuated flashing beacons with in-pavement lighting 460 Pedestrians in 3 hours. Volume = 20,000 vpd. Original Compliance - 38% New Compliance - 76% Fewer X-walk Accidents after pedestrian treatment

Pearl Street & 29th Street Ped-actuated flashing beacons (No in-pavement lighting) 70 Pedestrians in 3 hours. Volume = 22,000 vpd. Original Compliance - 26% New Compliance - 54% No significant accident trends Enhanced pedestrian crossings

500 Pedestrians in 3 hours. Volume = 35,000 vpd. Original Compliance - 16% New Compliance - 70% MORE X-walk accidents after pedestrian treatment Broadway & Pleasant Avenue Pedestrian-actuated flashing beacons Enhanced pedestrian crossings

Foothills Parkway off-ramp to Table Mesa Raised Crossing at right turn by-pass island 110 Pedestrians in 3 hours. Volume = 6,000 vpd (right turning traffic only). Original Compliance - 69% New Compliance - 92% Accident Trends? Enhanced pedestrian crossings

ADOPTED GUIDELINES Enhanced pedestrian crossings

Standard Crosswalk Treatment is State Law Yield to pedestrians Sign Enhanced pedestrian crossings

Pedestrian Crossing Thresholds Enhanced pedestrian crossings 20 in one hour 18 over 2 hours 15 over any three hours Young, elderly, and disabled pedestrians count 2x toward thresholds

Enhanced pedestrian crossings All Roadway Multi-use path crossings of Roadways are Marked

Enhanced pedestrian crossings Bike Actuated Flashing Beacon Sign

Multi-Use Path Crossings

South Broadway Bikeway Study Multi-use path crossings

Outbound Driveway Crossing Multi-use path crossings BeforeAfter

Inbound Right Turn into Driveway Crossing Multi-use path crossings BeforeAfter

Demonstration: Driveway Crossing Multi-use path crossings

Multi-Use path Crossings Typical treatments for: Unsignalized Intersections Signalized intersections Signalized intersectons with Right turn By- pass islands Driveways Typical treatments for: Unsignalized Intersections Signalized intersections Signalized intersectons with Right turn By- pass islands Driveways

Typical Unsignalized intersection Multi-use path crossings

Typical Signalized intersection Multi-use path crossings

Typical Signalized intersection with Right Turn By-Pass Island Multi-use path crossings

Raised Crossing at Right Turn By Pass Intersection

Typical Driveway Crossing Multi-use path crossings

On-Street Bicycle Lane improvements

Bikeway Corridor Signing Bikeway Corridor Sign Plans System Identification Corridor Naming Facility Type Directional arrow Bikeway Corridor Sign Plans System Identification Corridor Naming Facility Type Directional arrow

Bikeway Corridor Signing Bike facility improvements

Bike Lane Marking at intersections On-street bike facility improvements

Stripe Bike Lane Marking to intersection On-street bike facility improvements

Shared lane Marking South Broadway bike Route On-street bike facility improvements

Shared lane Markings for Downtown arterial bike Routes On-street bike facility improvements

Contact Information Marni Ratzel Bike & pedestrian Transportation Planner GO Boulder/city of Boulder Marni Ratzel Bike & pedestrian Transportation Planner GO Boulder/city of Boulder