2013 C&MS Traffic & Roadway Spec Updates Office of Construction Administration Dan Groh.

Slides:



Advertisements
Similar presentations
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Part 9 Traffic Controls for Bicycle Facilities. 9A.03 Definitions Relating to Bicycles Adds a definition for Bicycle Facilities Removes the definition.
2003 MUTCD Chapter 2B Regulatory Signs
Part 7 Traffic Controls For School Areas. Section 7A.01 STANDARD statement changed to GUIDANCE statement TCDs in school areas should be related to: Volume,
Signing Plan Design - At Grade Intersections TEM Chapter 6-4
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Regulatory Signs.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Warning Signs.
Signing Plan Design - At Grade Intersections Sample Plan Set
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Application Guidelines Guide Signs
* 07/16/96 Guide Sign Design June 18-19, 2013 Arden Hills, MN *
Living on the Edge Pavement Markings 101
ODOT Structure Project Manager Seminar Specifications
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2011 Conaway Conference Structures Update.
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
2013 Construction and Material Specifications Hydraulics and Environmental Summary Gary Angles, Office of Construction Administration.
How would you like it if people drove their cars thru your office?
INSPECTION OF RISK AND ANALYSIS OF INSPECTION REPORT A PRACTICAL APPROACH PRESENTED BY AJAY K. JAIN.
2013 C&MS Pavements Specification Updates Craig Landefeld, P.E. Construction Pavements Engineer.
Corrosion Resistant Reinforcing Steels.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Installation of Loops on resurfacing projects through maintenance Ted Swansegar
Changes to Price Adjustment Provisions Division of Construction Management.
15. Oktober Oktober Oktober 2012.
High School Softball Strike Zone
Signs, Signals, and Pavement Markings
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
2-10 ODOT Sign Policy and Guidelines for the State Highway System Ch. 6 – Construction and Maintenance Signs Oregon Department of Transportation Traffic-Roadway.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
Maintenance of Traffic (MOT)
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Welcome to Inspecting Maintenance of Traffic Items on Projects
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Florida Department of Transportation, November 2009
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Signs, Signals, Markings & Speed Limits Driver Risk Prevention Curriculum State of New Hampshire Departments of Education and Safety Division of Program.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
MoDOT’s Inventory Systems and Measures for Pavement Marking and Roadway Signing Jim Carney State Maintenance Engineer October 2004.
2015 Traffic Signals 101 Topic 12 Special Provisions.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
Business Owners and Managers and the Fire Code
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
ESTIMATES UPDATE TRAINING BULLETINS FOR 2013 Melissa Hollis, Basis of Estimates Coordinator August 1, 2013 webinar.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
By Tanya Bankston.  Current Version of the manual was prepared by Neel-Schaffer in 2002  The Traffic Signal Manual is currently being updated by DOTD.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
ALDOT Specifications Update
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
* Topic 12 Special Provisions
Presentation transcript:

2013 C&MS Traffic & Roadway Spec Updates Office of Construction Administration Dan Groh

606 GUARDRAIL Materials: – Concrete shall now be Class QC Misc., QC 1 and QC – Deep Beam guardrail now includes Type MGS.

607 FENCE Materials: Concrete shall now be Class QC Misc., QC 1 or QC 2 instead of Class C, F, or S. Section , Clearing and Grading has been changed to Clearing, Grading and Seeding. Sections and : (B) Type CL Fence has been changed to Type CLT Fence.

607 FENCE *NEW* Item 607 – Fenceline Seeding and Mulching. Deduct the area paid for under Item 607, Fenceline Seeding and Mulching from Item 659, Seeding and Mulching quantities.

614 MAINTAINING TRAFFIC Item 614 has been revised to include the construction and maintenance of facilities for bicycle traffic, and bicycle lanes. **614.02B - Traffic facilities Changed the language to require Contractor to maintain the roadway including potholes and added other pavement deficiencies

614 MAINTAINING TRAFFIC Method of Measurement has been revised. – Line quantities for Work Zone Pavement Markings will be the length of the completed stripe, including gaps, intersections, and other sections of the pavement not normally marked. – Portable Changeable Message Sign will no longer be measured in Days. The Department will measure Portable Changeable Message Sign by the number of months each sign is at the project, or project storage yard, and immediately available for project use. See specification for additional details.

622 CONCRETE BARRIER Materials has been revised to replace Concrete, Class C with Concrete, Class QC Portable Concrete Barrier has been revised to Portable Barrier.

622 CONCRETE BARRIER Method of Measurement: When measuring Concrete Barrier by the number of feet along the centerline of the top of the barrier, measurement shall exclude end anchorages and excluding sections will be paid for separately. Department will measure Reinforced End Anchorages (Each) and End Sections (Each) by the number complete in place Basis of Payment: The cost of Aggregate Base is now incidental to this item.

622 CONCRETE BARRIER **NEW** 622 ITEMS* 622 Each Concrete Barrier End Anchorage, Reinforced, Type ____ 622 Each Concrete Barrier End Section, Type ____

625 HIGHWAY LIGHTING Materials, Foundations, and Raceways and Conduits, the use of Concrete, Class C has been changed to Concrete, QC Misc. or QC Method of Measurement: Foundation for light poles has been revised to include raceways, concrete, backfilling, and when required the 8 foot or 10 foot foundation section of concrete barrier, and the disposal of surplus excavation. For light poles or light towers mounted on median barrier or retaining walls, the junction box at the point where the stub conduit to the light pole or tower joins the main lighting circuit raceway and the stub conduit from the junction box to the light pole or light tower are also included.

630 TRAFFIC SIGNS AND SIGN SUPPORTS Materials: Concrete, Class C is no longer used and has been changed to Concrete, QC Misc. or QC Specific Service and Tourist-Oriented Directional Signs: These signs will now be maintained in accordance with , instead of a private company, unless indicated otherwise in the plans.

630 TRAFFIC SIGNS AND SIGN SUPPORTS has been revised to include delivery. Removal and Storage, Reerection, or Disposal of Signs and Support is now, Removal and Delivery, Storage, Reerection, or Disposal of Signs and Supports Method of Measurement: – Delivery has been included in the method of measurement. The Department will measure the Removal and Delivery, Storage, Reerection, or Disposal of Signs by the number of signs removed and delivered, stored, reerected or disposed of. – The Department will measure Removal and Delivery, Storage, Reerection, or Disposal of Support by the number of supports removed and delivered, stored, reerected or disposed of.

631 SIGN LIGHTING AND ELECTRICAL SIGNS Electrical Signs: Changed sign code for School Speed Limit 20 During Restricted Hours sign from S4-3P to S5-H1 per the Sign Design Manual has been changed from REMOVAL AND STORAGE OR REERECTION to REMOVAL. Storage and re-erection is no longer part of this item. Removed items now become the property of the Contractor Method of Measurement: Verbiage regarding storage and re-erection of sign lighting equipment or electrical signs have been removed from this section.

632 TRAFFIC SIGNAL EQUIPMENT Materials and Equipment: Concrete, Class C is no longer used, and has been changed to Concrete, Class QC Misc. or QC Tether Wire: Tether wire accessories now include those shown in the appropriate Plan Insert Sheet or Standard Construction Drawing and Backup Ties, in addition to other accessories as detailed in this section Method of Measurement: Pole clamps and safety tie clamps are now included in the accessories for Tether Wire, in accordance with the applicable Plan Insert sheet or Standard Construction Drawing.

633 TRAFFIC SIGNAL CONTROLLERS Materials and Equipment: – The use of Concrete, Class QC Misc. or QC 1 has been added. – Telephone Service has been deleted has been renamed Communications from Telephone Service Uninterruptible Power Supply (UPS): A Ground Rod shall now be provided for free- standing UPS cabinets.

633 TRAFFIC SIGNAL CONTROLLERS Method of Measurement: Verbiage has been added to this item indicating that the Department will measure Communication service by the number of locations shown on the plans for furnishing Communications service to an intersection controller, and will include the modem, conduit, trenching, and wiring.

641 PAVEMENT MARKING – GENERAL Marking Types – H: Bicycle symbol markings shall now be placed using white markings. A shared lane marking includes the bicycle symbol and two sharrows. Removed references to 817. – M: Yield Lines has been added. Yield Lines shall be placed as solid white 24 isosceles triangles pointing toward approaching traffic. – The term Auxiliary Markings, when used in Items 642 through 648 now includes yield lines Basis of Payment: The Department will now pay for accepted quantities of work performed under Item 648, in addition to 642, 643, 644, 645, 646, and 647.

642 TRAFFIC PAINT Materials has been revised to remove language stating that material be furnished from the Departments Approved List. **NEW** 642 ITEMS 642 Foot (Meter) Yield Line, Type ____ 642 Each Bicycle Lane Symbol Marking, Type ____ 642 Each Shared Lane Marking, Type ____

643 POLYESTER PAVEMENT MARKING Materials has been revised to remove language stating that material be furnished from the Departments Approved List. **NEW** 643 ITEMS 643 Foot (Meter) Yield Line 643 EachBicycle Lane Symbol Marking 643 Each Shared Lane Marking

644 THERMOPLASTIC PAVEMENT MARKING Materials has been revised to remove language stating that material be furnished from the Departments Approved List. **NEW** 644 ITEMS 644 Foot (Meter) Yield Line 644 Each Bicycle Lane Symbol Marking 644 Each Shared Lane Marking

645 PREFORMED PAVEMENT MARKING Materials has been revised to remove language stating that material be furnished from the Departments Approved List. **NEW** 645 ITEMS 645 Foot (Meter) Yield Line, Type ____ 645 Each Bicycle Lane Symbol Marking, Type ____ 645 Each Shared Lane Marking

646 EPOXY PAVEMENT MARKING Materials has been revised to remove language stating that material furnished be from the Departments Approved List. **NEW** 646 ITEMS 646 Foot (Meter) Yield Line 646 Each Bicycle Lane Symbol Marking 646 Each Shared Lane Marking

647 HEAT-FUSED PREFORMED THERMOPLASTIC PAVEMENT MARKING Materials has been revised to remove language stating that material furnished be from the Departments Approved List. **NEW** 647 ITEMS 647 Foot (Meter) Yield Line, Type ____ 647 Each Bicycle Lane Symbol Marking, Type ___ 647 Each Shared Lane Marking, Type ____

648 SPRAY THERMOPLASTIC PAVEMENT MARKING **NEW** - ITEM 648 SPRAY THERMOPLASTIC PAVEMENT MARKING 648 Mile (Kilometer) Edge Line, ____ inch (____ mm) 648 Mile (Kilometer) Lane Line, ____ inch (____ mm) 648 Foot (Meter) Center Line 648 Foot (Meter) Channelizing Line, ____ inch ( ___ mm) 648 Foot (Meter) Dotted Line, ____ inch (____ mm) 648 Foot or Sq. Ft. (Meter or Sq. M.) Removal of Pavement Marking 648 Lump Sum Two-Way Radio Equipment

661 PLANTING TREES, SHRUBS, PERENNIALS AND VINES 661 Planting Trees, Shrubs, and Vines has been changed to 661 Planting Trees, Shrubs, Perennials and Vines Description has been revised to include furnishing and maintaining perennials. Landscape watering is to be provided according to Item 662.

Proposal Notes & Supplemental Specifications PN 607 Fence Rescinded. Incorporated into 2013 C&MS 607. PN 614 C&MS Revisions for Construction Vehicle Conspicuity Rescinded. Incorporated into 2013 C&MS 614. PN 661 Planting trees, Shrubs, Perennials, and Vines Rescinded. Incorporated into 2013 C&MS 661.

Proposal Notes & Supplemental Specifications SS 817 Spray Thermoplastic Pavement Markings Rescinded. Moved to 648 in 2013 C&MS. SS 917 Spray Applied Thermoplastic Markings Rescinded and moved to 2013 C&MS 740.

Questions Dan Groh, P.E. Construction Traffic & Roadway Engineer Office of Construction Admin Division of Construction Management Ohio Department of Transportation 1980 West Broad St (Mail Stop 5190) Columbus, OH Phone: