Quality Assurance for Emulsified Asphalt Surface Treatments

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

FHWA Qualification Requirements for Laboratories NACLA Forum February 11, 2009 Mike Rafalowski Materials Engineer Office of Pavement Technology Federal.
EMS Checklist (ISO model)
Checking & Corrective Action
Monitoring the Product Production, Import, Wholesale and Retail Level Monitoring.
Presented by: Derrick Castle, PCS Kentucky Transportation Cabinet Writing a Good Specification for Bridge Painting.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Quality Management System
Asphalt Quality Assurance Program
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Technical requirements  Sampling  Analysis  Reporting of the results.
ISO 9000 Certification ISO 9001 and ISO
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
5.2 Personnel Use competent staff Supervise as necessary
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Project co- financed by Asean European Committee for Standardization Implementing Agency Project co-financed by European Union Module 7 GMP Workshop Kuala.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Occupational Health and Safety
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Allen Hughes State Materials Office
Please use the following two slides as a template for your presentation at NES. Internal Audits: How to Plan and Perform Roy De Lauder, CPPM, CF Property.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
1 PTCS Training, Certification and Quality Assurance Equivalency November 4, 2003.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Slide 1 Subpart O What’s Working & What’s Not Deepwater Operations Conference and Exhibition November 10-12, 2009.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
Visit us at E mail: Tele:
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Update from FHWA Emulsion Task Force
ISO/IEC
How to Implement an IG Manufacturing Quality Procedure System
Third Party Activities for FH1 Project
QC Document Update Todd Shields, INDOT.
Acceptance Process for Manufactured Products by Certification:
Construction Management
Quality Assurance: Pay Factors and Dispute Resolution
Chip Seal Quality Assurance Guide
Quality Control Personnel Training
Quality Assurance For Emulsion Treatments In Pavement Preservation
Good Laboratory Practices
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Emulsion Task Force Meeting
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Emulsion Task Force (ETF) Meeting
Operationalizing Export Certification and Regionalization Programmes
First Article Inspection
Advancing Pavement Preservation Through Certification
Chapter 11 Quality Control.
Prime Factors for Successful Preservation Treatments
ISO 9001:2000 Management System Overview
Software Reviews.
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

Quality Assurance for Emulsified Asphalt Surface Treatments ETF Meeting – Indianapolis, Indiana November 28 & 29, 2018 Larry Galehouse, P.E., P.S. National Center for Pavement Preservation

Qualified Personnel Training is essential for successful pavement preservation projects.

Qualified Personnel Contractor and agency employees need to acquire knowledge about how to build a pavement preservation treatment.

Qualified Personnel Technicians conducting material sampling and testing for quality acceptance or quality control activities need to be certified by a nationally recognized organization.

Qualified Personnel Certain contractor employees need to be certified for the treatment(s) they construct. These employees should include: Superintendents Foreman Operators of major equipment

Qualified Personnel Certification is confirmation that a person has the necessary knowledge of a specific pavement preservation treatment and through verification by examination from a recognized independent third party specializing in the field.

Project Selection Fiscal constraints and pressure from legislators and administrators force agencies to work on pavements too far down the deterioration curve.

Project Selection Pavement Management Systems Pavement Inventories Type, Age, Location, etc. Ride Quality Measurements Distress Functional and Structural Rutting Faulting

Project Selection Field Review (Windshield Survey) Asphalt Pavements Oxidation Early Raveling Bleeding Drainage Issues Concrete Pavements Joint Seals Pop-outs

Poor choices for pavement preservation. Project Selection Poor choices for pavement preservation.

Causes of Poor Pavement Performance in USA

Quality Control The system used by a Contractor party to monitor, assess and adjust their production or placement processes to ensure that the final product will meet the specified level of quality.

Acceptable Quality Control Plan Scope and Reference Documents Definitions Quality Control Personnel Quality Control Testing Facilities and Equipment Materials Control Quality Control Sampling and Testing Production Equipment Treatment Placement and Workmanship Documentation Non-Conformance and Corrective Action

Quality Control Plan Parts SCOPE and REFERENCE DOCUMENTS ASTM Standards AASHTO Standards Guidelines and Technical Bulletins Standard Specifications and Project Special Provisions

Quality Control Plan Parts DEFINITIONS Making Terms Used in QC Plan Clear and Distinct

Quality Control Plan Parts QUALITY CONTROL PERSONNEL Company Personnel Responsible for QC Subcontractors Responsible for QC Material Suppliers Meeting Testing Requirements

Quality Control Plan Parts 4. QUALITY CONTROL TESTING FACILITIES and EQUIPMENT   Laboratory Used for Material Sampling and Testing Laboratory Used for Mix Designs Must be Accredited Laboratories

Quality Control Plan Parts 5. MATERIALS CONTROL   All Materials Used in Treatment are Identified List of Approved Material Sources Storage Requirements and Stockpiling Provisions

Quality Control Plan Parts 6. QUALITY CONTROL SAMPLING and TESTING Lot Size Defined for Sampling Sampling Identification System Storage and Retention Procedures for Samples Sampling Methods, Test Procedures and Frequency

Quality Control Plan Parts 7. PRODUCTION EQUIPMENT Identify All Equipment Used During Construction Provide Spec Sheets for Major Equipment

Quality Control Plan Parts 8. PLACEMENT and WORKMANSHIP Calibration Procedure for Equipment Equipment Checks, Inspection Methods and Frequency Pavement Surface Preparation Procedures Pre-Production Quality Control Checks Related Production Activities Traffic Control Tack Coat, etc.

Quality Control Plan Parts 8. PLACEMENT and WORKMANSHIP - continued Critical Factors That Can Affect Production Results Identify Protocols for Proper Workmanship Production QC Activities, Test Frequencies, and Inspection Methods Cleanup Daily End of Project

Quality Control Plan Parts 9. DOCUMENTATION Examples of Reporting Forms Production Quality Control Reporting Sampling and Testing Results Daily Production Records Non-Conformance Report Document Retention Details

Quality Control Plan Parts 10. NON-CONFORMANCE and CORRECTIVE ACTION Corrective Actions Described for: Materials Not Meeting Specifications All Potential Defects in Workmanship

Quality Control Plan Parts APPENDICES – Supporting Documents Company Organization Chart Resumes of QC Personnel Employee Certifications Equipment Specifications Examples of Report Forms

Agency / Owner - Acceptance Acceptance is the process which the Agency, Owner, or Designated Agent determines whether the quality of the product meets the contract requirements.

Agency / Owner - Acceptance The Agency, Owner, or Designated Agent will verify the degree of compliance by independently performing: Random Material Sampling and Testing Inspection of Workmanship

Agency / Owner - Acceptance The objectives of acceptance are to: Perform sampling and testing for key quality characteristics. Inspect to identify visually deficient work. Measure the quality of all materials produced and placed by the contractor. Determine the corresponding payment the contractor should receive.

Questions