Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.

Slides:



Advertisements
Similar presentations
Zhongxing Telecom Pakistan (Pvt.) Ltd
Advertisements

Chapter 1: The Database Environment
Making the System Operational
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Obtain 24/7 Powerful Asset and Connectivity Management Software for Enterprise Data Centers.
Server Technology Confidential Page 1, June 22,2009 Server Technology Global Services.
1 an online tool for GSM networks Planning and Inventory and others… IMK Consulting Simple tools for complex needs IMK – your IT tailor.
Quality Improvement and Control System QuIC ILYA NIKANOROV
An Introduction to System Administration Chapter 1.
April 2004 page 1 Confidential and propietary CentraLine Portfolio c l o s e t o y o u.
Multidimensional Database Structure
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Lecture 13 Revision IMS Systems Analysis and Design.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer 2003.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2004.
Computers: Tools for an Information Age
© 2007 by Prentice Hall 1 Chapter 1: The Database Environment Modern Database Management 8 th Edition Jeffrey A. Hoffer, Mary B. Prescott, Fred R. McFadden.
CS27510 Commercial Database Applications. Maintenance Maintenance Disaster Recovery Disaster Recovery.
Software projects Management & Development Alireza Saebi
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
ICAT3025A - Install and optimise operating system Information and Communications Technology (ICA05)
Mechatronics: An On-Boarding Corporate Training Example Jay Bouis Coordinator of Technical Training The Community College of Baltimore County Penny Jung.
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
1 COBA Presentation for the press, Tuomas Koskenranta.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
MIS 385/MBA 664 Systems Implementation with DBMS/ Database Management Dave Salisbury ( )
Chris Wright Senior Systems Engineer, Lucity IMPORT & UPDATE.
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Introduction to network management. INTRODUCTION ● Course Overview ● Course Objectives.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
1 / Name / Date IDA Interface for Distributed Automation The journey toward Distributed Intelligence.
Chapter 1 Chapter 1: The Database Environment Modern Database Management 8 th Edition Jeffrey A. Hoffer, Mary B. Prescott, Fred R. McFadden © 2007 by Prentice.
My Career I chose to pick a web developer because I always wanted to a little bit more about them!
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
1 Database Systems Instructor: Nasir Minhas Assistant Professor UIIT PMAS-AAUR
Control System Design Process Planning Documentation.
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Mobile application for digital verification of mobile work activity with smart configuration systems (patent pending) Created by Marjan Kotorcevik.
ORACLE APPS TECHNICAL ONLINE TRAINING % VIDEO CLASS | APPS TECH USA-UK-CANADA Online | classroom| Corporate Training | certifications | placements| support.
6/19/2016 أساسيات الأتصال و الشبكات Communication & Networks Fundamentals lab 4.
The South Texas Association of School Maintenance Officials By Climatec Providing safe, comfortable and energy efficient buildings for over 40 years.
Managing Data Resources File Organization and databases for business information systems.
Faculty Economics & Business EBS 2033 Systems Development Lecture 1 The Systems Development Environment Lecturer: Puan Asleena Helmi.
© 2015 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton software.
Daniel Black – SQL Server Developer What is SetFocus  The SetFocus SQL Master’s Program is an intensive, hands– on, project oriented program allowing.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
ABB HVDC Care Customer training.
Windchill Customization
Chapter 1 The Systems Development Environment
Smart Modular Actuator
MECHATRONICS INTRODUCTION May 25, 2013.
Chapter 1 The Systems Development Environment
Introduction to Operating Systems
Chapter 1 The Systems Development Environment
System And Application Software
Planning a Network Upgrade
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
REMOTE POWER MONITORING OF MARINE SITES
An Introduction to System Administration
Chapter 1 The Systems Development Environment
Field installable, upgradeable and scaleable
Presentation transcript:

Essentials of project management Lecture 8

Targets of Lecture Introduction to project management –Understanding the target process in typical projects –Required tools in each phase of the project –Key requirements for a successful project Duration: 1 hour

Typical project tasks System design System configuration Installation and wiring Commissioning and testing Project management ~20% ~30% ~10% ~15% ~20% TIME SHARE: User interface creation PROJECT SALES ~5% MAINTENANCE Yellow = level 1 skills Blue = level 2 skills Green = level 3 skills

Typical project tasks, detailed Shop Drawings Data Point Schedules (Valve selection & ordering) Network design Cabling I/O points to modules/controllers Cabinet layouts Internal connections of cabinets Module/controller configurations Cabinet build-up & installation Field device connections Module/controller commissioning & testing COBA UI creation COBA server installation COBA testing & final fixing

System design Design documents: Layout pictures –Electrical, air-conditioning and piping, automation, security, etc Functional description Network design Automation cabinet design –Layout picture (needed for producing automation cabinets) –Internal connections (needed for producing automation cabinets) Device design –Field devices –Valve selection –I/O-point allocation to modules/controllers Cabling design –Cable list –Connections between cabinet and distribution box (needed at the site) –Field device connections

System configuration Lonix automation system: –Configuration of system and I/O functionality (PCT) –LON network database (NL220) –LON network bindings (CSV-file) (PCT) Lonix security system: –Configuration of door and intruder alarm functionality (PCT) –Door group, schedule and access right definitions (PCT) COBA user interface for automation and security –User interface modeling (COBA Editor) –Graphical drawing for user interface (COBA Editor)

Installation Cabinets –Manufacturing of the cabinets –Installing modules/controllers, relays etc to cabinets according to design documents Wiring –Wiring cables according to cable list Installation –Installing field devices (sensors, actuators, switches etc) Coupling –Coupling of field devices according to cabling design documents

Commissioning and testing Testing of all I/O points –Documented in the Testing table (PCT) Setting the setpoints and other settings System tuning

Customer training Creation of user documents –SCADA system instruction –Maintenance instructions for field devices Hands-on training for users

Important in project management Characteristics of a good project manager –Technical competence (automation) –General knowledge about building management and security systems –Understanding of HVACE processes –Knowledge about LonWorks technology –Other favorable characteristics –Diligence and preciseness –Ability to make decisions as the project requires –Ability to learn from earlier mistakes Challenges –Doing things only once in the right way –Avoiding unnecessary complexity –Keeping the project continuously moving into right direction –Effective coordination of tasks between everybody involved in the project –Keeping the ultimate target in mind instead of only small details Important routines –Regular supervision work (weekly/monthly visit to site) –Regular working routines (meetings, discussions, s, documents)