Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.

Slides:



Advertisements
Similar presentations
1 US Investigator Meeting DIAS-4, Chicago, July 2011 Good Clinical Practice (GCP) for Investigators and the Research Team.
Advertisements

Aircraft Maintenance Records
Operations Management Maintenance and Reliability Chapter 17
INTERNAL CONTROLS.
1 Compliance Responsibilities: National Service Criminal History Checks Corporation for National and Community Service Office of Grants Management, Washington,
COMPANY MAINTENANCE MANUAL
RECORD KEEPING Cooperative Development of Operational
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
THE EXPERIENCE OF E-PROCUREMENT IN LITHUANIA Rasa Noreikienė Vice-Minister of Economy of the Republic of Lithuania 1.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
3/2/ STANLEY LIGAS, et al. v. JULIE HAMOS, et al. First Annual Report of the Monitor September 27, 2012 Tony Records, Monitor
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
1 Utilities Reduction Specialists, Inc. a cost management company Slide 1 of 9 You would not intentionally Burn Cash, yet 80% of organizations may as.
VA Mission & Vision Mission Vision
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Fountain School District 8 Ian Weikel Elementary School BESTs 1 st Completed New School Project August 2010.
Site Safety Plans PFN ME 35B.
Highway Maintenance and Preservation Needs
Background Presenters Work done in preparation for WHS changes
CAERNARVON TOWNSHIP LANCASTER COUNTY June 17, 2013.
Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
BLR’s Safety Training Presentations
The Current State of Interstate Maintenance Contracting September 23, 2010 Jake Porter Assistant State Maintenance Engineer (acting)
EU Remedies Directives Update Florence Gregg figpc ltd, M:
U.S. Army Expeditionary Contracting Command 409 th Contracting Support Brigade Contract Closeout. as of March 22, 2012 UNCLASSIFIED 1.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
Hazardous Waste Section
Town of Plattsburgh Street Light 2012 Proposal. Sold to Municipalities starting in 1950 Extra Energy was in the grid during off peak hours. NYSE&G began.
Ventura County Mobile Home Park Rent Review Board Hearing February 26, 2014 Proposed Amendments to Mobile Home Park Rent Control Ordinance Project No.
May 17, 2012 Lottery Marketing & Incentive Pay: Jackpot and Economy, Not Advertising or Beneficiary Change, Appeared to Impact Ticket Sales Peter Heineccius.
Checking & Corrective Action
Evaluation Orientation Meeting Teacher Evaluation System
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education Updated: July 2011.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
© 2002 The Trust for Public Land Home Regions Programs Staff Details Appendix Conserving Land for People Enforcing Covenants Craig Lee Vice President The.
General OH&S Induction Training Course 1 WHAT’S SO IMPORTANT ABOUT OCCUPATIONAL HEALTH & SAFETY? IN THE YEAR 2003, MORE PEOPLE WERE KILLED IN WORK RELATED.
SHIFTING INFORMATION SECURITY LANDSCAPE FROM C&AS TO CONTINUOUS MONITORING ANDREW PATCHAN JD, CISA ASSOCIATE IG FOR IT, FRB LOUIS C. KING, CPA, CISA, CMA,
Safety and Health Programs MODULE 7. 2©2006 TEEX Brainstorm  What makes a good safety and health program?  What does a good program do for you?
City Council Meeting Agenda Items October 28, 2013.
Strategy Review Meeting Strategy Review Meeting
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
FISCAL YEAR Finance/IT Department Budget Presentation.
Housing Benefit Update
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Commission Briefing Low Performing Schools in Urban High Poverty Communities November 11, 2014 House Committee on Education.
Counting Those Contributions The Match Matters!. Authority Sections 403(a), Essential Assistance and 502, Federal Emergency Assistance, of the Robert.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Marcy Mealy Procurement Specialist CDBG Program
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Genesis Solar Module Brochure ™
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
AANDC Presentation at the OFNTSC Southern Tribal Council Meeting Chippewas of Rama, Ontario October , 2012.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
CPAWC Meeting Nov. 12 th,  Some sidewalk tripping hazards are obvious and dangerous!
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Training Appendix for Adult Protective Services and Employment Supports June 2018.
Continuum of Care Program (CoC) Training Requirements Related to Housing Assistance Rent Reasonableness, Fair Market Rent (FMR) and Housing Quality Standards.
Construction Operation
TSAG Overview Mission Vision Core Values Operating Principles.
Fiber Reinforced Polymer Systems
Presentation transcript:

Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division

Property Management Contract Oversight Presentation Outline Safety Rest Area Program Background Contracted Services Inspection History Inspection Results Implementing Lessons Learned

Safety Rest Area Background Property Management Contract Oversight 43 sites… Buildings 850 to 17,500 square feet Over 141,000 square feet total Owned and operated utilities 12 waterworks 8 wastewater works 9 pump stations 22 emergency generators Sites 4 to 47 acres Over 640 acres total Average Daily Visitation 290 to 4,800 daily visitors per site Over 32 million visitors per year

Property Management Contract Oversight

Safety Rest Area Background Property Management Contract Oversight Recent Capital Outlay investments… Between 2006 and 2013 Rebuilt 3 sites Renovated 23 sites $30 + million

Contracted Services Property Management Contract Oversight 7 contracts… Turnkey, Property Management Total management 24/7 Operations, maintenance and preventive maintenance, fixed monthly costs, $14 million annually Any repair/replacement paid for in addition to fixed costs, $3 million annually Performance Measures Over 300 specific performance measures Some allow Contractor time to remedy – Repair or replacement items Some are required continuously or immediately – cleanliness 3 contractors Over 400 personnel and subcontractors

Inspection History Property Management Contract Oversight First total outsourcing contracts Fixed monthly costs Limited to no funding for repairs/replacements Limited to no inspections Performance Based Fixed monthly costs Increased funding for repairs/replacements Performed monthly inspections by VDOT personnel when available Limited to no inspections initially Added two consultant inspectors towards end of term

Inspection History Property Management Contract Oversight Performance based contracts; added project managers and preventive maintenance detailed requirements Fixed monthly costs Funding available for repairs/replacements Monthly inspections

Inspection History Property Management Contract Oversight 2011 year of startup for new contract… Inspectors were given an inspection sheet, no training or instruction, possibly a copy of the contract No quality control program: inspector visits same sites on same day of each month; windshield inspections the norm for parking areas; forested grounds and non-public access areas rarely inspected. Inspection results were often negotiated onsite prior to report submission. Inspectors allowed to exercise concessions on behalf of the owner. VDOT management became frustrated with contractor lack of: responsiveness to deficiencies, identifying repair needs, oversight of repair work, and understanding of the contract requirements (some significant wastewater works deficiencies had occurred).

Inspection History Property Management Contract Oversight In early 2012 … Management decided to redirect inspection procedures: 1.Inspectors required to study and reference the contract and VDOT direction only. 2.Developed and implemented a statewide consistent cloud based photo inspection report, utilizing 300+ contract performance measures, and standardized evidence based findings. 3.Inspector is no longer allowed to assist and train contractor staff on how to complete required work. 4.However, while onsite, the inspector verbally shares inspection findings with site supervisor. Each inspector reads, out loud, the contract language and requirements related to findings of deficient items onsite for site staffs immediate benefit.

Inspection History Property Management Contract Oversight 2012 continued… 5.A copy of the inspectors report is no longer provided to the contractor at the end of the onsite inspection event. The draft inspection report goes through 2 quality control processes to ensure consistency with contracts and VDOTs direction. The same inspector does not return to same site in two consecutive months (with rare exceptions). 6.Inspection date is strategically varied month to month. Contractor is not aware of when an inspector may show up. 7.Inspectors are directed to evaluate all contract requirements on site and document in accordance with the contract. 8.Also began to exercise spot check inspections to address serious, high risk, concerns.

Property Management Contract Oversight

Inspection Results Property Management Contract Oversight … Avg # of deficiencies per site Less than …first three months Avg # of deficiencies per site Over 100 Repairs Needed Less than …last three months Avg # of deficiencies per site About 50 Repairs needed: Over 300

Inspection Results Property Management Contract Oversight

Lessons Learned Property Management Contract Oversight Lessons being learned in 2013 As a result of inspections being more rigid, thorough and consistent with Contracts, the following has been determined thus far: Placing the contractors on written notice for non-compliant matters is an essential component of outsourcing. Contracts have language that is not clear and needs correction Alternative contracting methods are underway for 2014 as follows: Property Maintenance for buildings and grounds (without repairs) Property Maintenance for water and wastewater (without repairs) Statewide On-call Repair Contracts (multiple awards): General and Specialty Contractors

Property Management Contract Oversight Lessons Learned Direction from here: Continue to improve contract clarity, enforceability Ensure inspectors remain thorough and specific to the contract.

Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division R. E. Prezioso, P.E. Assistant State Maintenance Engineer