SWE IG Meeting Paris, CRE 07.04.2014 XBID Overview Supported by.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
1 The role of macro- regional strategies after 2013 The Commissions view (or rather the view of one official) David Sweet, DG Regional Policy, European.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
YES New Mexico Enterprise Eligibility System
Roadmap for Sourcing Decision Review Board (DRB)
How to commence the IT Modernization Process?
David Halldearn Energy Market Insights Limited 5 July 2010.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Intraday conclusions of NWE IG 9 May. Short term way forward (phase 1) PXs and TSOs confirmed commitment to 2012 intraday project based on ELBAS solution.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Table of contents 1 Manual of Operational Procedures (MOP) 2
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
on Congestion Management (IG)
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
ERI SWE region Madrid XBID Overview Supported by.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Paris, 1 st March th IG meeting - SWE ERI.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
How Project Management can add value to contract negotiations Lessons Learned from a clean up project Robert Gallmann, Senior Legal Counsel NOVARTIS Pharma.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
Project Status Report Presenter Name Presentation Date.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Programme Board – 100 Day Plan 10 th March 2011 working days left
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Information Sharing for Integrated Care A 5 Step Blueprint.
Information Systems Development Model, An Introduction for the Non-Technical 2005 National Immunization Conference March 22, 2005 Washington, DC.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
BANKING INFORMATION SYSTEMS
NWE Day-ahead price coupling project Cost Issue
Continuous Cross-Border Implicit Intraday Trade Status update
NWE Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
Guidance notes for Project Manager
Change Assurance Dashboard
IS&T Project Reviews September 9, 2004.
XBID Overview ERI SWE region Madrid Supported by.
XBID – A review of our 1st year and future plans
Project Name Here Kick-off Date
Presentation transcript:

SWE IG Meeting Paris, CRE XBID Overview Supported by

Agenda Project structure and interfaces High level overview of current project status XBID Joint project approach High level PX project plan with DBAG Early Start Agreement Step 1 – Overview & Timeline Update on Shipping and Nomination Summary and discussion

Project structure and interfaces

High level overview of current status (1) Cost recovery – Letter of Cost Comfort has been received by PXs and TSOs; it confirms 100% recovery of allowed costs subject to conditions. NWE+ TSOs have confirmed their agreement to the NWE+ PXs. PXs Cooperation Agreement (PCA) – Agreement has been reached between the PXs to enable the Agreement with DBAG to be signed PX/TSO Joint Project - Project Management Core Team established – program management coordination reflecting the Joint Project, PXs and TSOs. Core team meets weekly and reviews high level issues and resolution. - Joint Steering Group, Co-ordination Team and 3 Task Forces (Legal, IT and Pre & Post Coupling) are in place with members from both PXs and TSOs present in each

High level overview of current status (2) Delivery of Early Start Agreement (ESA) Step 1 – Progress has been made to complete this phase which defines the content of the solution to be developed » Investment in this phase provides the foundation for all parties – We are tackling challenging issues which are essential for the long term success of the project but which are taking time to resolve. These include: » Equal Treatment » Performance » Testing – We have a plan to complete ESA Step 1 by Easter which remains a challenge. We have an approach to close open issues if any remain at this point Initial ideas have been shared on developing the future model for shipping and nomination

XBID Joint project approach Coordinate Design and Development of Interim Solution (monitoring and directing) Project under ESA Local /Regional Implementation Projects Follow-up/coordinate implementation of Interim Solution Roadmap interim Solution LIPs framework conditions satisfied XBID Interim Solution delivered and accepted Project under contract D&D contract Business Blueprint Common framework for pre- and postcoupling Design Local /regional Implementation projects (LIPs) Roadmap info from LIPs

High level PX project plan with DBAG ESA Signature 6 weeks 4 months 1 year (depends on the project planning in ESA Step 1) ESA Step 1 ESA Step 2 Project under ESA Project under Contract Project Planning (for ESA Step 2 onwards) Quality planning Project Planning (for ESA Step 2 onwards) Quality planning Design and Development Business Blueprint D&D Contract Negotiation Maintenance Contract Negotiation Development and infrastructure FAT & IAT UAT Activi ties

Early Start Agreement Step 1 - Overview Delivery 3 Batch 2 Delivery Prior Step 1 Delivery 3 Batch 1 Delivery 1 Description of ESA deliverables: Specification of basic principles on project documentation (e.g. documentation management) Project management principles for handling of issues, changes, risks and communication Project terms and principles of equal treatment Project and quality planning, definition of the work products, test strategy

Early Start Agreement Step 1 - Timeline ESA validation by Vendor board ESA ready to be signed PCA - SC approval of 2nd step assessment ESA signed ESA validation by PX boards Comfort Letter issued PCA ready to be signed PCA signed ESA Step Completed- Date Delivery 3 Batch 2 Delivery Prior Step 1 Delivery 3 Batch 1 Delivery Decision on ESA Step 2 Stakeholder Review &Confirmation Lessons Learnt Review Mobilisation ESA Step Delay with significant impact Beginning May14 Commence ESA Step

Update on Shipping and Nomination An Intraday continuous capacity allocation market imposes far more challenging requirements to the shipping and nomination process than for the Day Ahead (DA) market –Cross-border allocation settlement processes must be concluded within a short period before real time to facilitate the short gate closure times –This requires high robustness of the TSO operational processes to conclude the cross- border capacity allocation settlement into the required schedules (e.g. for controlled devices: load frequency controllers, phase shifters & DC cable flows) The two options on cross-border nomination are being evaluated –1) Border to border and 2) Hub to hub TSOs perspective: The existing DA solutions for shipping and nomination will have limited geographic scope for the scale of implementation required to facilitate an orderly Intraday market on a pan-European scale. A hub to hub approach may be necessary. 4 aggregation options of functions for shipping and nomination have been identified for the above 2 options, which gives a total of 8 potential options to be evaluated Joint assessment of a potential centralised solution and the governance implications needs to completed. High level scoring on quality, costs, implementation time and future proofing has started at a working level and will be progressed over the coming weeks. There are resource constraints at present due to the priority on completing ESA Step 1 Full resolution of this topic is needed before start of LIPs. The immediate need, so as to ensure that the blueprint phase is not delayed, is to look at functional implications, if any, with an impact on the XBID system.

Summary and discussion Whilst progress has been made with ESA Step 1 the process and complexity, together with challenges of reaching alignment have been significant. All parties are striving to resolve key issues rather than allowing these to cause subsequent project delays These key issues involve Equal Treatment, Performance and Testing The extension of ESA Step 1 has involved additional cost All parties are targetting completion of ESA Step 1 by Easter which remains a challenge. There is a plan to allow a short period to ensure full agreement to Step 1 (including as necessary with NRAs) before starting Step 2. This also allows for a lessons learnt project review to improve processes It is expected that a period of around months will be required to deliver the XBID solution. It is essential that aspects such as Integration Testing are included to ensure robust implementation. Agreeing the future model for shipping and nominations is key. The different options being considered have varying impacts on implementation timescales, the costs of the solution and scalability. Development of the Local Implementation Projects (LIPs) and roadmap is to be undertaken once the Business Blueprint phase is completed. Where possible and subject to confirmation LIP implementation will be run in parallel with the XBID solution project