Back to the Future? Electrical/Lighting Contracts Ted Swansegar.

Slides:



Advertisements
Similar presentations
September 28, 2013 Greg Duncan, Assistant Chief Engineer of Operations Anaheim, CA Performance Based Maintenance Contracting in Tennessee (Experience One.
Advertisements

Installation of Loops on resurfacing projects through maintenance Ted Swansegar
 Examples of bid-splitting Acceptable – When a project involves different trades and is not interdependent on the other. - If you are upgrading a room.
Managing a Successful Mechanical System project Following design – what next?
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
We need to hear from you – what do you want us to do with YOUR District? We need your input so we know how to move forward in maintaining your common.
Public Works Dr. Adnan Alshiha. Public Works The community infrastructure Public work covers many functions: Street and traffic Water and sewage Engineering.
CFO Auditing Standards in the 21 st Century By James P. Kearney Performance Management Consulting, Inc. 27 July 2005.
Draft Lighting Policy Ted Swansegar Cell:
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Things to look for and remember while preparing FD05 Estimates.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Fixed Assets Kathy Hanlon Rogers Public Schools. Goals Include all the parties, auditors, librarians, M & O, Principals Accountability Vs Practicality.
Wisconsin Housing Alliance Basic Training Boot Camp Sales and Use Taxes on Manufactured Homes May 12, 2015.
SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013.
FIRE ALARM SYSTEMS AND FUNDAMENTALS
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
1 1.One stop shop -Purchases supplies from the vendor at wholesale cost: Passes saving on to customers -Saves the Agency money by: -Reducing purchase card.
Downtown Parking Study City of Meriden Prepared by Fuss & O’Neill.
Unit 123 Wishes to Install Separate Electrical Service to Garage For questions please contact your neighbor: Your Name Here(444) ,
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
2015 Traffic Signals 101 Topic 12 Special Provisions.
Jennifer P. Fogg, F. SAME, CPF Chief Executive Officer ASSET Group, Inc. SUCCESSFULL.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Old Policy – which no one ever seem to have heard of.
FAR PART 45 – Government Property
PURPOSE OF TRAINING Implement policies regarding the management and use of public funds.
WALK OUR TALK. GREEN OFFICE PLAN 10 Things we can do to “green” our office. A MANIFESTO from the Sustainability Task Force and Change Group-Philippines.
Agricultural Careers Electrician By: Dr. Frank Flanders and Anna Burgess Georgia Agricultural Education Curriculum Office Georgia Department of Education.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
FISCAL RESPONSIBILITY IN TITLE III AND OTHER SPONSORED PROGRAMS AND GRANTS ADMINISTRATION Presented by Sharon S. Crews, M.Ac., CPA Vice President for Administrative.
Things to look for and remember while preparing FD05 Estimates.
PROPERTY MANAGEMENT RAZE & REMOVAL. PROPERTY OWNER HAS FIRST RIGHT OF REFUSAL n The property owner has first right of refusal to retain and move their.
Mobile Audio/Video Recording Equipment Policy and Procedure Number PP
Is It Worth It? The Cost of Insurance. Insurance Terms Premium Deductible Underwriting.
University of Minnesota Internal/External Sales Rate Development – Advance Internal/External Sales.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Highway Operations Section Technical Standards Branch Section overview.
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION THIRD PARTY DAMAGES Rudy Powell, P.E., State Construction Engineer 2014 FTBA.
Franczek.com Copyright © 2011, Franczek Radelet P.C. All Rights Reserved. Disclaimer: Attorney Advertising. This presentation is a publication of Franczek.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Measurement and Payment
Also known as… Ways to keep Central Office Staff happy. Things you need to know!
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
STUDENT TRANSPORTATION FINANCIALS Record Keeping Completing the Claim Form.
2011 State Purchasing Forum CONTRACT COMPONENTS A Panel Discussion Moderated by: Connie Rissberger – OGS MAY State.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
Property Management Capitalization Quick Review. Why It’s Important  Subject to audit by our external auditors  Annual property review by ONR  Property.
Louisiana State University. IT GOVERNANCE LOUISIANA CONSTITUTION (allows us to purchase with state funds) LA REVISED STATUTES (provides the laws that.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
FSEP Year End Reminders
Sheridan RFP Proposal for the Purchase of Printers for HMC 1 & 2
* Topic 12 Special Provisions
Traffic Control Plan Development Course
Completing the State Aid Payment Request
New Specifications for 2017
Elements of Effective Signal Maintenance
Sales and Use Taxes on Manufactured Homes
Specifications What should it cover Goods Services Warranty
Presentation transcript:

Back to the Future? Electrical/Lighting Contracts Ted Swansegar

Survey Results

Survey results

Hourly Why? D7 and Central Office ITS were the only ones that wanted to change to hourly!!!! Reasons- – Contract easier to manage because there are less items to worry about. Quote: If we went hourly, it would make it easier for OMS. John (Contract manager) came up with about 17 line items of what he thinks it should look like. D7 – We can supply most of all the contractor supplied items with a Procard/master contract. Quote: We already have a Master Agreement for concrete. D7 – ITS does not use alot of the bid items right now and usually uses Hourly

Bid items Why? Quote: I would keep the contracts the same. I do not want to go to strictly hourly work. I do not want to have to provide the incidental items. It is just something else that I have to purchase and inventory. Dont screw the contracts up. D2 Should be no Procard purchases because contractor supplies most of the incidentals. LESS Inventory- Do not have to inventory the items that the contractor supplies The contractor usually gets the work done sooner if it is built per the bid item not hourly. CON- too many bid items and confusing because the contract managers have never been taught how each item works. CON- bid items that do not cover some installation and when hourly should be used

How should mileage be paid? QUESTIONS Do we pay for the mileage to and from worksite? Do we pay for all trips to the worksite? Do we pay for all vehicles that the contractor is using? Where do we pay the mileage from? (maintenance garage)

How do we pay for Traffic Control? QUESTIONS Do we pay the contractor every time that he moves his vehicle? Do we pay for each vehicle that is moved in the work zone? How do we pay for the lane closure if is on interstate? Who has the final say on what type of lane closure that is needed?

If the contracts stay the same? Changes Contractor- Shall be licensed by Department of Housing, Building, & Construction All electrical work shall be conducted or supervised by a licensed electrician. Incidental to bid items. Mileage and traffic control incidental (may be changed) How do we pay for the transportation of some of the hourly vehicle items. Equipment, labor, supervision is included in all bid items. Bid items for the installation of in-pavement sensor. Rubber grommets for any hole that has wires passing through them All hours to meet utility personnel is included in the electrical service bid item. Bid Items include the restoration of disturbed areas to original conditions. The removal of existing equipment- salvage policy!!!!!

Things that have not changed One IMSA II certified personnel per crew. The Contract Manager may require the replacement of an individual who is not performing satisfactorily. 3 person crew for loop installation. Contractor has to follow standard drawings on our website. Districts- please download all standards so that you know the changes that have been done in construction projects. Liquidated Damages

Possible changes Do we have separate bid items for the different wires on the Multi-conductor bid item? Or add all wires to one bid item? Bid item for the replacement of a bulb in luminaire. Bid items for reinstall/installation of sidewalks/accessible ramps. Do we need separate bid items for different sizes of conduit? Crew size- should be set for all activities!!

Hourly - when should it be used?

We need training of how to manage these contracts

These contracts will be audited!!!! WHO WILL BE AUDITED? The contract manager will be audited! The contractor will be audited! THINGS THAT CONTRACT MANAGER NEEDS TO DO Need records of what hourly and bid items that are done each day Hourly should only be used if a bid item does not cover it. No hourly vehicle should be charged if it is being used for a bid item.