Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session 6 - 27 th January 2010 Radiations to Electronics.

Slides:



Advertisements
Similar presentations
1 of 17 LUKAS PÜLLEN New prototypes for components of a control system for the new ATLAS pixel detector at the HL-LHC New prototypes for components of.
Advertisements

Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
February 2009 Summary of Chamonix 09 Steve Myers.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
LHC Beam Dumping system
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
2/2/2009 Marina Artuso LHCb Electronics Upgrade Meeting1 Front-end FPGAs in the LHCb upgrade The issues What is known Work plan.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 1. Some recent views ( ) 2 Linac tunnel
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
CLIC/CLEX controls Radiation issue August 29 th, 2012 F.Locci - BE/CO-FE.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Thurel Yves – CERN / Chamonix 2010
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
CERN Converter Control Electronics Setting the Scene
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
WorldFIP Infrastructure E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
LHC Electronics irradiation tests in the CNGS side gallery September 2009 – partial results D.Kramer for the RADWG 30/9/09report to LMC Thanks to B.Todd,
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
R2E Workshop Preparations RadWG Meeting March 25 th.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
13 th September 2012 – 0v6 Radiation Tolerant Power Converter Controls thanks to: TE/EPC/CC, Y. Thurel, A. Masi, M. Brugger, G. Spiezia.
Planning and strategy for HL-LHC R2E
Matters arising RADWG - 3 July 2009
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Irradiation test of Commercial (BASLER) digital cameras
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Radiation monitoring and follow up during LHC commissioning
Cryo equipment strategy in the R2E context
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
6th WorldFIP Insourcing Meeting
D.Kramer on behalf of the RADWG
R2E – Experience and Outlook for LS1
Accelerator and Experiment Interface Session: LS2, LS3
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Update on expected HL-LHC radiation levels
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
MICROFIP-Do we need further tests? 28th June 2011
R. Losito – LHC Performance Workshop Chamonix Jan 2010
Radiation Working Group RADWG
Presentation transcript:

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session th January 2010 Radiations to Electronics Chamonix Need substantial manpower in 2010 for integration studies

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Outline of presentations 2 Review of critical radiation areas for LHC Electronics and mitigation actions. Radiation monitoring and first results. M. Brugger / EN-STI Review of exposed equipment in the LHC: a global view. T. Wijnands / EN-STI LHC Power Converters, the proposed approach. Y. Thurel / TE-EPC Is the WorldFIP a reliable Rad-hard Fieldbus on long term? J. Serrano / BE-CO Summary of the 2009 irradiation tests and perspectives for future tests and facilities. D. Kramer / EN-STI Experience with the ATLAS radiation policy: can we say we are safe? Ph. Farthouat / PH-ESE Where are we with the Long-term plans and the CERN-wide radiation Policy. R. Losito / EN-STI

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Critical Area Overview Collimation Area (high losses possible at an early stage) LHCb: reaches early significant radiation levels Injection & Adjacent Areas: losses on collimators and dumps on TED High-Luminosity Experiments (UJs, RRs, possibly UPS) LHC Tunnel Electronics 3

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Summary Of Areas 4

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Options Mitigation Options 5 SHIELDINGRELOCATION CIVIL ENGINEERING RAD-TOL DESIGN EARLY RELOCATION OTHER

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary 6 Mitigation Possible means of mitigation: Shielding (easy + complex) [UJ87/88, UJ14/16, UJ56, …] Relocation of equipment [UJ14/16, UJ56 upgrade studies] Radiation-hard design [NanoFIP, Power Converters] Civil engineering NanoFIP Project

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Power Converters LHC60A-08V:SAFE & under control LHC120A-10V:UNSAFE but limited action can/will correct CERN design LHC600A-10V:UNKNOWN and potentially CRITICAL - Complete redesign: possible Inner Triplet Upgrade - Possible relocation has to deal with cables voltage drop LHC600A-40V:SAFE by relocation (action already launched) LHC4..8kA-08V:UNKNOWN and potentially CRITICAL - Surely the most critical item (LHC need it 100%) - Redesign is far from EPC Manpower & Plans - Action Possible: Card analysis card redesign & test - Relocation OK if cryo line added (Cable Voltage drop) - Inner Triplet Upgrade does not solve RR1&5 situation Point 1 & Point 5 [ 301 converters ] LHC120A-10V (87) LHC600A-10V (80) LHC4..8kA-08V (66)

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary TE-EPC position and recommendations We could survive 3-4 years, waiting for a civil engineering work upgrade if chosen. Our actual power converters should not be placed in areas more than 2-3 Gy/year. UJ56 is announced at 5 Gy/year, which means majority of our equipments are dead after only 8-10 years. [ However SEE induced errors are still uncertain. ] Biggest fear is that troubles arrive in some years only (high luminosity) and could make LHC not useable for years!!! (crash program = long reaction time). In case converter redesign options are chosen, reaction time is around 4 years. Relocation options must accommodate cost increase if voltage drop exceeds rating of existing power converters.

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary WorldFIP and NanoFIP New generation of MicroFip from Alstom chips is much less tolerant to radiations CERN decided to buy the design from Alstom and start an insourcing effort: a rad-hard alternative to MicroFIP in FPGA technology [BE-CO, with participation from EN-STI, TE-CRG, TE-EPC, TE-MPE] The NanoFIP Project WorldFIP usage in the LHC: Over 450 km of cables More than nodes Used in many critical LHC subsystems: Cryo, QPS, Power Converters, BI, RF, RadMon NanoFIP project delayed due to LHC startup pressure (other FIP users could not provide help). Will get more priority in 2010 Strategic decision to be taken on MicroFIP3 (ASIC design) Needs strong collaboration with PH-ESE and clarification of responsibilities

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary 10 Review of exposed equipment Equipment inventory done by Priority [full list available in talk]: Priority 1: Personnel and Machine safety Priority 2: Long downtime Priority 3: Beam quality degradation Priority 4:Monitoring or no immediate impact on the machine In most cases a question of relocation and shielding, plus partial redesign Single Events Soft Errors (recoverable) Single Event Upset (SEU) Multiple Bit Upset (MBU) Single Event Transient (SET) Single Event functional Interrupt (SEFI) Hard Errors (non recoverable) Single Event Latch-up (SEL) Single Event Gate Rupture (SEGR) Single Event Burn-out (SEB) Total Dose Displacement damage Example : SEL

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary CNGS Test Facility- TSG4 side gallery Measured quantities: Dose (SiO2) Hadron >20 MeV fluence 1 MeV n eq. fluence 1 week ~ 1 e18 pot Hottest test area in TSG45: 1 week ~ 3 years (10Gy/y) in LHC arcs

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary 12 Irradiation tests Most of the equipments installed in LHC tunnel have been tested in CNGS. [ Equipment in critical areas need more dedicated tests ] In most cases solved by HW/FW modifications, shielding Cryo:ok, with soft reset and shielding BIC/PIC:ok, shielding and relocation BLM:ok BPM:ok with mitigation QPS:not ok, but with reset of WorldFIP CL heaters:not critical, shielding will help Survey:ok WorldFIP:development of NanoFIP Power Conv:some critical Other test facilities: PSI [p, 60/250 MeV], CEA [n], UCL [Heavy Ions], NRI [Thermal n], IRA [Co60]

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Remark on COTS and elements testing A request was mentioned to reinforce the section / service for testing COTS and components for all CERN users ? It could then provide: Optimization of the resources Larger effectiveness than having plenty of people trying to do it from their own Provide recommended components

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation constraints in ATLAS TID (10 years) 1 MGy (Pixels) 7 Gy (Cavern) NIEL (10 years) n.cm -2 (Pixels) n.cm -2 (Cavern) SEE (10 years) h > 20 MeV h.cm -2 (Pixels) h.cm -2 (Cavern) Simulated levels

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary ATLAS Radiation Tolerance Policy ATLAS introduced a formal policy on radiation tolerant electronics Defined tests procedures Defined procurement procedures (ASICs, COTS) To enforce it One person in charge with some executive power Strong support from the management Tutorial on radiation effects (also with RD49) Clear definition of the radiation tolerance criteria's Help for testing organisation (often with RD49) Specifically addressed during design reviews Data base of tested components: not a big success and proven to be difficult to maintain

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Long-term strategy [1] Strategy (comparable to ATLAS strategy): Environment must be known Need of at least: TID: Dose (Gray/year in silicon) NIEL: 1MeV eq. Neutron fluence. But Thermal neutrons ? SEU: >20 MeV fluence We need to specify a parameter for thermal neutrons Simulate critical areas Have a repository for the project Select components compatible with radiation level Designers shall have to select components compatible with the expected level of radiation Test procedures and reports adapted to the fluence/dose Tests need to be performed for every new batch While a central database may be established, this is not felt fundamental by users: It quickly gets obsolete… A central procurement of rad-tolerant components might be more useful

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Long-term strategy [2] Tests in similar environment as final, keep results For critical systems: design reviews Equipment critical for personnel safety and machine/experiment protection should not be installed underground if possible If not, they have to undergo a strict procedure of design review and test to ensure a minimum risk of failure. Systems responsible for relevant beam downtime should undergo design reviews as well. Monitoring: only on request of its owner Relocation, shielding but safe solution: Invest in infrastructure with new shafts and electronic cavern A workshop will be organized in May to consolidate the information It is necessary to invest substantial manpower in 2010 for integration studies

Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Conclusions Big efforts have been realized in: Simulation of dose and fluence Integration studies in LHC tunnel Shielding Relocation Testing Remain critical: US85/UJ76 risk with 1000 pb-1 Development of NanoFIP Complete strategy for Power Converters Still open questions: Implementation of a long-term strategy Civil engineering pits and caverns reference site