Mini-Coiled Tubing Technologies. GISpribor-M, CJSC and Pskovgeokabel, LLC designed a complex of ground equipment and a flexible steel-polymer pipe for.

Slides:



Advertisements
Similar presentations
Terminals & Connectors
Advertisements

Chapter 3: Steady uniform flow in open channels
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
TexChem Group International LLC
Magnesium Diboride Program Hyper Tech Research Inc. Mike Tomsic Magnesium Diboride Workshop April 2003 Research Partners: Ohio State University-LASM National.
Continuous Numerical Data
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
1 1  1 =.
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
By John Liedig & Jouline Nour
CONSTRUCTION AND REPAIR OF WELLS Steel Polymer Pipes, Flexible Drill Stems for Mini Coiled Tubing (application for underground repair of wells)
ACTIVE LEARNING PROCESS
S T A N D A R D S AS/NZS :1994 Specifications for rainwater goods, accessories and fasteners Part 1: Metal shape or sheet rainwater.
1 New build-up technique with copper bump AGP Process.
L 13 Fluids [2]: Statics  fluids at rest

TRADITION, POWER QUALITY , INNOVATION
Water Delivery Systems for Horticulture Production in West Africa
LINAC 4 Emittance Meter.
* Suspension Bearing * Roller Ball Bearings * Open, ZZ Or 2RS Bearings * Roller Bearing * Deep Groove Ball Bearings * Needle Bearing * Suspension & Idlers.
Industrial Boilers Steam generators Closed vessels made of steel and
Boilers.
Power Plant Engineering
BOILER TRAINING Mr. Customer – Site specific
Stresses due to fluid pressure in thin cylinders
1 © GDC Group Heat Solutions. Source; House Hold budget survey (2004/2005) Irish Heating Market.
USER MAINTENANCE.
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
Adding Up In Chunks.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
5/04/13 1 COMA Conference 2013 J.P. GAILLET © 2013 – Centre de Pyrolyse de Marienau – All rights reserved for all countries Cannot be disclosed, used or.
Electronics Cooling MPE 635 Mechanical Power Engineering Dept.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
Flat Flow by Kamila Součková 11. Task Fill a thin gap between two large transparent horizontal parallel plates with a liquid and make a little hole in.
ADVANTAGES Water savings Crop response Labour savings Fertilizer savings Less weed growth Drip Irrigation System Layout & Design.
Main Solutions For any inquiries please contact us at Tel: +1 (416) 548 – 5592 Fax: +1 (416) Oil & GasHoneycomb Tech.
Environmental Drilling By: Josh Humphreys October 8,2006.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
UNIT 16: Extrusion and Injection moulding Manufacturing Engineering Unit 16 Copyright © 2012 MDIS. All rights reserved. 1.
Pharos University ME 259 Fluid Mechanics for Electrical Students Revision for Mid-Term Exam Dr. A. Shibl.
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach.
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Scientific and production company “ALTERNATIVE TECHNOLOGIES”, CJSC Russia, Novosibirsk region, Koltsovo, 14 Tel./Fax: (383)
Drilling Rig URB-10-2SH property of. 2 “INNCOR” Company Presents multipurpose drilling rig “Buran” URB-10-2SH, for the first time designed by the method.
Devices and Equipment For Oil & gas and chemical industries. STC GEOSTAR, Russia PRESENTS.
Completing & Producing A Well
INTRODUCTION Definition:
Subsurface drainage – Investigations
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
City Gas Distribution: A Network Analysis
Hydraulic Fracturing or Fracking. Process -Drill horizontal line -Charges detonate blasting small holes in the shale -Pressurized fluids are pumped into.
Topic 8: Fluid Systems Mix and Flow of Matter. Topic 8: Fluid Systems Mix and Flow of Matter.
ARTIFICIAL LIFT METHODS
1 Capabilities of GC “Tekhnologiya metallov” enterprises.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Introduction to Well Completions
Profile Liner Technology for isolation of complicated zones while drilling.
Novomet. BOOSTER PUMPING SYSTEM.
DOWNHOLE EQUIPMENT FOR CONPLICATED CONDITIONS
Hydraulic Fracturing 101.
ILMASONIC-SCIENCE LLC
SUSTAINABLE DRILLING OF OIL & GAS WELLS
HYDROSTATIC DEVICE FOR
Chemical additive solutions to overcome challenges and create value
Presentation transcript:

Mini-Coiled Tubing Technologies

GISpribor-M, CJSC and Pskovgeokabel, LLC designed a complex of ground equipment and a flexible steel-polymer pipe for performing various downhole repair operations and surveys. The number of wells requiring major and maintenance overhaul has recently drastically risen, the well stock is rapidly getting older demanding new types of repair works in order to increase their capacity. At present, there is a great number of technologies necessitating both a hydraulic channel for supplying technological fluids and gases and a power cable for monitoring and researching processes in the wells. Pskovgeokabel produces a wide range of flexible steel-polymer pipes for performing these technological operations. Mini-Coiled Tubing Technologies

Flexible Steel-Polymer Pipe of Type TG-25/ Fig. 1 Flexible steel-polymer pipe 1 – pipe body (polyethylene or another polymer) 2 – lateral armoring (steel band of rectangular cross-section winded at a minimum lay length) 3 – longitudinal armoring (high-strength steel wires, counter-winded at a long lay length in two layers) 4 – logging cable Working pressures – internal/external - 25/20 MPa Testing – 150% working Breaking force – 140 kN Breaking force (flexible steel-polymer pipe)– jet– 80 kN Maximum temperature of transportation and storage from -40º up to +45ºС Maximum downhole working temperature – up to +80ºС

Technological Operations Using Special-Purpose Hoists with Flexible Steel-Polymer Pipes Well development, stimulation by gas compressor mixture; Washing hydrate blocks; Washing sand shale blocks; Jetting, bottom-hole cleaning; Remedial cementing, treatment of bottom-hole area (alkaline, acidic), water shutoff; Borehole cleaning after hydraulic fracturing; Running tools in horizontal areas of the well, geophysical well logging; Perforating-explosive operations.

1 – vehicle (chassis), 2 – drum, 3 – flexible pipe, 4 – drum drive, 5 – feed, 6 – feed drive, 7 – BOP equipment, 8 – X-mas tree, 9 – stopping plug, 10 – operator cabin with control system. Special-Purpose Hoists with Flexible Steel-Polymer Pipes

Technical characteristics: Capacity of winch drum, pipe dia. 38 mm 5000 m Capacity of winch drum, pipe dia. 44 mm 4200 m Capacity of winch drum, pipe dia. 50 mm 3100 m Maximum pulling force at two first winding layers of pipe on the drum 90 kN Dimensions in transit condition, m 11 х 4 х 2,5 Height to the axis of top roller on the mast in working condition 13 m Lifting capacity of the mast 10 t Hydraulic winch drive with planetary reducer integrated in the drum В настоящее время ЗАО «ГИСприбор-М» выпустил 3 подъемника с ГСПТ. Special-Purpose Hoists with Flexible Steel-Polymer Pipes

Manufacturing Special-Purpose Hoists with Flexible Steel-Polymer Pipes At the present time the hoists with the flexible steel-polymer pipes manufactured by GISpribor-M are being operated at the Russian deposits: PKS-5G-T with a hydraulic winch drive of a running in and pulling out device, with a mast, a flexible steel-polymer pipe 25/44-140, length 4100m (Novie Sibisrkie Tekhnologii LLC, Nefteyugansk)

PKS-3,5E with an electric winch drive and a crane, a flexible steel-polymer pipe 18/38-90, length 3,9 km (Nefteservis-NN LLC, Nizhny Novgorod) Manufacturing Special-Purpose Hoists with Flexible Steel-Polymer Pipes

The Special-purpose hoist PKS-5G with a pipe 18/38-90, length 2,4 km (TekhServis ZLT LLC, Novy Urengoy) Manufacturing Special-Purpose Hoists with Flexible Steel-Polymer Pipes

Well Development a ) Oil well No. 2319, oil field Priobskoye, PKS-5G with the flexible steel-polymer pipe, 44 mm (2011). Discharge line pressure 200 atm., pipe running in up to the depth of 2930 m, drainage 35m 3 (Novie Sibisrkie Tekhnologii LLC, Nefteyugansk) b) Flowing well development in Samara region, PKS-3,5E with the flexible steel-polymer pipe,38 mm. Well depth 3100 m, pipe running depth 2150 m, working pressure150 atm., drainage 65 m 3 (Nefteservis-NN LLC, Nizhny Novgorod) c) Well No. 37, gas-condensate field Zapadno-Tarkosolinskoye, PKS-5G with the flexible steel- polymer pipe, 39 mm (2009). Discharge line pressure 65 atm., pipe running depth up to 1500 m (TekhServis ZLT LLC, Novy Urengoy) b а c

Bottomhole Cleaning, Borehole Flushing a)Bottomhole cleaning of propant remains after hydraulic fracturing. PKS-3,5E with the flexible steel-polymer pipe 38 mm. Samara region, well depth 1800 m, pipe running depth 1795 m, discharge line pressure 200 atm. (Nefteservis-NN LLC) b) Bottomhole cleaning of injection well No. 1, gas-condensate field Yamsoveyskoye (2010). PKS-5G with the flexible steel-polymer pipe 39 mm, well depth1500 m, pipe running depth 1500 m (TekhServis ZLT LLC) аb

Removal of Hydrate and Asphaltene Deposits a)Borehole cleaning of paraffin deposits with the help of washing and cleaning nozzles. Samara region, PKS-3,5E with the flexible steel-polymer pipe 38 mm, well depth 3000 m, working line pressure 150 atm. (Nefteservis-NN LLC) b) Removal of hydrate deposits. Yamsoveyskoye field, well No.2, PKS-5G with the flexible steel-polymer pipe 39 mm, well depth 1500 m, hydrate deposits at the depth of 390 и 450 m, discharge line pressure 50 atm. (TekhServis ZLT LLC) а b

Water Removal From Gas Well Bottom-Holes a) Water removal from the bottom-hole of Komsomolskoye gas-well, PKS-5G with the flexible steel-polymer pipe 39 mm, water removal depth 950 m, pressure in the well 30 atm.(2009) (TekhServis ZLT LLC) b) Water removal (drawdown) in the injection well of Yamsoveyskoye gas-condensate field. PKS-5G with the flexible steel-polymer pipe 39 mm, water removal depth up to 1000 m, well depth1500 m, removed 30 m 3, line pressure 50 atm. (TekhServis ZLT LLC) c) Water removal from the water supply well of Zapadno-Tarkosolinskoye field, PKS-5G with the flexible steel-polymer pipe 39 mm, water removal depth 220 m, removed 60 m 3, line pressure 40 atm. (TekhServis ZLT LLC) а b c

Running Equipment into Horizontal Areas of the Wells а) Geophysical and hydrodynamic research of the horizontal area of the well No Severo Urengoyskoye gas field. PKS-5G with the flexible steel-polymer pipe 39 mm, well depth 1546 m, horizontal area 250 m, pressure in the well 30 atm. (2011) (TekhServis ZLT LLC, Novy Urengoy) b) Geophysical and hydrodynamic research of the injection oil well No PKS-5G-Т. Rigid logging cable 38 mm. Well depth 2375 m, length of the horizontal area 220 m, layer pressure163 atm. (Sovetskoye field (Tomskneft) аb

Thank You for Your Attention! Mini-Coiled Tubing Technologies