operational Command and control centrE in IDF

Slides:



Advertisements
Similar presentations
EIMS EXPECTATIONS FROM CROSS-ACCEPTANCE WORK CROSS-ACCEPTANCE SEMINAR 17 NOV PHILIPPE GALLEY-EIM/RFF.
Advertisements

CASES/e-Seniors Preliminary contacts Life begins at 50! Kick Off meeting CASES, Paris, 22nd & 23rd of November 2012.
Digital television as a backup warning system for the means of Civil Defense and Emergency Management.
TRACECA PROJECT EVALUATION TURKEY. DGCA TURKEY PROJECT PROJECT NAME: Establishing Passenger Right Information Center in Istanbul Atatürk Airport.
Make a list of words in French that are associated with TRAVEL.
XXIII RESER CONFERENCE Aix-en-Provence FRANCE 2013.
SNCF Infra | juin EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
1 Microcredit in France: Adie’s experience Milano, october 15th 2013.
IRSC DUBLIN OCTOBER 2006 vue n°1 INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL.
THE VAL D’OISE - PARIS REGION – FRANCE. The Val d’Oise : a strategic place in Europe VAL D’OISE ECONOMIC EXPANSION COMMITTEE (CEEVO) MAKE YOUR FUTURE.
1 NAT accessibilité  New rolling stock in Ile de France  Regional Structuring Bus Network RIR  Extended provision: night services  New services tramway.
Urban Transport Benchmarking Initiative Paris and the Urban Transport Benchmarking Initiative Isabelle Bachmann- RATP- Paris.
What we know so far about the Paris Basin.....
EurailSpeed milano 2005 Which market for high speed rail ? - The experience of Paris-Charles de Gaulle airport Jean Marie Chevallier Director of Airport.
Bus signal priority: effets on quality of service and necessary condition on conceiving a system of this kind Jean-Jacques HENRY - ITSJU Zhengyi LIN –
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
This meeting is possible with the support of : 9-11 October October 2008 in Saint-Etienne, FRANCE Information : Dr Claude LAMBERT, Immunology.
FEMA Region IX RRCC Watch Center August RRCC Watch Center * Oakland, CA * August Mission  The Regional Response Coordination.
PRESENTATION ON URBAN TRANSPORT PLANNING AND DESIGN IN PAKISTAN
« Aerospace in Ile-de-France ». The Ile-de-France region 11 millions inhabitants Regional GDP : 430 billions euros companies – R&D (40% french.
Dark Light Dark Light Accent Accent Accent Accent
Transports in Paris current, Past, and future. Past, current and future transports in Paris 2 Outline Outline : I/ Yesterday : a history of the underground.
FROM KUALA LUMPUR TO LYON. 7th UN/CEFACT FORUM PLACE: LYON FRANCE DATE: 26 to 30 SEPTEMBER 2005 Lyon Paris Geneva.
Chair of Municipal hygiene and occupational health. Lecture on municipal hygiene for 5 courses Role and value of a street network in city planning.
1 sanofi-aventis R&D Bagneux Research Center 31 avenue Paul Vaillant Couturier Bagneux France Access And Transportation.
Eurostar Train By: S. Ray. Eurostar is a high-speed railway service connecting London with Paris and Brussels. All its trains traverse the Channel Tunnel.
9618/PLT/EUR/318-05Page 1 Edition 1 High Speed Regional Services High Speed Regional Services: a new market? by Jean-Pierre ORSI, director Europe SYSTRA.
Clean Cities / 1 COALITION NAME Clean Cities Program Overview Presenter Title Date.
October 2007 IRSC, Goa (India) 1 Lessons from an accident Marion Segretain, French National Safety Authority (EPSF)
Airport Systems Planning & Design / RdN Airport and Airline Access Dr. Richard de Neufville Professor of Systems Engineering and Civil and Environmental.
CMA-CGM Trying to Make a Success Story in the Dynamic HKG & S.China Market HKTDC Marseille 28 Octobre 2004.
Public Transports to Ceremony and Party RER Line E Paris Ceremony Le Raincy Cityhall „Mairie“ Party Nogent sur Marne Change Station from ceremony to party.
Société du Grand Paris Journées Ile-de-France Europe 2015, 7 e édition 21th october, Bruxelles Julien SENEZE, CFO 1.
PARIS I can talk about Paris. Comparing Paris to Chicago Look at the following pictures. Describe each city and compare them.
Ministère de l'Écologie, du Développement durable et de l’Énergie The French National Projet : Using WIM for direct enforcement.
Module 7 EMS Operations. Phases of a Response Air Medical Consideration Mass Casualty Incidents Fundamentals of Extrication Hazardous Materials.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
How to get to Claude Bernard?
1 COMBINED TRANSPORT A brief view on the UIRR scrl Bratislava Intermodal Transport Conference 18/ Rudy COLLE Director General.
Not to be reproduced or circulated without the permission of SNCF or La Poste HIGH SPEED FREIGHT SERVICES IN FRANCE AND EUROPE UIC – SIAFI Europe Seminar.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Cliquez pour modifier le style du titre 43 RD ASECAP STUDY & INFORMATION DAYS Investing in the future mobility across Europe : building, managing and connecting.
Round table CREATING SUCCESSFUL PUBLIC-PRIVATE PARTNERSHIPS June 13, 2007 Federal City Council, Washington D.C. Mr. Boyko Borissov Mayor of Sofia Opportunities.
YAHOO TECHNICAL SUPPORT SERVICE Welcome to you.
Urban gondolas in Ile-de-France: forecasting traffic on a new mode
PAI Paris Gare de Lyon PrEsentation Of the PROJECT 20/06/2017
High Speed Rail Some Development Principles
PAI Paris Gare de Lyon PrEsentation Of the PROJECT 20/06/2017
One-Stop Guidance Centres as part of Youth Guarantee in Finland
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
European Rail Infrastructure Managers
CIRCULATION OF TRAM-TRAINS
Vice President: Lin Zhonghong Economic & Planning Research Institute
Meeting of Project Group Planning the Road Network
How to get to HOTELS and PARIS from Airports
Transportation Summit
COMBINED TRANSPORT A brief view on the UIRR scrl
IRSC 2017 Hong-Kong.
SAE / TETWoG May 2018 – Safran ae villaroche (paris)
PAI Paris Gare de Lyon PrEsentation Of the PROJECT 20/06/2017
Transportation Management Plan Modernization Project
CONSTRUCTION DU CERCLE CIRCONSCRIT D ’UN TRIANGLE
Premium Success Story Métro de Lyon - France
High Speed Stations, intermodality and services by Pascal LUPO SNCF Stations Director Milan - Eurailspeed 2005.
Moving India forward Urban Infrastructure: Challenges & Policy Options for Low Carbon Mobility Amit Bhatt, Director, Integrated Transport.
Transportation: Policy, Strategy & Investments
North Suburban Planning Council
By Jonathan C. Mba ACE Coordinator
Presentation transcript:

operational Command and control centrE in IDF OCCC operational Command and control centrE in IDF Visite IRSE FS – Saint Denis - 18 October 2016 I’m very happy to welcome you in our offices CCR

OCCC : prospects in IdF « Ile de France »: Mass Transit area project : OCCC RER B I suggest an intervention in 3 phases: First : make a presentation of Idf Second : make a presentation of PARM / RERB And : make a presentation of EOLE For the project of RER B, I suggest to project some concepts of operations.

« Ile de France » Mass Transit AREA

Approximatly 40%of traffic railways IDF 2% of area 20% of population Approximatly 40%of traffic railways Approximatly 4 Millions passengers per day.

4 TGV lines and many regional or national lines IDF components 4 TGV lines and many regional or national lines Important FRET line : « Grande Ceinture » Junctions with customers, shunting yard and « ports de Paris » Many important works on the network volume of works increase by 4 between 2008 and 2020 The most important operator: Transilien 60% of traffic trains – 5 RER et 8 suburbs lines – 4 millions passengers each day

IDF traffic organisation 5 Control Offices et 250 signal boxes( with different technologies) control 8000 trains each day. 250 signalboxes wiothe oldest dates from 1931

IdF : mass transit area but some limits Old network with many technical problems: For example, catenary of RER C dates from 1930 Some congested sections on the network : RER B/D : 32 trains per hour and per direction between gare du Nord and Châtelet Traffic rules, tools ans systems are not specific to mass transit: For example : GALITE: train tracking system is not compatible (lack of precision) Organisation decentralized: SNCF Network staff (signal man, train dispatchers and electrical dispartchers) and SNCF Transporter aren’t in the same room

project OCCC PARM

With RATP, SNCF TN and SNCF Network RER B built on a major route with 3 actors (each with its own responsabilities) but in a single command Center SNCF perimeter Shared network 7 signal boxes 1 CSS 25kV Each day : 840 trains including RER B: 490 Line K : 30 TER : 26 FRET (All operators) : 280 SNCF Network : 14 RATP perimeter Dedicated network 1 CSS 1.5 kV RER B is an important route. Approximatly Seven hundred thousand passengers per day. 4 important sites : 3 airports : Roissy, Le Bourget and Orly stade de France : 150 events each year (6 nations tournament) internationnal congress centre (COP 21) In blue : dedicated line RERB with suitable passengers dock and specific signals RER B is running on its own truck in nominal or slightly disturbed situation. When there is an pb, it’spossible to switch the train on the other track. This situation is reversible Bourg La Reine Robinson Single Command Center With RATP, SNCF TN and SNCF Network Massy Palaiseau Saint Rémi Les Chevreuses

OCCC PARM AIMS OF PROJECT FEDERATE THE OPERATING STAFF WITH COMMON TARGET MAKE DURABLE AND IMPROVE THE QUALITY OF SERVICE As an extension of our projects carried out during last years : New services with network fitted « RER B+ » Arranging new line staff RATP/SNCF-RFF Unifying in OCCC with staff of PCC RATP, Operational Center of TN and trafic operation Regarding that the creation of new infrastructure in Le Bourget and Stade de France stations will allow trains flipping in degraded mode

OCCC PARM Le secteur sous sa forme actuelle Train controller Signalman Poste Y Aig Le secteur sous sa forme actuelle Roissy 1 AC Mitry 5 AC Aulnay 1 AC Aig Bourget 1 + 2 + 3 AC Aig Paris 8 AC Aig Paris 1B AC CCL CCL AC Train controller Aig Signalman

OCCC PARM March 2017 August 2017 August 2018 PCD Saint Denis Poste Y Aig AC Roissy 1 AC Mitry 5 AC CCL Adj PCD Saint Denis Aulnay 1 Aig AC Bourget 1 + 2 + 3 AC Aig Zone du Bourget Triage: Le projet de régénération des postes par des postes de commande locale type PAI2006 pour les voies de circulation, PRS (poste A et B) et PEI PMV est différé à une date non connue Dimmensionnement Rang 1 + 1 et rang 2 + 1 par rapport précédente présentation Paris 8 AC Aig Territorial limit RATP / RFN Paris 1B AC AC CCL AC CCL DCF IDF

Le bâtiment

OCCC PARM From now on. First step Then : Second step Operating 7 signal boxes by remote control Including customers information First step is a technical operation with 3 moments When we transfer the signal boxes to St Denis, it will be necessary to stop trafic. Then : Second step How bring staff from RATP and SNCF together?

Thank you for your attention I’m very happy to welcome you in our offices CCR