Present and Future test facilities for High-intensity Targetry CERN

Slides:



Advertisements
Similar presentations
Possible Layout for a Proton-Driven Plasma Acceleration Experiment at CERN R. Assmann, CERN PPA Many thanks to I. Efthymioupolos and F.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
SPL Integration Layout Impact on cryo and vacuum sectorisation ◊ Underground obstacles, constraints on slope and length of the SPL ◊ Continuous cryostat.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
J. Lettry A. Fabich 10th December INTC statement DRAFT The authors of this letter of intent propose to perform proof-of-principle tests of a high-power.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
WP5: – STATUS REPORT EUCARD Steering Committee Meeting INFN-Frascati, November 4-5, 2009 Outline  HiRadMat – overview/reminder  Project.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
MERcury Intense Experiment Experiment Layout
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
CERN Neutrino Project 26th November, 2013 M.Nessi.
High Radiation to Materials HiRadMat Project : Construction, Installation & Operation of the facility Reminder : brief overview of the facility News.
Proton throughput in the LHC Injectors Upgrade (LIU) era
Status of the beta-beam study
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Acknowledgments: LIU-PT members and deputies, H. Bartosik
EN-CV interventions during EYETS for PS and PSB
nuSTORM and the Physics Beyond Colliders workshop
Alexander Herlert, CERN (PH-SME-IS)
Michael Benedikt AB/OP
CNGS Proton Beam: Introduction
Superbeams with SPL at CERN
Revival of the cern ps neutrino beam
Elias Métral for the BLRWG ( min, 21 slides)
CSP Meeting CERN CERN Accelerators in th November 2010
Sites Indoor (37 Swisscom sites + 17 CERN sites) LHC: Transfer lines :
Progress towards Pulsed Multi-MW CERN Proton Drivers
2003 test beam with 25 ns bunched muons
HiRadMat Test Facility
SLHC-PP kick-off meeting, CERN 9 April 2008
How to control the local beam density
Experimental Areas – LS2 planning
Beam Line to the HiRadMat Test Facility
The SPL-based Proton Driver at CERN
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

Present and Future test facilities for High-intensity Targetry Experiments @ CERN Outline Present possibilities Test facilities in the near future Far future possibilities I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg Targetry Workshop Princeton, November 6, 2008

Present possibilities ISOLDE target area Beam momentum: 1 ÷ 1.4GeV/c ; from PSB Maximum intensity : 30×1012 protons, 230ns pulse length Experiments: targetry experiments: THROUGH - THIMBLE, also using Hg significant target development program each year for the ISOLDE users for RIB beams Future: The facility is operational and always available Tests should be coordinated with the ISOLDE physics program and must get the proper approval (committees, safety, etc.) They should also respect the constraints of the existing system weight, size, radioactive environment, etc. HIE-ISOLDE is under design, with the development of several kW targets coupled to LINAC-4 and upgraded PSB operation Could a test target station be envisaged somewhere in the new design for tests? Y. Kadi (CERN/ATB) is the right person to contact… I.Efthymiopoulos, CERN

Present possibilities ISOLDE target area Courtesy : J. Lettry, CERN I.Efthymiopoulos, CERN

Present possibilities FTN/n-TOF line Beam momentum: 14÷ 24 GeV/c, from PS Maximum Intensity : 30×1012 protons, variable pulse length and bunch spacing Experiments : MERIT; installed and completed in 2007 Future : Unavailable due to nTOF operation I.Efthymiopoulos, CERN

Present possibilities Other? PS – East Area There is a semi-fast extraction to an IRRADIATION facility 1-4-8 bunches @ 14 GeV/c for a total intensity <5×1011 p Re-use some of the old tunnels attached to PS TT7 tunnel: old neutrino target area AD-loop : anti-proton ring In both cases a complete rebuilt of the line is required Magnets (available?), power supplies, instrumentation Needs detailed evaluation study (I.E + R. Steerenberg) Would also need some “political” support from the management I.Efthymiopoulos, CERN

Present possibilities TT7 & Anti-Proton Loop tunnels Anti-proton loop TT7 tunnel may not be fully compatible with LINAC4/SPL layout PS Booster PS I.Efthymiopoulos, CERN

Future test facilities for High-intensity Targetry Experiments @ CERN Outline Present possibilities Test facilities in the near future Far future possibilities I.Efthymiopoulos, CERN

Test facilities in the near future HIRADMAT A test facility under study for material irradiation (collimators) under LHC beam conditions Attached to SPS TI2 extraction line ; old WANF target area Beam parameters: Beam momentum: 450 GeV/c could it go down to SPS injection energy (~30 GeV/c???) Bunch intensity: 5.0×109 ÷ 1.15×1011 ; 1 ÷ 288 bunches, 25ns apart Pulse energy 2.4MJ; length ~7us; 1mm2 beam size at the target Design ongoing; expected to be available for “external” users by November 2010 Part of EU funded program for “open access” I.Efthymiopoulos, CERN

Test facilities in the near future HIRADMAT Test facility (under study) in old WANF tunnel TI2 tunnel to LHC TT61 tunnel to West Area (empty now) Beam from SPS Test area ~10m long Nearby tunnel for proximity equipment I.Efthymiopoulos, CERN

Future test facilities for High-intensity Targetry Experiments @ CERN Outline Present possibilities Test facilities in the near future Far future possibilities I.Efthymiopoulos, CERN

Far future possibilities PS2 experimental areas Experimental areas for the new PS2 machine (> 2016?) Underground caverns: high-intensity fixed target or rare decay experiment High-intensity irradiation + {targetry + n-front-end} facility Beam parameters: Preliminary I.Efthymiopoulos, CERN

Far future possibilities PS2 machine layout PS2 machine ~surface exp. areas SPS ring PS2 machine Underground exp. areas PS2 machine LHC ring I.Efthymiopoulos, CERN