Chapter 3 – Project Management

Slides:



Advertisements
Similar presentations
© Wiley 2010 Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Advertisements

© Wiley 2007 Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 3 rd Edition © Wiley 2005 PowerPoint Presentation by.
Chapter 16 – Project Management
WBS: Lowest level OBS: Lowest level
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling: PERT-CPM
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Introduction to Management Science
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
CHAPTER 17 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
pert and cpm ch 9 Learning objectives:
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
MGMT 483 Week 8 Scheduling.
1 Operations Management Lesson 5 Project Management.
Chapter 16 – Project Management
Project Management. Maintenance and Reliability 14 Aug 2001.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Project Management © Wiley 2007.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
PROJECT MANAGEMENT Approaches
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Project Scheduling: networks, duration estimation, and critical path
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Presentation transcript:

Chapter 3 – Project Management Operations Management

Project Management Applications What is a project? Any unique endeavor with specific objectives With multiple activities With defined precedent relationships With a specific time period for completion Examples? A major event like a wedding Any construction project Designing a political campaign

Project Life Cycle Conception: identify the need Feasibility analysis or study: costs benefits, and risks Planning: who, how long, what to do? Execution: doing the project Termination: ending the project

Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries of science & engineering (tasks’ duration = probabilistic) Critical Path Method (CPM): Developed to coordinate maintenance projects in the chemical industry A complex undertaking, but individual tasks are routine (tasks’ duration = deterministic)

Both PERT and CPM Graphically display the precedence relationships & sequence of activities Estimate the project’s duration Identify critical activities that cannot be delayed without delaying the project Estimate the amount of slack associated with non-critical activities

Step 1-Define the Project: Cables By Us is bringing a new product on line to be manufactured in their current facility in some existing space. The owners have identified 11 activities and their precedence relationships. Develop an AON for the project.

Step 2- Diagram the Network for Cables By Us

Step 3 (a)- Add Deterministic Time Estimates and Connected Paths

Step 3 (a) (Continued): Calculate the Path Completion Times The longest path (ABDEGIJK) limits the project’s duration (project cannot finish in less time than its longest path) ABDEGIJK is the project’s critical path

Some Network Definitions All activities on the critical path have zero slack Slack defines how long non-critical activities can be delayed without delaying the project Slack = the activity’s late finish minus its early finish (or its late start minus its early start) Earliest Start (ES) = the earliest finish of the immediately preceding activity Earliest Finish (EF) = is the ES plus the activity time Latest Start (LS) and Latest Finish (LF) = the latest an activity can start (LS) or finish (LF) without delaying the project completion

ES, EF Network

LS, LF Network

Calculating Slack

Revisiting Cables By Us Using Probabilistic Time Estimates

Using Beta Probability Distribution to Calculate Expected Time Durations A typical beta distribution is shown below, note that it has definite end points The expected time for finishing each activity is a weighted average

Calculating Expected Task Times

Network Diagram with Expected Activity Times

Estimated Path Durations through the Network ABDEGIJK is the expected critical path & the project has an expected duration of 44.83 weeks

Adding ES and EF to Network

Adding LS and LF to Network

Estimating the Probability of Completion Dates Using probabilistic time estimates offers the advantage of predicting the probability of project completion dates We have already calculated the expected time for each activity by making three time estimates Now we need to calculate the variance for each activity The variance of the beta probability distribution is: where p=pessimistic activity time estimate o=optimistic activity time estimate

Project Activity Variance Optimistic Most Likely Pessimistic Variance A 2 4 6 0.44 B 3 7 10 1.36 C 5 0.25 D 9 0.69 E 12 16 20 1.78 F 8 1.00 G 0.00 H 0.11 I J K

Variances of Each Path through the Network Path Number Activities on Path Path Variance (weeks) 1 A,B,D,E,G,H,J,k 4.82 2 A,B,D,E,G,I,J,K 4.96 3 A,C,F,G,H,J,K 2.24 4 A,C,F,G,I,J,K 2.38

Calculating the Probability of Completing the Project in Less Than a Specified Time When you know: The expected completion time Its variance You can calculate the probability of completing the project in “X” weeks with the following formula: Where DT = the specified completion date EFPath = the expected completion time of the path

Probability of Completion Example: Calculating the probability of finishing the project in 48 weeks Use the z values in Appendix B to determine probabilities e.g. probability for path 1 is Path Number Activities on Path Path Variance (weeks) z-value Probability of Completion 1 A,B,D,E,G,H,J,k 4.82 1.5216 0.9357 2 A,B,D,E,G,I,J,K 4.96 1.4215 0.9222 3 A,C,F,G,H,J,K 2.24 16.5898 1.000 4 A,C,F,G,I,J,K 2.38 15.9847

Reducing Project Completion Time Project completion times may need to be shortened because Different deadlines Penalty clauses Need to put resources on a new project Promised completion dates Reduced project completion time is “crashing”

Reducing Project Completion Time - continued Crashing a project needs to balance Shorten a project duration Cost to shorten the project duration Crashing a project requires you to know Crash time of each activity Crash cost of each activity Crash cost/duration = (crash cost-normal cost)/(normal time – crash time)

Reducing the Time of a Project (crashing) Activity Normal Time (wk) Normal Cost ($) Crash Time Crash Cost ($) Max. weeks of reduction Reduce cost per week A 4 8,000 3 11,000 1 3,000 B 6 30,000 5 35,000 5,000 C 6,000 D 24,000 28,000 2 2,000 E 14 60,000 12 72,000 F 6,500 1500 G H 4,000 I 1,000 J 6,400 1,200 K

Crashing Example: Suppose the Cables By Us project manager wants to reduce the new product project from 41 to 36 weeks. Crashing Costs are considered to be linear Look to crash activities on the critical path Crash the least expensive activities on the critical path first (based on cost per week) Crash activity I from 3 weeks to 2 weeks $1000 Crash activity J from 4 weeks to 2 weeks $2400 Crash activity D from 6 weeks to 4 weeks $4000 Recommend Crash Cost $7400 Question: Will crashing 5 weeks return more in benefits than it costs?