Oct. 2018 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Input for coexistence document discussion]

Slides:



Advertisements
Similar presentations
Submission Title: [Add name of submission]
Advertisements

June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Discussion on Suitable Parameters for SCHC]
doc.: IEEE <doc#>
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 3 August 2017 Telco] Date Submitted:
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Connectivity] Date.
June 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 22. June 2017 Telco] Date Submitted:
August 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 8 August 2018 Telco] Date.
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w September 2018 Closing Report]
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 3 August 2017 Telco] Date Submitted:
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid with LPWAN Extension] Date Submitted:
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for Recommendation to WG 15]
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 8 August 2018 Telco] Date.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Candidate IEEE Standards and Technologies.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Candidate IEEE Standards and Technologies.
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w July 2018 Closing Report] Date.
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [LPWA – Regulator Issues] Date Submitted:
doc.: IEEE <doc#>
<month year> doc.: IEEE <xyz> January 2001
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Information on IEEE IG LPWA to ETSI.
< Sept > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Draft Call for Contributions]
December 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 08 January 2019 Telco]
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w November 2018 Closing Report]
Feb Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 22. Feb Telco] Date Submitted:
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Implementation Approaches for LPWAN Extension]
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA November 2016 Closing Report]
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report September 2017.
October 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 17 October 2018 Telco]
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA March 2017 Closing Report] Date Submitted:
June 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 22. June 2017 Telco] Date Submitted:
<month year> <doc.: IEEE doc> March 2015
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w January Closing Report] Date.
Submission Title: Validation and Verification Task Force Proposal
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
Submission Title: [Frame and packet structure in ]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Update on ETSI LTN] Date Submitted: [9 July,
June 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Joerg Robert] Date Submitted: [22 June, 2017”
doc.: IEEE <doc#>
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ETSI LTN Activities] Date Submitted: [12.
February 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 08 January 2019 Telco]
<month year> <doc.: IEEE doc> March 2015
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w January 2019 Closing Report]
April 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 11. Apr Telco] Date Submitted:
doc.: IEEE <doc#1>
< Oct > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Draft Call for Contributions]
Submission Title: [Proposed Resolution for FSK/GFSK Prior Comments]
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA January 2017 Closing Report] Date.
June, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [OFDM PHY Mode Representation] Date Submitted:
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w May 2019 Closing Report] Date.
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report July 2017 Plenary]
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report November 2017 Plenary]
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
Doc.: IEEE Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Summary.
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Channel bandwidth observations] Date Submitted:
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for modulation quality in split mode]
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w July 2019 Closing Report] Date.
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w July 2019 Closing Report] Date.
Submission Title: TG9ma Agenda for September Meeting
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 02 August 2019 CRG Telco]
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comments on Rejected MBS Comments in LB 155]
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 19 August 2019 CRG Telco]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Connectivity] Date.
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w September 2019 Closing Report]
12/15/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [AWGN Simulation Results] Date Submitted:
Presentation transcript:

Oct. 2018 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Input for coexistence document discussion] Date Submitted: [16 Oct, 2018] Source: [Joerg ROBERT] Company [Friedrich-Alexander University Erlangen-Nuernberg] Address [Am Wolfsmantel 33, 91058 Erlangen, Germany] Voice:[+49 9131 8525373], FAX: [+49 9131 8525102], E-Mail:[joerg.robert@fau.de] Re: [] Abstract: [This document shall give guidance during the coexistence assurance document discussions] Purpose: [Discussion within TG4w telephone conference call.] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Joerg ROBERT, FAU Erlangen-Nuernberg

Input for Coexistence Assurance Document Discussions Oct. 2018 Input for Coexistence Assurance Document Discussions Joerg Robert (FAU Erlangen-Nuernberg) Joerg ROBERT, FAU Erlangen-Nuernberg

Oct. 2018 Motivation The TG4w draft specification has to be accompanied by a coexistence assurance document that show the effect of 4w on existing IEEE standards in the relevant frequency bands This document shall be the basis for the discussion what the coexistence assurance document has to include Joerg ROBERT, FAU Erlangen-Nuernberg

Existing Coexistence Assurance Docs. Oct. 2018 Existing Coexistence Assurance Docs. General guidance is given by 802.19: https://mentor.ieee.org/802.19/dcn/09/19-09-0001-00-0000-writing-a-ca-document.ppt Existing documents 802.15.4g: DCN 15-10/668r5 802.15.4k: DCN 15-12/314r1 802.15.4q: DCN 15-14/709r0 802.15.4u: DCN 15-16/286r0 802.15.4v: DCN 15-16/569r0 Joerg ROBERT, FAU Erlangen-Nuernberg

How to Create the Document ( I / II ) Oct. 2018 How to Create the Document ( I / II ) Proposal: Use the 802.15.4k coexistence document as template as we are defining an amendment to the 802.15.4k FSK PHY Coexistence work with 802.15.4 may be very limited, as all PHYs have already been verified against 4k Only missing system is 4q, but its coexistence document already contains all required information and can be referenced Question: Is this a feasible approach? Joerg ROBERT, FAU Erlangen-Nuernberg

How to Create the Document ( II / II ) Oct. 2018 How to Create the Document ( II / II ) The 802.15.4k does coexistence document does not contain any work wrt. IEEE 802.11ah, which did not exist when 4k was developed New simulation results against 11ah are most likely required Joerg ROBERT, FAU Erlangen-Nuernberg

Simulations Against 802.11ah Oct. 2018 Simulations Against 802.11ah Proposal: Use MCS modes currently under discussion in 802.19 sub-GHz SG Limit parameter sets to worst case scenarios in order to save time Questions: What are worst case parameter sets? What kind of propagation models should we use? What about coding an channel estimation? Who can do the work? Joerg ROBERT, FAU Erlangen-Nuernberg

Oct. 2018 Proposed Next Steps After agreeing on content Joerg will create a skeleton document Using this document the 802.19 will be contacted for guidance In the meantime the required simulation results will be created Joerg ROBERT, FAU Erlangen-Nuernberg

Thank You for Your Interest! Oct. 2018 Thank You for Your Interest! Joerg ROBERT, FAU Erlangen-Nuernberg