A Brief History of CM in the Nuclear Industry and the CMBG

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

INPO Update CMBG Meeting June 2013
A Brief History of CM in the Nuclear Industry and the CMBG
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
1. 2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead.
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
1 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Configuration Management Activities, Including Margin Management David Hembree INPO June.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Deployment of a Margin Model at Comanche Peak Presented.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
1 CMBG History Presented By: John Parler CMBG Steering Committee.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
Welcome to Charlotte 17th Annual Configuration Management Benchmarking Group Conference CMBG XVII Charlotte, NC June 20-23, 2010.
10th Configuration Management Benchmarking Conference June 15-18, 2003 Hershey, PA 2003 CONFERENCE " A Decade of Sharing" NEI Business Update Presented.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
10th Configuration Management Benchmarking Conference June 15-18, 2003 Hershey, PA 2003 CONFERENCE " A Decade of Sharing" CMBG History Presented By: Mike.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG CMBG History Presented By: Mike Stout CMBG Steering.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
A Brief History of CM in the Nuclear Industry and the CMBG Presented By: John Parler CMBG Steering Committee June 25, 2012 Chicago, Illinois.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
2006 CMBG Conference CMBG History Presented By: Rick Harris CMBG Steering Committee.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
2007 CMBG Conference A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Rick Harris CMBG Steering Committee June 17-20, 2007 Charleston,
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
Evaluating Configuration Management
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Standard Design Process Overview
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
CMBG History Configuration Management Benchmarking Group ( Rick Harris CMBG Steering Committee Chairman 7th Annual CMBG Conference Hosted.
A Brief History of CM in the Nuclear Industry
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
A Brief History of CM in the Nuclear Industry and the CMBG
Industry Guidance on Part 21 Evaluation and Reporting
Configuration Management Benchmarking Group (www. cmbg
Presented By: Mike Stout – PPL Glenn Neises - INPO
NRC Cyber Security Regulatory Overview
Configuration Control and the Standard Nuclear Performance Model
Current Configuration Management Inspection Issues
How to Manage Guidance from Multiple Organizations into CM
Regulatory Oversight of HOF in Finland
BREAKOUT 4: Vendor Technical Information
Configuration Management Fundamentals including Margin Management
Configuration Management Fundamentals
Guidance on the New 10CFR50.59 Rule
CMBG Steering Committee
TRTR Briefing September 2013
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Workshop 1: Processing Facility Configuration Information
RESOLUTION OF GENERIC SAFETY ISSUE 191
Vendor Technical Information
Design and Operating Margins Model
BWROG – Emergency Procedures and Severe Accident Guidelines (EPG/SAG) Revision 4 Highlights Ken Klass (Talen Energy), Lesa Hill (Southern Nuclear) & Phillip.
Presentation transcript:

A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Sam Melton CMBG Steering Committee June 2, 2008 Shell Beach, California Previous CMBG conferences - two presentations CMBG History CM Fundamentals (CM-101) Try something different Brief History of Nuclear Configuration Management in the US CMBG’s role in that history CM documents CM Fundamentals Workshop

A Brief History of CM in the Nuclear Industry Configuration Management in military and aerospace industry geared towards product conformance to facilitate interchangeability of parts while still satisfying the overall design requirements MIL-STD-973 (1992), ”Configuration Management” (later replaced by ANSI/EIA-649-1998)

A Brief History of CM in the Nuclear Industry DOE STD 1073-93 “Configuration Management” Applicable to DOE nuclear facilities in the operational phase. DOE-STD-1073 was updated in 2003 Early model for nuclear CM

A Brief History of CM in the Nuclear Industry Nuclear plants in mid 60’s to early 80’s typically designed by AEs under contract Final design documents typically turned over to the utility at the end of construction Little knowledge transfer of design info to utility engineering organization Utilities struggled to deal with long term design maintenance and related document upkeep

A Brief History of CM in the Nuclear Industry Early indicators that the nuclear plant design basis knowledge was becoming disconnected from the physical plant IE Bulletin 79-14 uncovered calculation discrepancies undocumented modifications document discrepancies as-built problems

A Brief History of CM in the Nuclear Industry Salem ATWS event (1983) Generic implications identified in NUREG-1000 and NRC Generic Letter 83-28 compliance with vendor recommendations part and procurement issues vendor manual controls Industry initiatives by INPO, NUMARC and EPRI to provide guidance and consistency

A Brief History of CM in the Nuclear Industry Davis Besse Loss of Feedwater event (1985) Led to NRC Safety System Functional Inspections (SSFIs) and NUREG-1154 difficulties maintaining operational readiness of safety systems lack of understanding design bases Voluntary design basis reconstitution, DBDs and self- evaluation NUREG-1397, NUMARC 90-012, INPO 87-006 and NUREG/CR-5147

A Brief History of CM in the Nuclear Industry Browns Ferry (1985) Browns Ferry fire in Unit 1 (1975) led to changes in NRC standards for Fire Protection All three Browns Ferry units shut down voluntarily in March 1985 due to CM related problems - containment isolation testing (Unit 1), reactor water level instrumentation (Unit 2) Unit 1 restarted in May 2007

A Brief History of CM in the Nuclear Industry NRC specialized SSFIs for safety systems Electrical Systems (EDSFI) Service Water Systems (SWOPI) SECY-92-193: intent to issue generic letter to require utilities to address how they were dealing with the problems - withdrawn

A Brief History of CM in the Nuclear Industry Nuclear Information and Records Management Association (NIRMA) CM Committee developed solution control of technical information by engineering and operations personnel mature records management and document control process PP02-1994 “Position Paper on Configuration Management Program”

A Brief History of CM in the Nuclear Industry First Nuclear CM benchmarking conference hosted by PPL in Fall 1994 17 US utilities represented Each utility made presentation about their CM program No motivational speeches No sales promotions by service providers

The CMBG Idea Grows Second conference hosted by Ontario Hydro in 1995 Drafted plans for continuing organization - approved in 1996 Adopted name: Configuration Management Benchmarking Group Formed Steering Committee Wrote Mission Statement “…forum for peer-level information sharing…” Defined ground rules for holding future conferences

CMBG is not affiliated with any other single organization Independent of regulatory and oversight agencies Conference costs are paid by registration fees and supplemented by host utility Host utility pays for web site Activities limited to information exchange

CMBG accomplishments Annual Conferences Participation in development of industry documents Web Site (www.cmbg.org) CMBG history Conferences (future conferences and proceedings from previous conferences) Steering Committee IAEA Activities CM Links Papers and publications Contact Database

CMBG Conferences Year Host Location 1994 PP&L Poconos, PA 1995 Ontario Hydro Ontario, Canada 1996 Houston Lighting & Power Galveston, TX 1997 Commonwealth Edison Chicago, IL 1998 NAESCO Boston, MA 1999 Duke Power Charlotte, NC 2000 Consolidated Edison Tarrytown, NY 2001 Progress Energy Raleigh, NC 2002 PSEG Nuclear Atlantic City, NJ 2003 PPL Susquehanna Hershey, PA 2004 Wolf Creek Nuclear Kansas City, KS 2005 First Energy Cleveland, OH 2006 Dominion Richmond, VA 2007 SCE&G Charleston, SC 2008 Pacific Gas and Electric Shell Beach, CA

A Brief History of CM in the Nuclear Industry NIRMA TG19-1996 “ Configuration Management of Nuclear Facilities” Built on the NIRMA PP-02 document Presented elements and attributes that facilities needed to establish of a good CM program. Later became basis for ANSI/NIRMA CM-1.0-2000 Criteria Program management Design requirements Information Control Change control Assessment Training

A Brief History of CM in the Nuclear Industry Millstone Spent Fuel Pool Cooling (1996) NRC had lost confidence in utility’s ability to know and maintain its design basis and to implement design and licensing requirements 10CFR50.54(f) letter in October 1996 to all licensees that required a response on how design basis information was controlled and maintained. More far-reaching implications than letter that NRC was persuaded not to issue in 1993

A Brief History of CM in the Nuclear Industry Millstone Spent Fuel Pool Cooling (1996) 10CFR50.54(f) letter helped to solidify CMBG as a viable resource for the industry and demonstrated how the CMBG "network" could be used to find and distribute valuable CM information between utilities, including good practices and lessons learned

A Brief History of CM in the Nuclear Industry DC Cook Design issues (1997) Extended shutdown due to inability to respond to design basis event and other configuration issues Contributed to INPO decision to modify the evaluation performance objectives and criteria to include configuration management and to the formation of a new CM evaluation department.

A Brief History of CM in the Nuclear Industry INPO AP-929 (1998) “Configuration Control Process Description” Focused on changes to plant configuration

CMBG Contributions to Industry CM Guidance Documents ANS/NIRMA CM-1.0 -2000 “ Configuration Management of Nuclear Facilities” Based on NIRMA TG-19 CMBG members participated in development, review and issuance. Drafts reviewed at CMBG conferences Criteria Program management Design requirements Information Control Change control Assessment Training

CMBG Contributions to Industry CM Guidance Documents IAEA TECDOC-1335 (2003) "Configuration Management in Nuclear Power Plants“ Contained elements of INPO AP-929 and ANSI/NIRMA CM-1.0 Criteria Program management Design requirements Information Control Change control Assessment Training

CMBG Contributions to Industry CM Guidance Documents 2002 CMBG Conference - initiative to reach agreement between INPO and NEI documents NEI CM Community of Practice (2002) CM Process and PI’s included in NEI Standard Nuclear Performance Model (2003)

A Brief History of CM in the Nuclear Industry INPO - Margin Management (2003) INPO reorganization emphasized, “Evaluating Configuration and Margin Management” Greater than design basis range Operating Point Limit Normal Operating Point Design or Tech Spec Basis Limit Functional/Design Failure Allowed operating range Analyzed transient range Operating margin Design margin ( Design allows operation in the transient range. However operating restrictions consistent with the design, such as the magnitude and frequency of excursions into this range apply) ( The allowed operating range provides the normal margins operators use without violating setpoints ) ( This is a prohibited range of operation and represents the additional conservative margin to account for uncertainties in design and construction )

A Brief History of CM in the Nuclear Industry INPO 03-04 (November 2003) “Performance Objectives and Criteria” Configuration Management CM.1 Maintaining Margins Consistent with Design Requirements CM.2 Operational Configuration Control CM.3 Design Change Processes CM.4 Conduct of Engineering CM.5 Reactor Engineering and Fuel Management

A Brief History of CM in the Nuclear Industry INPO 05-03 (May 2005) “Performance Objectives and Criteria” Configuration Management CM.1 Maintaining Margins Consistent with Design Requirements CM.2 Operational Configuration Control CM.3 Design Change Processes CM.4 Reactor Engineering and Fuel Management

CMBG Contributions to Industry CM Guidance Documents INPO AP-929, Rev 1 (2005) “Configuration Management Process Description” “Three-Ball model became “CM Equilibrium Model” Return to CM Equilibrium (new) Margin Model (new)

CMBG Contributions to Industry CM Guidance Documents IAEA Draft Safety Report. “Application of Configuration Management in Nuclear Power Plants” (to be issued in 2007) Elements of AP-929 (Rev 1)

CMBG Contributions to Industry CM Guidance Documents ANSI/NIRMA Standard-CM-1.0, Rev 1 “Configuration Management of Nuclear Facilities”

2008 CMBG Conference Changes First ever West Coast site “Café” style breakouts Wednesday IT forum Dreaded “vendor” participation

CMBG Contributions to Industry What’s next?