26th February 2015 Teleconference

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
15 th September 2013 Enagás and TIGF Information to NRAs.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
32 nd IG meeting 15 th July 2015 Enagás, GRTgaz, REN and TIGF.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 1 st December 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
29th November 2016 Teleconference
20th SG Meeting South Gas Regional Initiative
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
21st IG Meeting South Gas Regional Initiative
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
South Gas Retional Initiative
40th IG meeting 29th November 2016
13th December 2013 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
EU Implementation Programme
26th IG meeting 23th January 2014
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
South Gas Retional Initiative
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
20th April 2016 Teleconference
South Gas Retional Initiative
26th February 2015 Teleconference
41st IG meeting 24th January 2017
37th IG Meeting South Gas Regional Initiative
8th February 2018 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
EWRC-RAE MUTUAL PROJECTS
20th April 2016 Teleconference
29th April 2014 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
40th IG meeting 29th November 2016
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
41st IG meeting 24th January 2017
39th IG meeting 4th October 2016
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
12th December 2014 Teleconference
EWRC-RAE MUTUAL PROJECTS
39th IG meeting 4th October 2016
EWRC-RAE MUTUAL PROJECTS
Work plan of GRI NW for 2011 Three out of four projects are started
The establishment of the 2nd list of Projects of common interest
South Gas Retional Initiative
39th IG meeting 4th October 2016
Presentation transcript:

26th February 2015 Teleconference 31st IG Meeting South Gas Regional Initiative 26th February 2015 Teleconference

Agenda

(for information by NRAs) II. CAM NC II.1. Results of the last monthly auctions (for information by NRAs)

Allocated capacity (%) of total offered bundled monthly capacity II. CAM NC II.1. Summary of monthly auctions results via PRISMA Participation without incidents. Clearing price was the reference price at every auction.   Allocated capacity (%) of total offered bundled monthly capacity VIP PIRINEOS VIP IBERICO FR-ES ES-FR ES-PT PT-ES October 2014 34 7 November 2014 69 12 December 2014 87 10 January 2015 February 2015 18 March 2015 23 5

(for information by TSOs) II. CAM NC II.2. TSOs proposal of common methodology to maximize technical capacity (for information by TSOs)

II. CAM NC II.2. Capacity calculation and maximisation at interconnections Article 6.1 of Regulation (EU) nº 984/2013 (CAM NC) states that: “(a) In order to maximise the offer of bundled capacity through the optimization of the technical capacity transmission system operators shall take the following measures at interconnection points, […] , the transmission system operators shall establish and apply a joint method, setting out the specific steps to be taken by the respective transmission system operators to achieve the required optimization. NEXT STEPS: Agreement on a common methodology for calculation of capacity in the Region. URGENT: capacity to be sold in the annual auction on 2 March – maximising the offer of bundled capacity at both VIPs in the Region: VIP PIRINEOS and VIP IBERICO

II. CAM NC II.2. Capacity calculation and maximisation at interconnections VIP PIRINEOS (GWh/d) ES FR FR ES Spanish side French side IP Biriatou summer 1 Apr-31 Oct 43 9 10 winter 1 Nov-31 Mar 40 5 20 3 IP Larrau 165

(for information by TSOs) II. CAM NC II.3. Status of TSO’s IT systems for adaptation to daily auctions by 1st November 2015 (for information by TSOs)

(for information by TSOs) III. CMP: last development of OSBB proposal III.1. Common methodology of OSBB for the Region (for information by TSOs)

III. CMP: last development of OSBB proposal NRAs reaction to OS proposal A common document for the Region – agreement by TSOs: TIGF, REN and Enagás, is required. Positive evaluation, as a first step in the right direction to comply with European and national rules. Methodology: it will start with conservative figures and it will continuing increasing the level of risk, once parameters values will be changed. Fixed parameters could be revised after the first year of application. Implementation date should be adapted to the application of daily auctions: November 2015. A public consultation will take place in Spain when both methodologies are submitted (OS&BB).

(for information by NRAs) IV. Balancing NC implementation in the three countries (for information by NRAs)

IV. Balancing NC implementation in the three countries FRANCE The “Trading region South”, a single market zone including GRTgaz South zone and TIGF, will be implemented from 1 April 2015. Both TSOs will share a single trading point in southern France. They will keep two distinct balancing systems but they will use the same balancing marginal prices. The balancing network code will be fully implemented in France in October 2015, consistently with CRE deliberation of 15 January 2015: http://www.cre.fr/en/documents/deliberations/approval/balancing-rules-grtgaz-tigf

IV. Balancing NC implementation in the three countries SPAIN In September 2014, GTS (the Technical System Manager, the agent in charge of the balancing) –following article 52 - sent a justified request to the CNMC asking for an extension of the period to implement the code – by 1 October 2016. In October 2014, CNMC accepted the request. The answer was also sent to European Commission and ACER. The CNMC proposal of “Circular” to regulate the gas balancing is submitted to Public Consultation until 23 March 2015. http://www.cnmc.es/es-es/energ%C3%ADa/consultasp%C3%BAblicas.aspx

IV. Balancing NC implementation in the three countries PORTUGAL During this month, ERSE received from REN Gasodutos (TSO) – following article 52 – a justified request asking for an extension of the period to implement the code – by 1 October 2016. ERSE is preparing the acceptance of the request, which has to be sent to European Commission and ACER during the next 3 months In March it´s foreseen the beginning of working meetings with TSO, DSO and suppliers to discuss the framework to implement balancing NC. The public consultations to approve the new framework regarding Balancing NC, are foreseen for the 2nd semester.

(for information by NRAs) V. Infrastructures V.1.Update of the process of PCIs list (for information by NRAs)

V. Infrastructures V.I. Update of the process of PCIs list Last EC meeting was held on 22 January. Main points discussed were: JRC Methodology to assess candidates Using statics and mathematics formula, JRC transforms the parameters resulting from the CBA application into four indicators of security of supply, competition, market integration and sustainability Feedback from Ministries on the possible candidates approval Comments received from Stakeholders on the clusters proposed by ENTSOG Next RG meeting will be held on 2 March. The Agenda includes the following issues: TYNDP process Updated JRC assessment methodology Candidates presentation ACER/NRAs opinion on cost allocation of enabler projects Outstanding issues on specific projects

(for information by TSOs) V. Infrastructures V.2. Candidate projects of common interests in the Region (for information by TSOs)

VI. Preliminary agenda of the SG meeting 16th March (for discussion)

VI. Preliminary agenda of the SG meeting 16th March

KEY ACTIONS IN THE SOUTH REGION CONCLUSIONS KEY ACTIONS IN THE SOUTH REGION A common methodology, agreed by ENAGAS, TIGF and REN to calculate the capacity at both VIPs in the Region. Publication of capacities to be sold in the annual auction on 3 March (maximising bundled capacities) at both VIPs A harmonized OSBB methodology for the Region, agreed by ENAGAS, TIGF and REN An update on the progress on Bal NC implementation in the three countries, by NRAs. Sharing information on existing infrastructure projects and potential new schemes: hydraulic data to be exchanged by TSOs in order to simulate new interconnection capacities.  

VII. AOB and next meetings SG meeting on 16 March IG meeting in May?