● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Advertisements

Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Ion Commissioning: Thursday & Friday
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Tuesday 22nd January - morning
Monday 6th August & night
Machine availability reaching well over 80%
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Lost at 12:05 to power converter (RTQX2.R1) problem
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Friday 14th December - morning
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Saturday 3rd November - morning
90m "proper" VdM scans in the 90m/10m optics
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Friday 15th February - morning
Tuesday – Morning and Evening
Another Immortal Fill….
Wednesday 26 October 2011.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Monday 152 bunch operation summary
Tuesday
Presentation transcript:

LHC progress report Week 7 2013 Coordination: Jan Uythoven, Mike Lamont Quench tests coordination: Mariusz Sapinski

Overview of the week Monday Tuesday Wednesday Thursday Finished 1.38 TeV loss maps First 100b fill – VdM attempt abandoned Tuesday 500b 1347b fills 3557, 3558, 3559 Wednesday Fill 3560 Evening: start VdM(s) Thursday Finish VdM, quick fill for ALFA & TOTEM, dumped at 07:24 Switch to quench tests Thursday morning – Saturday morning: quench tests Saturday morning – Sunday morning: powering tests 18-02-2013 LHC status

Precursor - change to pp run at 1.38 TeV Last Sunday at 6:04: dump of last Pb-p fill Configure machine for high intensity proton operation Access for BPMS attenuators, ADT, ATLAS, CMS Change RF and ADT settings, BLM thresholds back, BBQ, Head-tail monitor settings reverted ALICE polarity to negative Tests with beam Cycles with probes, testing of interlocked BPMS, loss maps Injection (Inj. Prot. IN) Injection (Inj. Prot. OUT) Flat-top separated Un-Squeezed Collision (with RP IN?) Betatronic-H Validated OK CHECK Betatronic-V Neg. off-mom -- Pos. off-mom Asynch dump Just OK 18-02-2013 LHC status

Laurette and Markus special 3556 (500b) 3557 3558 3559 ALFA TOTEM 3555 (100b) 3560 Van der Meer scans 18-02-2013 LHC status

Same - luminosity 18-02-2013 LHC status

Proton-proton at 1.38 TeV Fill Nb Nc Stable Peak L Int L [pb-1] 3555 Dump 3555 100 mix 46 1h47m 2.7e30 .001 Loss map 3556 510 504 5h28m 5.6e31 0.59 OP 3557 1374 1278 1h28m 1.28e32 0.39 missing frame packet on the BLM optical link 3558 1h9m 1.48e32 0.50 RF crow bar 3559 8h18m 2.06 3560 5h12m 1.14e32 1.6 SIS interlock on orbit tolerances when starting length scale calib 3562 39 29 2h12m 0.008 3563 4h31m 2.4e30 0.002 Loss maps 3564 48m 1.24e32 0.27 18-02-2013 LHC status

Roman pots – late request At the end of the upcoming 1400 bunch fill we briefly insert the pots to the validated position of 22 sigma, just as a necessary condition for proceeding further in the plan. I remind that last night's insertion to 22 sigma from the 500 bunch fill was without any problem. At the end of a low-intensity fill, possibly the VdM fill, we insert the pots to 13 sigma (where we would have physics acceptance) and do a quick loss map at dumping time. If this loss map is ok, we insert to 13 sigma in the remaining fills. Mario Deile Only partially achieved 18-02-2013 LHC status

Beam size etc Emittance at injection were 1.1-1.2 um for the 50 ns beam Emittance from luminosity: 1.4 um with essentially nominal intensity (1.15e11 ppb) going into collision NB less ramp, no squeeze 18-02-2013 LHC status

End of Run 1 (2009 - 2013) 18-02-2013 LHC status

BSRT heating test We filled B2 in two major steps (690 bunches, waited ~30min, filled the rest up to 1338 bunches). Intensity per bunch ~1.5e11p. With the machine full we increased few times the RF voltage to reduce the bunch length. During the whole period we observed the temperature with probes in vacuum (installed during TS4). See the attached plot, from which: The 3 couples of probes (close to the mirror, close to the ferrite tiles and close to the mirror arm vacuum bellow) clearly show that the ferrite is absorbing most of the RF power (as expected) and likely heating the rest. We need to recalibrate the probes after dismantling the system in LS1… 18-02-2013 LHC status

BSRT heating test 18-02-2013 LHC status

BSRT heating test Even with the machine full for several minutes, the B2 mirror (glass bulk with dielectric coating, installed in TS4) didn't show any coating deformation --> image distortion, as observed in B1 (glass bulk + metallic coating) during 2012 high intensity fills and reproduced today in parallel to the B2 studies. The test was very useful to us, for understanding the system and take the appropriate actions during LS1. 18-02-2013 LHC status

TIM As agreed we are currently doing the RP survey of the LHC with the TIM while the beam is on (survey started at 10h23 - now arrived in point 4 – 3km of survey in total). Up to now the train is fully operational and controllable from surface with stable vision feedback. On the RP side we had a maximum of 1mSv when exiting UL55 with an average of 0.3µSv along the machine. Bruno Feral 18-02-2013 LHC status

Somewhat hampered on Friday by the change of power converter limits… Quench tests 18-02-2013 LHC status

QT: 1MW on to collimators During collimation quench test with protons, 1 MW losses over several seconds were generated on collimators using ADT excitation. No magnet quenched in such conditions while signal on BLMs exceeded the assumed signal at quench by factor 3.5. 18-02-2013 LHC status

QT: steady state with orbit bump 2. During steady-state loss with orbital bump a loss lasting about 20 seconds was generated directly on cold aperture. Quadrupole 12L6 quenched in with BLM signals approximately at the expected level. Results of this exercise confirm what was achieved during the test in 2010 and are in disagreement with collimation test result, pointing probably to a large dependence of BLM signal from the loss scenario. 18-02-2013 LHC status

QT: Fast losses 3. During fast loss quench test we have tried to address quench limit at UFO timescale. We have achieved longer loss (about 10 ms instead of ~1 ms) and quenched the magnet at the BLM signal level more than 5x higher than current estimation of quench limit. That is a very good news for UFO-related worries for LHC operation after LS1. 18-02-2013 LHC status

QUENCH! With 8.2e8p (bunch 1092) and 200% ADT gain 23:45 Friday evening QUENCH! With 8.2e8p (bunch 1092) and 200% ADT gain 18-02-2013 LHC status

QT: Q6 4. During Q6 test the magnet was quenched with current corresponding to beam energy of ~4.5 TeV. Unfortunately we had no time to repeat this test with current corresponding to higher beam energy. 18-02-2013 LHC status

Message from Mariusz This success is thanks to your efforts, careful planning and preparations, which started with the first QSTW meeting on March 13th 2012. We had in total 6 meetings. Slides and minutes can be found here: https://indico.cern.ch/categoryDisplay.py?categId=1537 I would like to thank you all. And thanks to OP for breakfast with champagne on Saturday morning! The data which were collected are very important to assess LHC limits during 7 TeV run. The analyses will continue over next weeks and results will be discussed and presented, at MPP, LSWG and Collimation meetings. & Daniel Valuch! 18-02-2013 LHC status

And near permanent presence during quench tests Special thanks… Many thanks to the collimation team (Stefano, Gianluca, Belen et al) for coming the last 4 weekends (pPb, PBp, polarity changes, pp) setting-up and verifying the loss maps And near permanent presence during quench tests 18-02-2013 LHC status

Saturday 16th February – early morning 08:08 Quench End Run 1 Ramp-down 16-02-2013 LHC status

Incoming 18-02-2013 LHC status