ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Introduction to Computer Engineering by Richard E. Haskell 8086 Tutor Monitor Module M14.3 Section 9.3 Appendix B.
(Voice Activated Home Control System). Project Summary Control any IR activated device –Via voice command Learnable –Learn IR Code –Learn Voice Command.
SmartDB Workbench.
James Robnett EVLA M&C Hardware PDR March EVLA Monitor and Control M&C Network.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
Author Wayne M. Koski EVLA Monitor & Control Software PDR May 14 & 15, EVLA Monitor and Control Module Interface Board (MIB) Design.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Rich MoeserEVLA System PDR December 4-5, EVLA System PDR Operations Requirements.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Wayne M. KoskiEVLA Front-End CDR – EVLA Receiver Monitor & Control April 24, EVLA Front-End CDR EVLA Receiver Monitor & Control F317 and F320 Modules.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Module Interface Board (MIB) Design.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, EVLA MONITOR AND CONTROL HARDWARE REQUIREMENTS.
James Robnett EVLA M&C Hardware CDR October 20, EVLA Monitor and Control M&C Network.
© UNT in partnership with TEA1 7 th Grade Career Exploration Module Career Focus: Computer Software Engineer Vocabulary.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, MIB FUNCTIONALITY.
James Robnett EVLA M&C Software PDR May EVLA Monitor & Control Software PDR Monitor & Control Network Security.
EVLA Monitor & Control Software PDR E2E Interfaces: Observation Scheduling Complaints to: Boyd Waters John Benson, Barry Clark, Tim Cornwell, Rich Moeser,
SunSatFriThursWedTuesMon January
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Slot – ID.
Bill SahrNSF Review May , EVLA Monitor & Control.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Tulane University School of Public Health and Tropical Medicine
School’s Name Teacher’s Name Date
Agenda MC Aug 13.
Object Oriented Programming
ULTRASONIC DISTANCE METER USING 8051
Computerised Business Systems, Inc.
E-games development process
System Design Ashima Wadhwa.
DIGITAL CALCULATOR USING 8051
Instructor’s Guide to Teaching SolidWorks Software Lesson 1
Chapter 2 Visual Basic Interface
Terry Cotter LO/IF Group Leader
Antenna Monitor & Control Subsystem Engineering Requirements
13-block rotation schedule
Software Requirements
EVLA M/C Software PDR, 14 May 2002
LEARNING AREA 4 : MULTIMEDIA
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
EVLA MONITOR & CONTROL CDR
Software Engineering Lecture #14.
Capítulo: Para Empezar
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Data Groupings: File File: a group of related records
Prepare a DD Form 1081-Return
How to output NW camera picture to external monitor.
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
Requirements Bryan Butler.
Contract Number - Administration
BEMS user Manual Fundación cartif.
POC: ASAP Prevention Branch Chief (706)
GROCERY LABELS SYSTEM w w w . w h i t e r o s e . c o m . t r.
Human-computer interaction
Presentation transcript:

ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

MODULE INTERFACES NEEDED FOR BENCH TESTING LOW LEVEL SCREENS HIGH LEVEL SCREENS TEST SOFTWARE Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

LOW LEVEL SCREENS PROVIDE USER ACCESS TO ALL MODULE COMMAND AND MONITOR POINTS BY ADDRESS CAPABLE OF READING SINGLE ADDRESSES AND ADDRESS BLOCKS CAPABLE OF SINGLE AND CONTINUOUS MONITOR UPDATES Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

LOW LEVEL SCREENS MONITOR VALUES CAN BE DISPLAYED IN HEX OR DECIMAL CAPABLE OF SINGLE AND REPETITIVE COMMANDS Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

HIGH LEVEL SCREENS USUALLY ONE SCREEN PER MODULE, SOMETIMES MORE MAY BE NEEDED A USER FRIENDLY INTERACTIVE MODULE INTERFACE IS PROVIDED IMPORTANT MONITOR POINTS ARE DISPLAYED, LABELLED, AND UPDATED CONTINUOUSLY Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

HIGH LEVEL SCREENS IMPORTANT COMMAND POINTS ARE DISPLAYED USER CAN SPECIFY A PRECISE VALUE FOR NUMERIC COMMANDS BUTTONS AND KNOBS CAN BE USED TO SET VALUES AND INITIATE COMMANDS Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

SYSTEM INTEGRATION SCREENS WILL MONITOR SYSTEMS – SOME COMMAND CAPABILITY MAY ALSO BE NEEDED SINGLE SCREEN WILL INTERFACE WITH MULTIPLE MIBS Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

TEST SOFTWARE TEST SOFTWARE WILL BE NEEDED FOR INDIVIDUAL MODULES SYSTEM TEST SOFTWARE WILL BE NEEDED FOR SYSTEM INTEGRATION Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

TEST ANTENNA ALL SOFTWARE DEVELOPED FOR BENCH TESTING/SYSTEM INTEGRATION WILL BE USED IN TEST ANTENNA ADDITIONAL SYSTEMS SCREENS AND TEST SOFTWARE WILL BE NEEDED Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002

SCHEDULE BENCH TESTING STARTS JANUARY, 2003 SYSTEMS INTEGRATION STARTS FEBRUARY, 2003 TEST ANTENNA SCHEDULED FOR APRIL, 2003 Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002