Orifice plate meter error resolution – cash flows

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
Credit Scenarios – Modification 0335 Joanna Ferguson.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 To re-define the Aggregate Reconciliation Period to reflect the period to which the charge relates.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
MOD0335: Offtake Meter Errors David Watson Distribution Workstream - 28 th October 2010.
Mod 0428 Charge Impact October Affected Supply Point Population.
Modification 0232 Presentation for Total By Gareth Evans.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Meter Error – NTS Revenue Flows Gas TCMF – 2 nd December 2010.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
Background Current balance of LDZ System and Customer charges
Accompanying Narrative
Wales & West Utilities Entry – Standard Special Condition D12
Narragansett Electric Rate Classes
City of Petersburg Water and Sewer Rates April 26, 2011
MIPI Energy – Daily Reports
Options for Mod 640 Replacement
Transmission Workstream 4th July 2007
An Introduction to Balancing Services Use of System Charging (BSUOS)
Market Trials ChMC 8th August 2018.
Revised registration for unregistered sites
LDZ System Charges – Structure Methodology 26 July 2010
SGN’s 2005/06 Shrinkage Assessment and Adjustment
Confirmation Notice Period for Certain ‘Unique’ Sites
Extraordinary DSC ChMC
Amendment to NEA & NExA Measurement Provisions Change Process
Modification th July 2008.
Danishtah Parker 0621 Workgroup 26 April 2018
Weekly Progress Update 13 July 2018
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
UNC Modification 0335 – Offtake Metering Error Payment Timescales
CSEPs Reconciliation Proposals
LDZ Offtake Meter Orifice Plate Error
Modification 0117 – Additional Considerations
Project Nexus Workgroup
UNC Modification Proposal 0201 National Grid Distribution
Weekly Progress Update 11 May 2018
DNPC07 Proposal DNPC07 proposed that Capacity/Commodity split of the LDZ System Charges should be changed to 100/0 The percentage of the Firm Capacity.
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Stefan Leedham 22 November 2007
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
OCC & Standard Commodity Changes
MOD 640 INVOICING VALIDATION RULES
MP0131: Meter Error Notifications
Stefan Leedham Transmission Workstream 2nd November 2006
Invoicing Proposals 20th May 2013
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Modification 440 Project Nexus iGT Single Service Provision
Extraordinary DSC ChMC
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Orifice plate meter error resolution – cash flows User Type Meter Error period (Mar 07 – Jul 09) Reconciliation Period 2010/11 2010/11 H2 charges* Shrinkage Provider Shrinkage gas over-procured Refund as a consequence of LDZ Reconciliation Impact – lower Allowed Revenue leads to lower charges SSP Portfolio Users within affected LDZ Increase in Transportation Income and collection may lead to Lower commodity charges LDZ Reconciliation of Transportation and Energy Charges based on SSP portfolio NTS - LDZ orifice plate meters Under billed All Shipper Users Lower overall commodity charge Refund as a consequence of NTS DC/ Interconnector Reconciliation Shrinkage Provider Impact – lower Allowed Revenue leads to lower charges Shrinkage gas over- procured Increase in Transportation Income and collection may lead to Lower commodity charges Relevant User/s (Direct Connect) NTS - Direct Connect / Interconnector Orifice plate meters Reconciliation of Energy and Transportation Charges Under billed All Shipper Users Lower overall commodity charge * subject to successful resolution of errors by July 2010 in time for charge setting notice periods