GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
Environmental Management Systems Refresher
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
ENERGETIC MATERIALS Co. Root Cause Analysis Guidelines 1.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Purpose of the Standards
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
ASSOC.PROF.DR. İBRAHİM YİTMEN
Office of Human Research Protection Georgia Health Sciences University.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Project Quality Management
9.0 Nonconforming Product Lifecycle
GLAST Large Area Telescope:
KMCO CAPA System Training
4.5 Checking and Corrective Action Monitoring and Measurement
GLAST Large Area Telescope:
GLAST Large Area Telescope:
ISO 9001 Awareness Training.
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Steps for product/material nonconformance:
Customers Customers Input Output Product
GLAST Large Area Telescope:
GLAST Large Area Telescope
AS 9100 Awareness Training.
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST LAT System Engineering
LAT Environmental Test Planning and Design Review
Introduction and Overview
All non-conformances must be resolved by identifying the root cause and defining the action(s) taken to prevent recurrence. In addition, the immediate.
ESSI CHANGE AND nonconformity control SYSTEM
GLAST Large Area Telescope:
Software Reviews.
In the Nadcap system, there are two types of non-conformance: major and minor, as defined on this slide. A key thing to note is that a minor NCR such as.
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Section Title Names

Role of QA in I&T Complete incoming receiving inspections per LAT- TD-02797 Review I&T MGSE and EGSE Document facility readiness and continue weekly audits for compliance Develop and approve I&T procedures, work orders, and process improvements

NCR Process All nonconformances will be documented in the SLAC GLAST Nonconformance Reporting System Nonconformances are to be documented promptly SLAC QA will segregate or identify nonconforming material or hardware until nonconformance is dispositioned All nonconformance reports shall have complete, concise problem identification, cause and corrective action

Nonconformance Reporting process The assigned LAT Quality Engineer will coordinate appropriate MRB activities based on classification of nonconformance Emphasis will be placed on working with applicable I&T Engineer throughout disposition effort All rework must be documented on approved rework work order Dispositions explain what actions will be taken or what information will be researched to resolve a nonconformance. The disposition also serves as a means to record information discovered as a result or inspections or troubleshooting actions. QA will assure that appropriate actions are taken to correct the discrepancy and return the product to an acceptable state

LAT Material Review Board (MRB) LAT MRB Charter Review material that does not conform to standards Determine disposition(s) Drive the development of effective corrective action to prevent recurrence It is the goal of the LAT MRB to reach unanimous decisions for all NCR dispositions. All final dispositions will be documented on the NCR Determine root cause of nonconformance Assign action to prevent recurrence Document and retain NCR records Determine if overstress analysis is required Monitor MRB process for continuous improvement

Open Liens to flight hardware 1.  CAL power consumption at low temperatures exceeds allocation. 2.  CAL baseplate planarity fails to meet IDD spec. 3.  CAL energy range - individual CDEs do not meet the high energy limit of 100 GeV.