Smart Grid ad hoc Closing Report – May 2011

Slides:



Advertisements
Similar presentations
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Advertisements

Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0720r1 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0186r3 Submission March 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0943r3 Submission September 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Smart Grid ad hoc – August 2011
Supplementary Plenary Information - July 2010
Supplementary Plenary Information - November 2010
Smart Grid ad hoc – April 2011
Supplementary Plenary Information - November 2010
Smart Grid ad hoc Meeting Information - January 2010
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
Smart Grid ad hoc Meeting Information - January 2010
Revision Process Summary
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
IMT-Advanced Opening Report
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
Smart Grid ad hoc – May – SGIP NIST PAP2 2 - EPRI FAN Name
Wireless Characterization for NIST PAP#2
Supplementary Plenary Information - July 2010
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
IEEE Shop Contents Date: Authors: Name Company Address
Energy STAR ad hoc Closing Report - January 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
TGn Closing Report Taipei, TW 802 Interim –18 Jan ‘08
Supplementary Plenary Information - September 2010
Wireless Characterization for NIST PAP#2
Smart Grid ad hoc Closing Report - March 2010
Smart Grid Activity Report 2010
Supplementary Plenary Information - May 2010
TGn Closing Report Los Angeles, CA, US 802 Interim
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Supplementary Plenary Information - September 2010
Supplementary Plenary Information - September 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
Supplementary Plenary Information - September 2009
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Candidate Introduction Bruce Kraemer Orlando 802 Plenary –17 Mar ‘08
Supplementary Plenary Information - May 2010
GEN ad hoc Summary - Sep 14 ‘07
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
TGn Draft Redline Notice
Smart Grid ad hoc Closing Report – January 2011
Supplementary Plenary Information - September 2009
November 2010, Motions for the EC
Supplementary Plenary Information - March 2010
Smart Grid Closing Report – November 2010
TGn Closing Report – September 24 ‘09
Smart Grid ad hoc-Closing Report - July 2010
IMT-Advanced Closing Report
Candidate Introduction Bruce Kraemer Orlando 802 Plenary –17 Mar ‘08
Plenary Information - September 2009
WBA Carrier Wi-Fi Liaison request - March 2014
January 2012 doc.: IEEE /0179r1 Jan 2012
Presentation transcript:

Smart Grid ad hoc Closing Report – May 2011 doc.: IEEE 802.11-11/0720r0 May 2011 Smart Grid ad hoc Closing Report – May 2011 Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988 bkraemer@marvell.com Date: 12 May 2011 Primary Meeting Document : 11-11-0720r2 Abstract: 1 – SGIP NIST PAP2 2 - EPRI FAN Field Area Network concepts & plans 11-11-802 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Propagation loss models May 2011 doc.: IEEE 802.11-11/0720r0 May 2011 NIST PAP#2 Current Work Propagation loss models Terrain & Clutter Characterization of deployment categories Household densities Framework for Guideline completion Review / Questions / Proposals generated for discussion in PAP2 802 Proposed Revision of Section 4 “Wireless Technology” Review of EPRI Field Area Network concepts & plans Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

2011 NIST PAP2 Meeting History May 2011 2011 NIST PAP2 Meeting History Date & Time Agenda & Slides Presented Approved Meeting Minutes 4/26/11 2:00PM ET Download Download (Unapproved) 4/12/11 2:30PM ET 3/29/11 6:00PM ET Download, Rural Area Propagation Analysis, Spreadsheet 3/10/11 8:00AM PT 2/25/11 3:00PM ET Download, PAP02 Proposed Operating Procedures 2/11/11 1:00PM ET http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP02Wireless Bruce Kraemer, Marvell

Models vs. Smart Grid Requirements

Extended Work Plan Proposal May 2011 Extended Work Plan Proposal Bruce Kraemer, Marvell

References Previous major submission package to NIST Doc 1396 May 2011 References Previous major submission package to NIST Doc 1396 https://mentor.ieee.org/802.11/dcn/10/11-10-1396-03-0000-smart-grid-summary-input-to-pap-2-report-nov-2010.ppt And therein: Bruce Kraemer, Marvell