THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR

Slides:



Advertisements
Similar presentations
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Advertisements

1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
HVDC Challenges in Grid Operation
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
AN OVERVIEW OF AN OVERVIEW OF SOUTHERN REGION SOUTHERN REGION POWER SYSTEM POWER SYSTEM ADDITIONAL GENERAL MANAGER SRLDC, BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
15th Tcc / 16th srpc meeting Venue: GOA Date: 29th / 30th April 2011
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri P. Shankar Chief Vigilance Commissioner At NORTHERN REGIONAL LOAD DISPATCH CENTER 25 th March.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Discussion on Draft Restoration (Black Start)procedures.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
I SLANDING SCHEMES SOUTHERN REGION SRPC, Secretariat.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
POWER GRID CORPORATION OF INDIA LTD.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
SOUTHERN REGION EXPERIENCE
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
Commercial Issues for 73 nd OCC TN opened LC for Rs.5Crs for UI payment delays during TN to enhance the LC amount to 32.84Crs as per their liability.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
UI SUMMARY BOTTLENECKS IN SR GRID RECENT GRID DISTURBANCES MERIT ORDER OCC PRESENTATION FGMO KAR DISTURBANCE REDUCING THE LOSSES IN GRID BUYING AND SELLING.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
SPECIAL PROTECTION SCHEME FOR KOODANKULAM
ISSUE OF CONCERN.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PRESENTATION COVERS Past/Present Power Scenario Issues involved
REGIONAL ENERGY ACCOUNT BASED ON AVAILABILITY BASED TYARIFF
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Presentation transcript:

THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR GOOTY HOODY SALEM UDUMALPET TRICHUR MADURAI TRICHY MADRAS NEYVELI CUDDAPAH DAVANAGERE KAIGA 115 317 RSTPP BHADRAVATI 130x2 164x2 182 151 181 173 302 308 172 277 279 155 178x2 BANGALORE SIRSI MUNIRABAD P N JEYPORE 63 187 2x221 54 Kadra Kodasally Nagjhari 1 120 60 MAPS NELLORE By Tripping of Salem-Bangalore and Cudddapah-Madras Southern Grid was getting devided into two blocks NELAMANGALA GAZUWAKA HIRIYUR 189 267x2 258 242 175 179 127 221x2 146x2 52x2 301x2 300 28 330 FIG-2 THE SR GRID IN 1996

THE FIRST SCHEME: 1996 CONDITIONS Line Name Frequency Below (Hz) POWER FLOW(MW) Time delay (second) Type of Relay CUDAPPA-MADRAS 47.8 0.5 UF SALEM- BANGALORE 1 48.0 100 MW towards CUDAPPA RPUF 300 MW towards BANGALORE

14 – 12 -1994 1538 HRS 20 280 60 60 340 110 SEBS SHARES CGS RELIEF THE SR GRID IN 1996 14 – 12 -1994 1538 HRS SEBS SHARES APSEB 750 MW KEB 522 MW KSEB 392 MW TNEB 988 MW BHADRAVATI 178x2 CGS RELIEF NTPC 1820 MW MAPS 260 MW NLC II 640 MW 267x2 187 1 RSTPP 155 2x221 P 189 301x2 279 GAZUWAKA P P HYDERABAD P KHAMMAM 277 317 P 258 P 221x2 115 VIJAYAWADA Nagjhari RAICHUR 1538 HRS GOOTY VOLTAGE DIPPED FROM 300 KV TO 250 KV.AFTER AP SHEDDING LOAD VOLTAGEIMPROVED TO 290 KV. MUNIRABAD 120 172 302 NAGARJUNASAGAR 146x2 Kodasally 308 P N P 20 52x2 KAIGA SIRSI 280 GOOTY P 60 NELLORE 60 CUDDAPAH Kadra DAVANAGERE 173 300 60 HIRIYUR 340 242 NELAMANGALA 300 182 BANGALORE P 181 P 330 MAPS HOODY 28 110 MADRAS 260 151 63 175 1630 HRS SOMANHALLY REPORTED DIP IN GOOTY VOLTAGE TO 265 KV AT 1615 HRS. REDUCTION IN TN DRAWAL ON CDP –MAS AND SLM-BNG, GOOTY VOLTAGE IMPROVED. P 54 164x2 SALEM 179 NEYVELI P UDUMALPET 130x2 P P TRICHY 130x2 TRICHUR 127 P MADURAI FIG-2

10 – 12 -1994 60 300 60 90 250 CGS RELIEF NTPC 1780 MW MAPS 280 MW NLC II 830 MW THE SR GRID IN 1996 10 – 12 -1994 BHADRAVATI 178x2 267x2 187 RSTPP 1 155 2x221 189 301x2 P 279 GAZUWAKA P P HYDERABAD P KHAMMAM 277 317 P 258 P 221x2 115 VIJAYAWADA Nagjhari 0730 HRS CDP – BNG 330 MW -60 MVAR GTY – BNG 300 MW -60 MVAR SLM – BNG -90 MW 250 MVAR RAICHUR MUNIRABAD 120 172 302 NAGARJUNASAGAR 146x2 Kodasally 308 P N P 60 52x2 KAIGA SIRSI 300 GOOTY P NELLORE 60 CUDDAPAH Kadra DAVANAGERE 173 330 60 242 HIRIYUR NELAMANGALA 300 182 BANGALORE P 181 P 330 MAPS HOODY 28 90 MADRAS 250 151 63 175 AS THE VOLTAGES ARE LOW, AP HAS BEEN ASKED TO PUT N’SAGAR MACHINES TO CONVERT IN CONDENSER MODE. P 54 164x2 SALEM 179 NEYVELI P UDUMALPET 130x2 P P TRICHY TRICHUR 127 130x2 P MADURAI FIG-2

23 – 07 -1995 160 105 215 FLOWS CGS RELIEF NTPC 900 MW MAPS 145 MW NLC II 960 MW SEBS SHARES APSEB 628 MW KEB 392 MW KSEB 260 MW TNEB 788 MW THE SR GRID IN 1996 23 – 07 -1995 BHADRAVATI 178x2 267x2 187 RSTPP 1 155 2x221 P 189 301x2 279 GAZUWAKA P P HYDERABAD P KHAMMAM 277 317 P 258 P 221x2 115 VIJAYAWADA Nagjhari RAICHUR FLOWS MUNIRABAD 120 172 302 NAGARJUNASAGAR 146x2 Kodasally 308 P N P 52x2 TIME CDP-BNG CDP-MAS SLM-BNG 0900 HRS 160 MW 105 MW 215 MW 0930 HRS 140 MW 072 MW 245 MW 1100 HRS 135 MW 035 MW 250 MW 1135 HRS 260 MW KAIGA SIRSI GOOTY P NELLORE CUDDAPAH Kadra DAVANAGERE 173 160 60 242 HIRIYUR 105 NELAMANGALA 300 182 BANGALORE P 181 P 330 MAPS HOODY 28 215 MADRAS 151 63 TRIPPING OF THE LINE WHEN > 300 MW 175 P 54 164x2 SALEM 179 NEYVELI P UDUMALPET 130x2 P P TRICHY 130x2 TRICHUR 127 P MADURAI FIG-2

As THE SALEM – BANGALORE FLOW IS INCREASING , BECAUSE OF RPUF RELAY SETTING AT 300 MW, SRLDC ISSUED MESSAGES TO AP, KAR. AT THE ABOVE INSTANCE OD/UD AP +92 MW KAR +25 MW KER -71 MW TN -47 MW

THANK YOU

23 – 07 -1995 105 215 0900 HRS CDP – BNG 160 MW CDP – MAS 105 MW THE SR GRID IN 1996 23 – 07 -1995 0900 HRS CDP – BNG 160 MW CDP – MAS 105 MW SLM – BNG 215 MW BHADRAVATI 178x2 267x2 187 1 RSTPP 155 2x221 189 301x2 P 279 GAZUWAKA P P HYDERABAD P KHAMMAM 277 317 P 0930 HRS CDP – BNG 140 MW CDP – MAS 072 MW SLM – BNG 245 MW 258 P 221x2 115 VIJAYAWADA Nagjhari RAICHUR MUNIRABAD 120 172 302 NAGARJUNASAGAR 146x2 Kodasally 308 P N P 52x2 KAIGA SIRSI GOOTY P NELLORE CUDDAPAH Kadra DAVANAGERE 173 160 60 105 242 HIRIYUR NELAMANGALA 300 182 BANGALORE P 181 P 330 MAPS 1100 HRS CDP – BNG 135 MW CDP – MAS 035 MW SLM – BNG 250 MW HOODY 28 215 MADRAS 151 63 175 P 54 164x2 SALEM 179 NEYVELI 1135 HRS CDP – BNG 135 MW CDP – MAS 035 MW SLM – BNG 260 MW P UDUMALPET 130x2 P P TRICHY TRICHUR 127 130x2 P MADURAI FIG-2

As THE SALEM – BANGALORE FLOW IS INCREASING , BECAUSE OF RPUF RELAY SETTING AT 300 MW, SRLDC ISSUED MESSAGES TO AP, KAR. AT THE ABOVE INSTANCE OD/UD AP +92 MW KAR +25 MW KER -71 MW TN -47 MW

14 – 12 -1994 20 280 60 60 340 110 CGS RELIEF NTPC 1820 MW MAPS 260 MW NLC II 640 MW THE SR GRID IN 1996 14 – 12 -1994 BHADRAVATI 178x2 267x2 187 1 RSTPP 155 2x221 301x2 P 189 279 GAZUWAKA P P HYDERABAD P KHAMMAM 277 317 P SEBS SHARES APSEB 750 MW KEB 522 MW KSEB 392 MW TNEB 988 MW 258 P 221x2 115 VIJAYAWADA Nagjhari RAICHUR MUNIRABAD 120 172 302 NAGARJUNASAGAR 146x2 Kodasally 308 P N P 20 52x2 KAIGA SIRSI 280 GOOTY P 60 NELLORE 60 CUDDAPAH Kadra DAVANAGERE 173 300 60 HIRIYUR 340 242 NELAMANGALA 300 182 BANGALORE P 181 P 330 MAPS HOODY 28 110 MADRAS 260 151 63 175 1404 HRS CDP – BNG 300 MW -20 MVAR GTY – BNG 280 MW -60 MVAR SLM – BNG -110 MW 260 MVAR CDP – MAS 340 MW -60 MVAR P 54 164x2 SALEM 179 NEYVELI P UDUMALPET 130x2 P P TRICHY 127 130x2 TRICHUR P MADURAI FIG-2