UK CMS Oversight Committee Mtg

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
Final CALICE OsC meeting: Status and summary of project
University of Wisconsin
Micromegas Vertex Tracker Status Report
T1 Electronic status Conclusions Electronics Cards:
Overview Detector details Crystals Photo-detectors
Mini-drawers, FE-ASIC , Integrator
CMS High Granularity Calorimeter (HGCAL) Beam H2 2017
CMS-ECAL Front-End monitoring Matteo Marone
The Status of the CMS Electromagnetic Calorimeter
CMS RPC Endcap RE1 Status Report
Quick link: cern.ch/cmstb04
Pierluigi Paolucci - I.N.F.N. Naples
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
RPC Detector Control System
4x5 SC array for the test beam in Apr 2007
PROGRESS on EE VPTs, Dees D Cockerill
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Presentation transcript:

UK CMS Oversight Committee Mtg 23.5.2008 The CMS ECAL Endcaps UK Responsibilities Procurement and testing of VPTs Design and procurement of the VPT HV system Design/procurement of the mechanical structures Electronics systems integration SC and Dee assembly Test beam appraisal and analysis UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 EE front end readout VPTs SC HV cards Umbilical cables EE Motherboards All delivered EE VFE cards EE FE cards Polyethylene moderator UK CMS Oversight Committee Mtg 23.5.2008

Naked SC assembly rates 16/wk ‘Naked’ SC assembly All 14648 VPTs and crystals glued All SCs completed (Monday of this week!) Nov OsC Naked SC assembly rate, per week UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 SC assembly Plot: Crystal delivery Naked SC assembly HV tested SCs - All SCs HV tested and ready or mounted on Dees Nov OsC UK CMS Oversight Committee Mtg 23.5.2008

Dee assembly – SC mounting 23 May 08 1 Dee SC mounting Dees 1-3 SC mounting completed Dee4 completed by today, 23.5.08 1 Quad Nov OsC UK CMS Oversight Committee Mtg 23.5.2008

Super unit to be welded together Power cooling Super unit to be welded together Power cooling 2 of the 8 versions of ‘super cooling units’ needed per Dee Each is a fully welded and tested system The last 2 (of 32) have been completed this week and are undergoing pressure/leak tests Transfer frame A fully welded column of 2 cooling blocks UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 Dee4 Dee4 As of Thursday, 9 left to mount Expect mounting to be completed by Fri 23.5.08. UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 Dee3   Dee3 HV looming completed Moderator mounted Stability fibres and LV mounted Trigger mapping into readout motherboards completed (this photo) UK CMS Oversight Committee Mtg 23.5.2008

OPAL transfer frame to point 5 Dee2 OPAL transfer frame to point 5 Dee2 with its complete set of SCs Dee2 All super cooling units mounted Installation of VFE and FE cards underway UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 Dee1   Dee1 All electronics in place All towers tested and working Dee1 Fibre optic readout support panels in place, ready for final fibre optic routing UK CMS Oversight Committee Mtg 23.5.2008

Dee Assembly and Integration Status, 22.5.2008 Dees 1–3 All 10986 channels checked and OK for signal continuity Dee1 Single tower readout – pedestal width on all channels ~2ADC counts in line with expectations for electronics noise of 3500-4000 electrons per channel UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 EE Risks Insufficient ECAL effort (ED/ID) Continually monitored New cooling scheme At end of production Electronics integration Good progress, teams in place Cable crimps All replaced, checked at each level of subsequent integration Fibre optic routing – possible delays/misrouting Database ready. Routing on Dee1 commencing UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 EE Risks (cont’d) Installation and commissioning at point 5 ECAL installation and commissioning led by K Bell (RAL) Brings full experience from the mounting of the 36 supermodules for the barrel ECAL Point 5 installation and commissioning team established Team involves CERN CMS (point 5) and CERN ECAL engineers and technicians and a dedicated ECAL DAQ team Weekly meetings Detailed installation sequence in place, from surface of point 5 to mounting on HE Commissioning will be carried out in sectors with close feedback from the DAQ/DQM teams UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 Planning for EE Dee1 and Dee2 at point 5, r.f.i. by 16 June 2008 Dee3 and Dee4 at point 5, r.f.i. by 21 July 2008 UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 Conclusions SC assembly and mounting on Dees (nearly) completed Good progress with the installation of electronics and services on Dees 1-3 Dee1 and Dee2 to point 5 by 16 June Dee3 and Dee4 to point 5 by 21 July UK CMS Oversight Committee Mtg 23.5.2008

UK CMS Oversight Committee Mtg 23.5.2008 Other info UK CMS Oversight Committee Mtg 23.5.2008