Agenda: “Electrifying” NeSSI

Slides:



Advertisements
Similar presentations
Leadership Giving Discussion. Agenda Introduction What is Leadership Giving at…? Metrics for Leadership Giving Identifying Leadership Giving prospects.
Advertisements

GEC3 – October 28-30, 2008 groups.geni.net GENI working group wiki GENI Substrate Working Group Agenda and Deliverables Joseph B. Evans,
Complete, Modular, Ready Today 1 History of ISA SP76 NeSSI Current Standards ANSI/ISA (2002) IEC ( )
Parker Hannifin Corporation
NeSSI Open Session September 11 th, 2001 Room 311A, Convention Center 1:30 - to about 4:00 PM 1:30 PM. Introduction & review of 3 questions. 1:45 PM. Discussion/Breakout.
Instrumentation Surface Mount Technology for Process Analytic Sampling Systems Steve Doe, Parker Hannifin Corporation.
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Interface to the Process Jim Tatera, Rob Dubois, Peter.
© 2006 Swagelok Company. Swagelok confidential. For internal use only. IS CAN Bus – CiA WD 103 Update Low Cost, Intrinsically Safe Transducer Bus Enabling.
IFPAC 2003: Wed PM-II Session "NeSSI: A Sampling Platform for Micro Physical and Micro Analytical Sensors" Session Chair: Peter van Vuuren ExxonMobil Chemical.
Applying Wireless / SI/O Architecture To NeSSI March 7, 2001 John Crawford VP, Business Development Crossbow Technology, Inc.
NeSSI/ Micro-Analytics Workshop May 4-5, 2003: CPAC, Univ. of Washington, Seattle 2003 Spring Sponsor Meeting Center for Process Analytical Chemistry NeSSI*
CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,
NeSSI - Next Steps Turning Vision into Reality. May 9, 2001 Agenda CPAC Sampling Focus Group w Agenda Review and Comments about Monday Session [5 min]
NeSSI - Sensor Component Requirements Safety Universality Interconnectability Compatibility ABB.
CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,
NeSSI™ Open Workshop IFPAC 2004 R. Dubois/J. Gunnell/J. Mosher January 14, 2004 Arlington Salon V 6:00-7:15 PM.
Small Smart Integrated Sensor & Sampling Systems CPAC: Nov 1, 1999 Small Smart Integrated Sensor & Sampling Systems Tutorial Session Sponsored by the Oil.
ISAExpo October 2003: Houston, TX NeSSI - Examples of Some Recent Developments “the best way to predict the future is to create it”
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Status and Update Jim Tatera, Rob Dubois, Peter van.
Home and Learn How Setup a Wireless Internet Connection.
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
Instrumentation Developments in Stream Switch Valve Technology Steve Doe, Parker Hannifin Corporation.
© Swagelok Company, 2004 Modular Platform Components (MPC) Overview John Wawrowski Swagelok Company Solon, Ohio NeSSI Workshop May 6, 2004.
Hermitage A Mark Martin (MN) Steve Mehring (MT). Introduction to Hotel Audio Setting up and Managing a WiFi Hotspot Bluetooth speakers for smartphones.
Modular Sampling System Initiative CPAC/ISA: August 23, 2000 Modular Sampling System Initiative ISAEXPO2000 Meeting Center for Process Analytical Chemistry.
CPAC/NeSSI Workshop May 6, 2004 (Times are PST) Best Western University Tower Hotel, Seattle, Washington, USA AMPM 08:00 Welcome – M. Koch (CPAC Dir.)
1 Citius, Fortius, Altius: A New Sampling/Sensor Initiative (NeSSI) Rob Dubois & Peter van Vuuren.
TM New Directions in SP Modular Substrate Systems Steve Doe Parker Hannifin Corporation.
Modular Sampling System Initiative Pittcon: March 7, 2001 New Sampling/Sensor Initiative “Electrifying” NeSSI - Wireless to the Rescue? Pittcon 2001 Meeting.
Computer Graphics Lecture 02 Fasih ur Rehman. Last Class Introduction to Computer Graphics Areas Application.
AstroGrid Use Case Workshop & Project Review Leicester, August 2002.
Mission Inn Riverside, California October 10-20, 2006 Watershed Partnership Seminar SemTitle_Scallop Sponsored by: CALFED California Bay Delta Authority.
Agile Working Group 07/15/2014 Facilitator: Robert McCarthy Scribe: TBD 1.
Industry Analytics Initiatives: Status & Plans IFPAC 2002 January 23, 2002 San Diego, CA IFPAC 2002 Industry Analytics Initiatives: Status & Plans Session.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
BETWEEN SAM AND THE SUBSTRATE – A SMART VALVE FOR NeSSI Seventeenth International Forum Process Analytical Chemistry IFPAC 2003 Scottsdale, Arizona 1/23/2003.
GET CONNECTED Personal 4 Whys. Purpose To create mission and vision statements for the individual team members. To clarify the relationship between the.
WELCOME 22 & 23 June Regional Partners and Provider Relationships Regional Awareness Workshop 3.
AGENDA: CPAC/NeSSI™ Workshop, 9 November, 2006
Advanced Control Schemes (Part 2) - Agenda
NeSSI: Industry Vision & Gen III – what are the next steps?
Copyright Danielle Dubois
Session Chair: Rob Dubois, Dow Chemical Process Analytical R&D
Introduction: the NeSSI generations
Intro to Digital Control Test # 2 - Agenda
IFPAC NeSSI Update Item 1
PRELIMINARY DESIGN REVIEW
Chapter 1: Introduction
אופירה כץ אוניברסיטת תל-אביב החוג לרפואת המשפחה
Copyright Danielle Dubois
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Control Loops: Primary Sensors, Transmitters, and Transducers - Agenda
Active Living Subcommittee November 15th, 2016 WELCOME
NASTER Workshop July 10 Introduction
University Template Sample Slides June 2017.
IEEE P Working Group for Wireless Personal Area NetworksTM
NO CAP ON CARE COSTS - WHAT HAPPENS NOW?
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
New FSA Logistix PPTX Template
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Statistical Process Control
Substation Automation IT Needs
Connect To The Customer
IEEE P Working Group for Wireless Personal Area NetworksTM
Statistical Process Control
Presentation transcript:

Agenda: “Electrifying” NeSSI Introduction Rob [5] Vision - NeSSI Capabilities Rob [10] Part I - Current Capabilities Swagelok Richard Ales [10] Parker Steve Doe/Frank Ruiz [10] FRCO John Gajewski [10] ABB Kelley Bell [10] Define Substrate Power & Heating Issues Discussion/Next Steps - Rob - facilitator [20]

Agenda: “Electrifying” NeSSI Break [10] Part II - Future Capabilities Presentations Bluetooth - Crossbow - John Crawford [15] Wireless Sampling Systems - Peter [15] NeSSI & Bluetooth - John Crawford [10] Define Connectivity & Signal Issues Discussion/Next Steps - Peter - facilitator [20] Wrap-up & Summary - Peter [10]