Radiation Levels in ALICE Andreas Morsch Meeting on ALICE Radiation Tolerance 30/8/2004.
Advertisements

Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Abstract: Based on the principle of the RADMON on line radiation monitoring system for the LHC, a new type of low cost, battery powered radiation monitors.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Pawel Krakowski TE-VSC-ICM LHC R2E for vacuum control systems Vacuum, Surfaces & Coatings Group Technology Department Automation Forum-electronics session,
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
PSB RF bypasses + PSB TFB electronics A. Blas PSB-LIU meeting04 Jun Executive summary: Components for the PSB rf-bypasses will be installed (Joao.
CERN IT Department CH-1211 Genève 23 Switzerland t HP ProCurve 2910 Ethernet switch in CNRAD April-June 2012 RadWG Meeting Gyorgy.
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
Update on radiation estimates for the CLIC Main and Drive beams Sophie Mallows, Thomas Otto CLIC OMPWG.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
Actel Antifuse FPGA Information – Radiation Tests Actel Antifuse FPGA – A54SX72A 72K gates 208 pqfp package 2.5v to 5.0v I/O tolerant $62 each for tested.
RadMon thermal neutron cross-section calibration D.Kramer for the RadMon team L.Viererbl, V.Klupak NRI Rez 1.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
R2E Availability October 15 th 2014 RE Equipment G. Spiezia.
A few slides about ‘Very’ ;-) VERY Quick look on IR7 – RadLevels (Ion versus Proton Run) [good and bad refers to losses in the machine] PLEASE NOTE THREE.
CALIFES 2015 run preliminary results
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
Luminosity monitor and LHC operation
High Energy Proton Synchrotrons
S. Roesler (on behalf of DGS-RP)
Radiation monitoring and follow up during LHC commissioning
Cryo equipment strategy in the R2E context
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
CNGS Run 2007: Radiation Issues
Cryo PLC issues [May 2011]: CASES
Long Shutdown for the LHC: Vacuum Beam Pipes
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Hollow e- lens, Cryogenic aspects
R2E – Experience and Outlook for LS1
Dosimeters installation during the EYETS 28/03/17
CNRAD dosimetry and Summary of the TS
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
S. Le Naour / RADWG meeting
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Status and evolution of radiation dose on 60A power converters
EN/EL Tests in H4IRRAD October to 7 November
Beam Background and the SVT Protection Collimator
Collimator Control (SEUs & R2E Outlook)
BLMs - Radmon – BSCs – BCMs for steering the beams in collision during the engineering run at 450 GeV Thijs Wijnands (TS/LEA), Richard Hall Wilton (TS/LEA),
Scrubbing progress - 10/12/2012
2003 test beam with 25 ns bunched muons
RADIATION induced failures in LHC 28th June 2011
Radiation To Electronics Collimation Areas (IR7/3)
Radiation To Electronics 2x A Brief Look
Hit density at scoring planes at r=10, 30, and 50 cm.
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
Coordination: Eva Barbara Holzer, Mike Lamont
R. Losito – LHC Performance Workshop Chamonix Jan 2010
RADWG Meeting February 2017
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Radiation Working Group RADWG
Presentation transcript:

Preliminary Analysis and foreseen actions EN-ICE&EN-STI Cryo PLC failure at P4 Preliminary Analysis and foreseen actions EN-ICE&EN-STI

QURA X RM01_R X RM01_L Long-Term: QURC(A,B) QUI (-1) CRYO RF (-0.5) Cumulative radiation levels: few 1E5–1E6cm-2 (fairly low!) QURA Towards US85: Factor ~5-10 less X RM01_R X RM01_L Long-Term: QURC(A,B) QUI (-1) CRYO RF (-0.5)

RadMon 4RM01S: 18 counts (5 during the last days) RadMon 4LM01S: 5counts (1 during the last days) All RadMons are set to 3V (high-sensitivity), thus the fluence determination strongly depends on the R-factor (thermal neutron to high-energy hadron ratio): possible range ~105-106cm-2

Considerations Failure occurred during beam-on, in a period when the UX45 RadMons counted (6 counts in few days) Radiation levels very low at location of the PLC (~1 year surface equivalent) Failure signature compatible with SEU but to be confirmed Independent: evolution of radiation levels in UX45 (and US45 junction) to be studied – vacuum pressures when going to 25ns? Most exposed equipment is in UX45 and relocation requirements are to be evaluated

Strategy Schneider PLC Radiation levels and their evolution with time Analysis of failure (result next week) CNRAD/H4IRRAD radiation tests with suspected memory board (September - October) Installation of redundant test PLC system (CB) Analysis 2012 statistic decision on general deployment on critical Cryo CPU during LS1 Radiation levels and their evolution with time Analysis of residual gas-densities and dependencies on bunch spacing, length and intensity Review of requirements/options/possibilities during R2E review in November Decision on CB and LS1 requirements/actions