CIS-Workshop on River Basin Management Plans

Slides:



Advertisements
Similar presentations
Wrap up and next steps. Remit of Water Forum To enable stakeholders to engage & influence statutory authorities in implementation of WFD To help ensure.
Advertisements

Water Framework Directive Programme of Measures River Basin Management Plans Milan Matuška Ministry of the Environment Slovak Republic Water Protection.
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
German Guidebook on the Implementation of the EC Water Framework Directive Dr. Harald Irmer Germany.
Water scarcity drafting group Salzburg, June Dicembre 2004Brussels, 11 April 2006 Water Scarcity Drafting Group WD meeting Salzburg June 1st and.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Water Framework Directive Implementation and Risk Analysis John Sadlier Water Quality Section.
WFD Reporting, Copenhagen, 4th Feb 2010 Schema overview WFD reporting training Copenhagen, 4 February 2010 Jorge Rodriguez-Romero DG Env, European Commission.
WFD Characterisation Report Dr Tom Leatherland Environmental Quality Manager 29 October 2003.
Water.europa.eu Water Framework Directive - a framework for Community action in the field of water policy Marieke van Nood WFD Team, DG ENV.D.2, European.
© WRc plc 2010 Agenda item 3b: Summary of WISE electronic delivery: presentation of an example.
Water.europa.eu Assessment River Basin Management Plans CIS Strategic Coordination Group meeting Brussels, May 2011 Marieke van Nood WFD Team DG.
WFD Schemas Article 3 – RBDs and Competent Authorities Article 5 – Water Bodies, Protected Areas and Summary RBD information Article 8 – Monitoring Programmes.
Water.europa.eu Compliance Checking of River Basin Management Plans Strategic Coordination Group Meeting, 4-5 November 2009 DG Environment, European Commission.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
The Water Framework Directive - Legal Issues for Policy Integration'
Principles and Key Issues
Pilot River Basin Network: Environment Directorate
Environmental Objectives- Article 4.7
Marine Strategy Framework Directive (MSFD)
WG 2.B Integrated River Basin Management
Assessment of 1st FRMPs and 2nd RBMPs
Daughter Groundwater Directive
CIS-Workshop on River Basin Management Plans
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
State of play of French progress in cost-effectiveness analysis
Preparing a River Basin Management Plan What are the open questions?
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
Philippe QUEVAUVILLER
WG 2.9 Best Practices in River Basin Planning
WG 2.5 Intercalibration.
Update on RBMP&FRMP adoption and reporting Assessment of RBMP&FRMP
Marine Strategy Framework Directive (MSFD)
CIS-Workshop on River Basin Management Plans 8 and 9 May 2006 Bonn
River Basin Management Plans
Preparing a River Basin Management Plan WFD Characterisation Manager
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Commission report on Art. 8 WFD Monitoring programmes
Horizontal Guidance on Wetlands What happened since the last Meeting
River Basin Management Planning
At the Water Directors meeting in June ’04 we recognised ……..
Activity on WFD and agriculture
Natural water Retention Measures
Results of a Research Project by Ecologic and the University of Kassel
on a protocol for Intercalibration of Surface Water
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
DG Environment, Unit D.2 Marine Environment and Water Industry
Alternative Methodology for Defining Good Ecological Potential (GEP)
Environmental objective document –
Water Directors meeting Mondorf-les-bains, June 2005
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
Preparation of the second RBMP in Romania
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
THE WATER FRAMEWORK DIRECTIVE (WFD)
Compliance checking of RBMP An inventory of questions
European Commission activities
WFD CIS 4th Intercalibration Workshop
Eutrophication activity
Concept paper on the assessment of WFD River Basin Management Plans
Suggestions from the Bonn Workshop on RBMP for CIS-Work programme
Water Scarcity Drafting Group WD meeting Salzburg June 1st and 2nd of 2006 Leaders: Italy & France Pascal Berteaud France 1 Dicembre 2004 Brussels,
River Basin Management Plans
WG A ECOSTAT Draft Mandate
Article 13 RBMP Schema.
DG Environment, Unit D.2 Marine Environment and Water Industry
Results of the screening of the draft second RBMPs
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

CIS-Workshop on River Basin Management Plans 8-9 May 2006, Bonn Introduction

River Basin Management Plans Heart of the river basin planning process

Remind of WFD planning steps By 2004 - District characterisation and register of protected areas By 2006 – Intercalibration of the ecological status classification systems . Definition of monitoring programmes By 2009 – Programme of measures for achieving WFD environmental objectives . River Basin Management Plan including designation of heavily modified water bodies

Remind of WFD planning steps By 2010 – Implement water pricing policies that enhance water resource sustainability By 2012 – Make measures be operational By 2015 – Achieve environmental objectives

Remind WFD planning steps A decision making process based on public involvement Information and consultation By 2006 – on the timetable and work programme for the production of RBMPs By 2007 – on the overview of significant water management issues By 2008 – on the draft river basin management plan

District characterisation Register of protected areas Risk assessment Status assessment Objective monitoring programmes Identification of the significant water management issues Definition of the environmental objectives River Basin Management Plan Programme of measures Definition of the measures

District characterisation Register of protected areas Risk assessment Status assessment Objective monitoring programmes Identification of the significant water management issues Definition of the environmental objectives River Basin Management Plan Programme of measures Definition of the measures

Significant water management issues Identification required by WFD Article 14.1 Essential step between article 5 reports and RBMP preparation Outstanding issues : What purpose ? What content, structure, level of detail ?

District characterisation Register of protected areas Risk assessment Status assessment Objective monitoring programmes Identification of the significant water management issues Definition of the environmental objectives River Basin Management Plan Programme of measures Definition of the measures

Programmes of measures Construction required by WFD Articles 4, 11 and Annex VI Highly linked to environmental objectives set-up by RBMP Outstanding issues : How measures can be selected ? What tools can be developed ? How measures’ effectiveness can be assessed ? How can uncertainties be addressed ? What level of detail ? What scale ? What is a PoM summary ? How can PoM summary be linked to the parts of RBMP dealing with objectives, extensions, exemptions ? What obligation related to reporting ?

District characterisation Register of protected areas Risk assessment Status assessment Objective monitoring programmes Identification of the significant water management issues Definition of the environmental objectives River Basin Management Plan Programme of measures Definition of the measures

River Basin Management Plans - 1 Production required by WFD Article 13 and Annex VII Outstanding issues : What definition and functions of RBMP, what level of detail ? How to deal with different purposes ? What possible organisations and methodologies to build-up RBMP in national and international river basins ? What are the most appropriate levels of work ? How can common approaches on basin wide issues be developed ? How can objectives and priorities be set-up ? For IRB, what possible comparisons, coordination, funding…?

River Basin Management Plans - 2 Outstanding issues : What criteria can be developed for assessing costs (disproprotionate costs or not) ? How can exemptions be used and justified ? What is the defined purpose of reporting ? Relation with SOER (dual) : how to be compliant ? What relation between RBMP as a product and electronic reporting? What level of detail ? What aggregation ? What feasible scale for reporting ? What indicators ?

Workshop Programme 8 May 1 to 3 pm Plenary session Introduction RBMP and Environmental Objectives under WFD – Commission What is a RBMP ? Can we develop a common understanding ? – Sweden, United Kingdom, France 3 to 3.30 pm Coffee break

Workshop Programme 8 May 3.30 to 5.30 pm Parallel Working sessions Working session 1 – Identifying measures, assessing their effectiveness Working session 2 – Preparing RBMP 5.30 to 6 pm Break 6 to 7 pm Plenary

Workshop Programme 9 May 8.30 to 11 am Parallel working sessions Working session 3 – Drawing-up an international RBMP Working session 4 – RBMP and reporting 11 to 11.30 am Break 11.30 to 1 pm Final plenary

Expected overall outcomes of the workshop Identification of similarities and differences in interpretation of WFD concerning significant water management issues, PoM and RBMP Identification of similarities and differences in the development of PoM and RBMP (national and international RBs) Ideas on how reporting on RBMPs could be structured Identification of worthwhile issues to be further dealt with in the CIS framework