Doc.: IEEE 802.11-11/01575r0 Submission November 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: 2011-11-10 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0467r4 Submission May 2010 Stephen McCann, RIMSlide 1 TGu Agenda Date: Authors:
Advertisements

Doc.: IEEE /0682r3 Agenda July 2013 Stephen McCann, BlackberrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /1020r4 Agenda September 2013 Stephen McCann, BlackberrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE 802 EC-12/0008r0 Agenda February 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE /0918r3 Submission September 2005 Emily Qi, et alSlide 1 Proposed TGv Selection Process Notice: This document has been prepared to.
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec Title: Security TG Closing Note Date Submitted: January 22, 2009 Presented at IEEE
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /1211r0 Submission November 2010 Stephen McCann, RIMSlide 1 TGu Agenda Date: Authors:
Doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Doc.: IEEE /1116r0 Submission July 2006 Harry Worstell, AT&T.Slide 1 TGp Closing Report Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0545r0 Submission May 2009 Jon Rosdahl, CSR WG Patent Slides and P&P Status Date: Authors:
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
IEEE Working Group on Broadband Wireless Access (BWA) IEEE Gdoc.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Doc.: IEEE /854R3 SubmissionSlide 1 July 2004 Sheung Li, Atheros Section 21 Procedure (formerly Procedure 10) Request for P802.11j Conditional.
Doc.: IEEE Submission July 2007 John Notor, Cadence Design Systems, Inc.Slide 1 Overview of FCC ET FNPRM ISM Band Spectrum.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
1 Session # Relay TG Session Summary/Closing Remarks IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE j-07/022.
Doc.: IEEE /0943r0 Agenda September 2013 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc September 2013 Agenda Date: Authors:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
21-07-xxxx IEEE MEDIA INDEPENDENT HANDOVER DCN: xxxx Title: Your Title Here Date Submitted: Month, NN, 200x Presented at IEEE.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Initial Proposal on IEEE Down Selection Process Date Submitted: October 12,
Session # Maintenance Task Group Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-09/0029r2.
Michigan Electronic Grants System Plus
IEEE 802 JTC1 Standing Committee May 2014 agenda
es IEEE MEDIA INDEPENDENT HANDOVER DCN: es Title: Response to ES PAR and 5C Comments Date Submitted: March.
Doc.: IEEE /1438r0 Submission November 2008 Jon Rosdahl, CSRSlide EC Material Date: Authors:
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
Doc.: IEEE /0849r1 Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 July Items for the LMSC EC Agenda Date:
Doc.: 18-11/58r0 Submission July 2011 John Notor, Notor ResearchSlide 1 Summary of ITU-R Documents Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0989r /0045r1 Submission July 2006 Denis Kuwahara, BoeingSlide 1 RR-TAG Liaison Report IEEE Notice: This document.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0092r0 Submission July 2010 Tuncer Baykas, NICTSlide TG 1 July Meeting Opening Report Notice: This document has been prepared.
Doc.: IEEE /0495r1 Submission May 2009 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE DySPAN-SC MTNG 5 th General Meeting of IEEE DySPAN-SC June 25-28, 2012 June 2012 Yohannes Alemseged (NICT) Slide 1 5 th General Meeting.
Doc.: IEEE /0290r0 Submission March 2010 Matthew Gast, Trapeze NetworksSlide 1 TGmb Agenda, January 2010 Date: Authors:
Doc.: IEEE n SG4n-CMB March 2012 Clint Powell (PWC, LLC) Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0085r0 Submission Nov 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report Jan 2014 Date: Authors:
Doc.: IEEE /0810r0 Submission May 2011 Minho Cheong, ETRISlide 1 Selection of Key Requirement Elements for Baseline FR-EM Document Date:
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE /0552r1 Submission May 2014 Slide 1 IEEE WG responses to SC6 on FDIS ballots on aa/ad/ae 13 May 2014 Authors: NameCompanyPhone .
Doc.: IEEE /1167r0 Submission November 2009 Osama Aboul-Magd (Samsung)Slide 1 TGac Ad Hoc Group Operation and Chair Selection Procedure Date:
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Doc.: IEEE /0564r0 Submission May 2014 Marc Emmelmann, SelfSlide 1 Results of LB 201 on TGai D2.0 Date: Authors:
Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
Doc.: IEEE /1586r0 Agenda January 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
March 2010 Plenary Session Notes on IEEE 802 Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date.
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEEE MEDIA INDEPENDENT HANDOVER DCN: mugm Title: Group Management TG Opening Note Date Submitted: September 18, 2012 Presented at.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
Doc.: IEEE /xxxxr0 Submission July 2007 Terry Cole, AMDSlide Common Editorial Comment Resolution Process Date: Authors:
Doc.: IEEE /0819r1 Submission May 2011 Tom Siep, CSRSlide 1 Text for Call for Technical Contributions Date: Authors:
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
Doc.: IEEE /0185r0 Submission September 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – September 2006 IEEE P
<month year> <September 2018>
IEEE WG Closing Report – March 2006
802.11ai Spec Development Process Update Proposal
Proposed TGv Selection Process
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Proposed TGv Selection Process
IEEE MEDIA INDEPENDENT HANDOVER DCN:
September, 2001 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Briefing on IEEE Standards Style Manual]
Presentation transcript:

doc.: IEEE /01575r0 Submission November 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:

doc.: IEEE /01575r0 Submission November 2011 Tom Siep, CSRSlide 2 Abstract Suggestions from contributions to the draft for ai to submit to Working Group for WG letter ballot

doc.: IEEE /01575r0 Submission Process Flow November 2011 Tom Siep, CSRSlide 3 WE ARE HERE IN JANUARY Description of the steps is in the flowchart are in the backup section of this presentation

doc.: IEEE /01575r0 Submission Submissions IEEE Language Style Guide Use (and overuse) of terms November 2011 Tom Siep, CSRSlide 4

doc.: IEEE /01575r0 Submission IEEE Language -- definitions November 2011 Tom Siep, CSRSlide 5 TermEquivalentUse shallis required todefines normative behavior mustis a natural consequence ofdescribes unavoidable situations willit is true thatstatement of fact not controlled by the text shouldis recommended thatindicates that among several possibilities one is recommended as particularly suitable, but not required mayis permitted toallows options canis able torelates statements in a causal fashion isis defined asfurther explains elements that are previously required or allowed notefor your information only,preface to informative text

doc.: IEEE /01575r0 Submission IEEE Language – simple check Use the table in the previous slide to check for correctness of usage by: –Insert the equivalent phrase in place of the IEEE term –Evaluate the resulting sentence for the intended meaning –If the sentence has the same meaning then the term is likely to have been used correctly. Note: November 2011 Tom Siep, CSRSlide 6

doc.: IEEE /01575r0 Submission Style Guide(s) IEEE Standards Style Manual Establishes preferred style for the preparation of IEEE standards drafts editorial-style-guide.doc –Style guide supplement to the IEEE Standards Style Manual November 2011 Tom Siep, CSRSlide 7

doc.: IEEE /01575r0 Submission Use (and overuse) of terms Shall used at the beginning of a paragraph generally is sufficient –Consider that each shall is the equivalent of a line in the PICS –Specific exceptions should be in separate paragraphs Any time the term note is used, the following text is considered to be informative –Do not mix informative and normative text in the same paragraph November 2011 Tom Siep, CSRSlide 8

doc.: IEEE /01575r0 Submission Numbers The following rules should be observed: a) The decimal marker should be a dot on the line (decimal point). This applies even when the standard in question is intended for international adoption (e.g., adoption by ISO/IEC); see Clause 22. b) For numbers of magnitude less than one, a zero should be placed in front of the decimal point (see ). c) In general text, isolated numbers less than 10 should be spelled out. However, in equations, tables, figures, and other display elements, Arabic numerals should be used. Numbers applicable to the same category should be treated alike throughout a paragraph; numerals should not be used in some cases and words in others. d) The value of a quantity shall be expressed by an Arabic numeral followed by a space and the appropriate unit name or symbol. An upright (Roman) type font should be used for the unit symbol even if the surrounding text uses a sloping (italic) font. e) If tolerances are provided, the unit shall be given with both the basic value and the tolerance (150 m ± 5 mm). Ranges should repeat the unit (e.g., 115 V to 125 V). Dashes should never be used because they can be misconstrued for subtraction signs. November 2011 Tom Siep, CSRSlide 9

doc.: IEEE /01575r0 Submission BACKUP SLIDES November 2011 Tom Siep, CSRSlide 10

doc.: IEEE /01575r0 Submission Description of steps 1.Define process and requirements 2.Call for Proposals (CFP) 3.Evaluation Methodology 4.Review submissions for adherence to CFP 5.Conforms to CFP? 6.Submitter(s) revision 7.Solution overlap? 8.Merge solutions 9.75% Approval? (Submissions) 10.Prepare Draft 11.75% Approval? (Drafts) 12.Comment Resolution 13.Technically Complete? 14.Ready for WG Ballot November 2011 Tom Siep, CSRSlide 11

doc.: IEEE /01575r0 Submission 1.Define process and requirements Process –This document, when approved, describes the process TGai will use in processing potential solutions for the Amendment to standard –Process may be amended by >50% vote of TGai Requirements –Separate document – ai-TGai-functional-requirements.docx November 2011 Tom Siep, CSRSlide 12

doc.: IEEE /01575r0 Submission 2. Call for Technical Contributions (CFTC) Requesting technical inputs for consideration Example: – ah-call-for-technical-contributions.docx ah-call-for-technical-contributions.docx November 2011 Tom Siep, CSRSlide 13

doc.: IEEE /01575r0 Submission Call for submissions (1 of 3) Any individual intending to present a proposal must notify the IEEE ai Task Group chair, Hiroshi Mano, via at by July 1 th, Presentations of introductory proposal submissions material shall be submitted to the IEEE document server prior to July18 th, 2011 for presentation and discussion during the July IEEE 802 Wireless Plenary Final proposals and related documents shall be submitted to the IEEE document server prior to September 9 th, 2011 for presentation and discussion during the September plenary session. Time permitting, proposals arising at or during meeting time and after the stated due dates may be allowed by the chair. November 2011 Tom Siep, CSRSlide 14

doc.: IEEE /01575r0 Submission Call for submissions (2 of 3) Background information is available in the following documents in document server is available at the following location, /1152r01: Fast Initial Link Set-UP Project Authorizaiton Request 11-10/1152r01: Fast Initial Link Set-Up PAR 11-10/0238: TGai Use Cases : TGai Evaluation Methodology November 2011 Tom Siep, CSRSlide 15

doc.: IEEE /01575r0 Submission Call for submissions (3 of 3) All presenters should be familiar with the following documents regarding IEEE policies and procedures: - IEEE Patent Policy - slideset.ppt - Patent FAQ LoA Form Affiliation FAQ Anti-Trust FAQ - guidelines.pdf - Ethics IEEE Working Group Policies and Procedures policies-and-procedures.dochttp://standards.ieee.org/board/pat/pat- slideset.ppthttp://standards.ieee.org/board/pat/faq.pdfhttp://standards.ieee.org/board/pat/loa.pdf guidelines.pdf policies-and-procedures.doc November 2011 Tom Siep, CSRSlide 16

doc.: IEEE /01575r0 Submission 3. Evaluation Methodology Evaluation –Separate document – ai-TGai-Evaluation-Methodology.docx ai-TGai-Evaluation-Methodology.docx Estimated availability: earliest is end of July November 2011 Tom Siep, CSRSlide 17

doc.: IEEE /01575r0 Submission 4. Review submissions for adherence to CFTC The chair, vice chair, and technical editor of TGai should review submissions to determine if they are in scope for the See 0139r10139r1 November 2011 Tom Siep, CSRSlide 18

doc.: IEEE /01575r0 Submission 5. Conforms to Requirements? Contributors will be notified by the chair if their submissions fall outside the scope of TGai and will be encouraged to modify them Submitters who choose to present submissions which have been determined to be out of scope may ask for a vote of the TG membership to have their submission considered. 50% majority of attendees are required to approve. November 2011 Tom Siep, CSRSlide 19

doc.: IEEE /01575r0 Submission 6. Submitter(s) revision Submissions which have had deficits identified during the TGai process will have the opportunity to modify their submissions and resubmit in a timely manner. November 2011 Tom Siep, CSRSlide 20

doc.: IEEE /01575r0 Submission 7. Solution overlap? It is possible that more than one submission will be found to be acceptable to the WG There must be a determination by the WG whether or not an overlap in functionality exists The WG may express an preference for resolution of the duplication, but it is up to the submitters to resolve and merge the solutions Month Year Tom Siep, CSRSlide 21

doc.: IEEE /01575r0 Submission 8. Merge solutions Solution merging is generally an offline activity between submitters Others may be included by mutual consent Month Year Tom Siep, CSRSlide 22

doc.: IEEE /01575r0 Submission 9. 75% Approval? (Submissions) Technical proposals are required to pass a TG vote by a 75% margin In the submissions phase of the standards process, it is not necessary to be orthogonal with all other solutions –Overlaps may exist –Some or all features in an approved submission may be removed as a result of the merging process November 2011 Tom Siep, CSRSlide 23

doc.: IEEE /01575r0 Submission 10. Prepare Draft The technical editor is responsible for accurately translating the material in approved submissions into a Draft Amendment Members of TGai may be invited to assist The work will be done in consultation with the WG technical editor and the editors November 2011 Tom Siep, CSRSlide 24

doc.: IEEE /01575r0 Submission % Approval? (Drafts) The TGai Draft is required to pass a TG vote by a 75% margin This will not be a formal letter ballot process November 2011 Tom Siep, CSRSlide 25

doc.: IEEE /01575r0 Submission 12. Comment Resolution Comment resolution may be done by the group as a whole or by a subset of TGai. This activity may be performed during Interim, Plenary or Ad Hoc meetings –Ad Hoc meetings will be called in accordance with rules November 2011 Tom Siep, CSRSlide 26

doc.: IEEE /01575r0 Submission 13. Technically Complete? As part of the preparation for WG Letter Ballot, the Draft will have a final review for completeness and correctness –Technically complete –Able to pass MEC or mechanisms defined for passing it November 2011 Tom Siep, CSRSlide 27

doc.: IEEE /01575r0 Submission 14. Ready for WG Ballot Submit to WG ballot process November 2011 Tom Siep, CSRSlide 28