LHC OPERATION AND SUPPORT

Slides:



Advertisements
Similar presentations
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Advertisements

Magnetic Behavior of LHC Correctors: Issues for Machine Operation W. Venturini Delsolaro AT-MTM; Inputs from A. Lombardi, M. Giovannozzi, S. Fartoukh,
Updates to WISE for LHC run II Per Hagen May 2015.
Fk. Bordry AB/PO Ability of the converter s to follow the reference function (static, dynamics) I1 I2 I3 Static part is covered by the static definition.
Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting.
E. Todesco FIELD MODEL AT 7 TEV N. Aquilina, E. Todesco CERN, Geneva, Switzerland On behalf of the FiDeL team CERN, 17 th June.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
The implementation of hysteresis in the FIDEL model and implications for the LHC operation P. Hagen November 2010.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
General Considerations for the Upgrade of the LHC Insertion Magnets
LSA/FiDeL1 Deliverables Commissioning:Commissioning: Transfer functions [MB, MQ, MQY, MQM, MQX etc…] DC components Decay prediction Snapback prediction.
AT-MEL, CERN, 1211 Geneva 23 R.Wolf-LHCCWG Magnet Setup Cycling for LHC R. Wolf for the FQWG et al. Contents -Overview -Details of individual cycles.
E. Todesco EXPERIENCE WITH FIELD MODELING IN THE LHC E. Todesco CERN, Geneva Switzerland Thanks to the FiDeL team CERN, Space charge th April 2013.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
E. Todesco CAN WE IMPROVE THE MAGNETIC CYCLE/MODEL AND THEIR EFFECTS? E. Todesco For the FiDeL team: C. Alabau Pons, L. Bottura, M. Buzio, L. Deniau, L.
E. Todesco ENERGY OF THE LHC AFTER LONG SHUTDOWN 1 ( ) C. Lorin, E. Todesco and M. Bajko CERN, Geneva Switzerland With relevant inputs from colleagues.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
7 th March 2008 Magnet Modelling N. Sammut On behalf of the FIDEL Working Group.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
Tune: Decay at Injection and Snapback Michaela Schaumann In cooperation with: Mariusz Juchno, Matteo Solfaroli Camillocci, Jorg Wennigner.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
E. Todesco THE LHC MAGNETIC MODEL AT 6.5 TEV E. Todesco CERN, Geneva Switzerland With contributions from N. Aquilina, L. Bottura, R. De Maria, L. Deniau,
MQM and MQY harmonics in Fidel Walter Venturini Delsolaro FIDEL meeting, 28 April 2009.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
17 th April 2007 Nicholas J. Sammut Decay Prediction and Minimisation During LHC Operation University of Malta Field Quality Working Group with several.
CERN, 11th November 2011 Hi-lumi meeting
SLHC –PP WP6 LHC IR Upgrade - Phase I.
LHC Commissioning with Beam
Testing of SC Magnets Status - November 2010
Minimum Hardware Commissioning – Disclaimer
Validated magnetic data at cold
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
The HL-LHC Circuits: Global View and Open Questions
FiDeL: the model to predict the magnetic state of the LHC
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Powering the LHC Magnets
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Chromaticity decay and snapback
Tune and Chromaticity: Decay and Snapback
Field model deliverables for sector test and commissioning: when and what? The implementation of an accurate magnetic model will be vital for efficient.
Status of Magnet Setup Cycling for LHC
Field quality to achieve the required lifetime goals (single beam)
Detailed global view on protection and detection of the circuits
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
UPDATE ON DYNAMIC APERTURE SIMULATIONS
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Remote setting of LHC BLM thresholds?
HIGH LUMINOSITY LHC: MAGNETS
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Week 35 – Technical Stop and Restart
Planning at 5 o’clock meeting Friday
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Orbit Feedback / Chamonix 03 / J. Wenninger
Machine Tolerances in Cleaning Insertions
Triplet corrector layout and strength specifications
Beam dynamics requirements on MQT
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Operational Results of LHC Collimator Alignment using Machine Learning
Operational Results of LHC Collimator Alignment using Machine Learning
Presentation transcript:

LHC OPERATION AND SUPPORT CERN, internal review of superconductors and magnet laboratories, 19th May 2009 LHC OPERATION AND SUPPORT E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN Acknowledgements: A. Siemko, W. Venturini Delsolaro, L. Walckiers,

MAGNETIC MEASUREMENTS AND POWER TEST General strategy: CERN should have the possibility of testing during the whole LHC life any magnet of the machine Magnets that today cannot be tested at CERN: the triplet MQXA and MQXB, and the separation dipoles No equipment for magnetic measurements is available The LHC MQXA made by KEK LHC separation dipole made by BNL

MAGNETIC MEASUREMENTS AND POWER TEST SM18 has been designed to test a large number of dipoles and quadrupoles during the production (12 test benches) During operation, we do not expect that we need such a high rate, therefore we should rather diversify than focusing on keeping 12 benches, but … remember the 3-4 incident experience, where testing rate has become critical for operation

SPECIAL NEEDS FOR OPERATION: FiDEL Throughout the life of the machine we will probably need to have additional magnetic measurements to have a better understanding of the magnetic model Example: in Tevatron a campaign of measurements was started at the end of the 90s to improve the knowledge of the magnets, triggered by the RUN II, i.e., by a substantial machine upgrade The LHC upgrades will probably need more and more magnetic measurements, as new beam physics will point out new directions b3 decay in Tevatron dipoles, From J. Annala, et al, TD-04-043 (2004) pg. 38

SPECIAL NEEDS FOR OPERATION: FiDEL Main features of the magnetic model needs Flexibility: being able to measure every type of magnet Speed: being able to measure with high rates (~10 Hz) for decay and snapback Calibration: being able to measure the absolute values of transfer functions (for instance, for the squeeze) – even for correctors (limited knowledge of the TF of correctors can be an issue) Capability of using the LHC control software LSA to steer tracking tests (dipole vs quadrupole, dipole vs correctors)

SPECIAL NEEDS FOR OPERATION: FiDEL Proposed program of additional measurements: tracking MB—MCS (b3 compensation during snapback – already done, but residual b3 of ~0.3 units – critical for ramp – more test needed) MQ—MQT (tracking the tune) MQ—MS (Q’ tracking?) N. Sammut, b3 correction in tracking test – FiDeL meeting, winter 2007-2008

SPECIAL NEEDS FOR OPERATION: FiDEL Proposed program of additional measurements MQM/MQY transfer functions at low current (beta-beating at injection - done for MQM) MCBX hysteresis: separation, collision, crossing angle (for collision) MQT, MS hysteresis small loops around zero current (tune and chromaticity) W. Venturini Delsolaro – MQM transfer function – FiDeL meeting, May 2009

SPECIAL NEEDS FOR OPERATION: FiDEL Proposed program of additional measurements Validation of influence of powering cycles and pre-cycles Any other issue with powering history

SPECIAL NEEDS FOR OPERATION: POWER TESTS AND PROTECTION Proposed program of additional test assistance to the calibration of BLM (energy to quench vs. operating current), dedicated tests with heaters in the magnet cold bore magnet protection, experiment on specific cases with high splice resistance, possibly interconnects on bus-bars with controlled faults, to decide on critical thresholds for operation