Rob Cotterill & Helen Jones DNV Consulting, UK

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Module N° 7 – SSP training programme
Module N° 4 – ICAO SSP framework
EMS Checklist (ISO model)
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Human factors Training & Competence CaspianExplorer.com.
The Australian/New Zealand Standard on Risk Management
ISO 17799: Standard for Security Ellie Myler & George Broadbent, The Information Management Journal, Nov/Dec ‘06 Presented by Bhavana Reshaboina.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Examine Quality Assurance/Quality Control Documentation
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Introduction to Computer Technology
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
PRISM: EU Network on Human Factors in the Process Industries.
AWARE PROJECT – AGEING WORKFORCE TOWARDS AN ACTIVE RETIREMENT Alberto Ferreras-Remesal Institute of Biomechanics of Valencia IFA 2012 – Prague – May 31th.
S/W Project Management
Introduction to ISO New and modified requirements.
Basics of OHSAS Occupational Health & Safety Management System
Visit us at E mail: Tele: www.globalmanagergroup.com.
Orientation to PRISM and Seminar Robin Turney Chairman PRISM Steering Committee.
Procedure Writing Basics Mr. Richard Crisler Spring-2006.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Health and Safety Policy
___________________________________________ KEELE UNIVERSITY : Music Technology Teaching Innovation project zero An introduction to project work.
Human Factors (HF) - Assessment Method Agenda What is Human Factors? Why do we need HF-Assessment Method ? What is the HF-Assessment Method ? Why.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
SmartNets Results Overview SmartNets SmartNets Methods.
“A Truthful Evaluation Of Yourself Gives Feedback For Growth and Success” Brenda Johnson Padgett Brenda Johnson Padgett.
© 1998 EHS Management Partners, Inc. ALL RIGHTS RESERVED 1 A Process for Developing Department-Specific EHS Plans David E. Downs, CIH, CSP President EHS.
Responsible Care® Health & Safety Task Force – 06 H&S.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
1 CP586 © Peter Lo 2003 Multimedia Communication Multimedia Development Team.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Quality Assurance Systems: QMS: The UEF’s experience Yohama Puentes HEI ICI project: End seminar
CONTROL-M Training At Global Online Trainings IND: Skype: Global.onlinetrainings USA:
Devon Enhanced C&I Programme. © Babcock Integration LLP, No unauthorised copying permitted. 2 Priorities To.
João Paulo F. A. Carvalho The 5 step model on Risk Assessment How to assess the risks (5 steps model) and Completion of the 5 steps.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
Kick Off Meeting Largs, Scotland
UNDERSTANDING ISO 9001:2008.
NEEDS ASSESSMENT HRM560 Sheikh Rahman
GS-R-3 vs. ISO 9001:2008 Requirements - 4
Information Systems Development
The Five Secrets of Project Scheduling A PMO Approach
Projects and their impact on Trade Union Education
Fundamentals of Information Systems, Sixth Edition
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Module 1 IAEA Safety Standards on Management Systems.
Developing Information Systems
Training Course on Integrated Management System for Regulatory Body
Quality Management Systems – Requirements
EUREKA project Overview
Transition ISO 9001:2008 to ISO 9001:2015
CLINICAL INFORMATION SYSTEM
Evaluating Provision for Students with Additional and Special Educational Needs in Post-Primary Schools Briefing for the Education Partners 4th September.
RST processes Session 5 Presentation 2.
Regulatory Oversight of HOF in Finland
EMERGENCY PLANNING GUIDANCE FOR RAIL MARSHALLING YARDS
Leading Practice Implementation Guide
Leading Practice Implementation Guide
Information Systems Development (ISD) Systems Development Life Cycle
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
Evaluating Provision for Students with Additional and Special Educational Needs in Post-Primary Schools Briefing for the Education Partners 4th September.
IAEA INITIATIVES TO SUPPORT MEMBER STATES TO ESTABLISH A NATIONAL STRATEGY FOR E&T IN RADIATION, TRANSPORT AND WASTE SAFETY ANDREA LUCIANI Division.
Presentation transcript:

Rob Cotterill & Helen Jones DNV Consulting, UK Optimising Human Performance: Best practice guidance for the process industries Rob Cotterill & Helen Jones DNV Consulting, UK 26/12/2018 Loss Prevention 04

Introduction PRISM: safety management for the process industries Optimising human performance Procedures Training HCI / MMI Task Design Where “good” is better than “best” 26/12/2018 Loss Prevention 04

Data Gathering Search of academic literature Questionnaire Inputs from PRISM membership Collection of good practice examples Input from attendees at seminars... Good practice generation seminar Good practice dissemination seminar 26/12/2018 Loss Prevention 04

Generation Seminar, Budapest Chinoin Rt, March 2002 24 attendees from 11 countries (incl. NAS) Industry and consultancy speakers All four FG2 domains addressed 26/12/2018 Loss Prevention 04

Dissemination Seminar, Athens NCSR Demokritos, September 2003 40 attendees from 15 countries Industry, academic and consultancy speakers FG2 specific presentations Other PRISM groups Other networks 26/12/2018 Loss Prevention 04

FG2 Deliverables 26/12/2018 Loss Prevention 04

FG2 Deliverables Structure Best Practice Guidance Documents 26/12/2018 Loss Prevention 04

Training Guide Identifying training needs Identifying competence gaps Setting training objectives Securing or designing training programmes Providing training Reviewing the training course content Evaluating the training efficacy Following up training 26/12/2018 Loss Prevention 04

A New Model of Training Training methods: Distance learning Classroom training On the job training Embedded training Computer based training Simulator training 26/12/2018 Loss Prevention 04

Procedures Guide Collect information about task. Involve the workforce. Design the procedure system. Determine the procedure format. Design of the procedures. Screening by others. Training on the procedures. Provide feedback on effectiveness. Monitor training effectiveness. Plan procedure review & updates Schedule refresher training 26/12/2018 Loss Prevention 04

Procedures should: be accurate and complete; be clear and concise with an appropriate level of detail; be current and up-to-date; be supported by training; identify hazards; state necessary precautions for hazards; use familiar language; use consistent terminology; reflect how tasks are actually carried out; promote ownership by users; be in a suitable format; and be accessible. (HSG 48) 26/12/2018 Loss Prevention 04

HCI / MMI Guide Control room design and assessment Alarm handling Computer interface design Design for maintainability 26/12/2018 Loss Prevention 04

Issues in HCI / MMI Identify potential problems Review existing alarms Allocation of new functions and tasks to the control room Increasing amounts of information New display & control technology Modified control rooms Limit of design specifications Reduced number of operators Identify potential problems Review existing alarms Alarm handling Alarm rationalisation Develop & implement company standard User requirement definition Design specification Concept design Rapid prototyping Initial design Detailed design Layout of units: design of apparatus environmental considerations Maintenance operations In-line or line-removable Identification & safety labels 26/12/2018 Loss Prevention 04

Task Design Guide Defining the Task Identify Task Hazards Working Posture Workstation Design Workload / Manual Handling Mental Workload Tools and Equipment Human-Computer Interaction Understand the Task Context Task Support Documentation 26/12/2018 Loss Prevention 04

Questions of task design What are the task’s aims and objectives? How will the objective be achieved? Where will the task take place? When will the task be performed? Who will perform the task? Why is the task required? 26/12/2018 Loss Prevention 04

Conclusion: whither PRISM? PRISM has lasted three years Good practice has evolved since PRISM began PRISM established a Network for discussion Good practice will continue to evolve The PRISM network should ensure that it continues to be shared. 26/12/2018 Loss Prevention 04