2 Days National Workshop on “National Building Code of India 2016 ”

Slides:



Advertisements
Similar presentations
Typical Plumbing System
Advertisements

Chapter 9 Water and Basic Design “The next great world crisis will be water supply.” 2 issues: keep water out since 19th century, distribute water Read.
ISIC Rev.4 draft, Section E “Water supply; sewerage; waste management and remediation activities” United Nations Statistics Division WS-ECE 09/04.
Design of W.W. Collection System
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
PLUMBING DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Chapter 20 Plumbing Plans.
Technology in Architecture Lecture 15 Waste & Vent Systems Waste & Vent Sizing Procedure Bathroom Design Lecture 15 Waste & Vent Systems Waste & Vent Sizing.
September 29-30, 2011 Drinking Water Program Sustained Compliance Workshop Lee Johnson, P.E
B.ARCH. SEMESTER-II AR 126 BUILDING TECHNOLOGY – P/H UNIVERSITY INSTITUTE OF ARCHITECTURE Scheme of Teaching L T P Total Scheme of Examination.
Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman
Stormwater Systems ARCH-433. Attendance This water closet, installed in Pullman, Washington, flushes in a counterclockwise rotation. In what direction.
RAINWATER HARVESTING IN THE HOSPITALITY SECTOR
Sanitary Engineering Lecture 16
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development.
GREEN INITIATIVES AT IIMB Brief outline and benefits.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
Technology in Architecture Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing Example Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
TREATMENT PROCESS (Chicago)
Roof top rain water harvesting What is Rainwater harvesting? The term rainwater harvesting is being frequently used these days, however, the concept of.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Rainwater Harvesting 1 1.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
Sprinkler Loads on Trusses Educational Presentation.
How do we harvest rainwater and why should we.. Why Harvest Rainwater? Decrease the volume of potable water used for irrigation. Recharge the groundwater.
HYDROLOGY AND WATER RESOURCES ENGINEERING PARUL INSTITUTE OF ENGINEERING & TECHNOLOGY. Semester:- 5 th Branch:- Civil Engineering.
Unit 209: Drainage systems
Technology in Architecture
GRAYWATER CURRICULUM. Class 2 Objectives Graywater Code Graywater History Water Quality Protection Graywater Systems and Terms Setback Requirements 2.
 Plumbing refers to the laying and repairing of pipes and fixtures for the distribution of water or gas in a building, and for the disposal of sewage.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
Plumbing system fundamental and design course
Mahatma Gandhi Institute Of Technical Education & Research centre ,Navsari. A presentation on House Drainage Subject :- Environmental engineering.
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Heating Ventilation and Air Conditioning
RESIDENTIAL PLUMBING SYSTEMS (WASTEWATER)
Coursework guidelines
Maintenance of the On-Lot Sewage System
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
Electrical Gas Plumbing Heating & Cooling
Private Septic Systems
PLUMBING PLANS CHAPTER 31
Heating Ventilation and Air Conditioning
Typical Plumbing System
ME444 ENGINEERING PIPING SYSTEM DESIGN
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Prepared By : Osama amr Qutayba mElhim
Technology in Architecture
Private Septic Systems
Technology in Architecture
Heating Ventilation and Air Conditioning
Technology in Architecture
Technology in Architecture
Water Types of water Sewer systems TCU/VIA 6th semester workshop
Technology in Architecture
Technology in Architecture
Wastewater Treatment: Characteristics and Systems
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

2 Days National Workshop on “National Building Code of India 2016 ” Bureau of Indian Standards Jointly with Institution of Engineers (India) – Himachal Pradesh 7th and 8th June 2018 NBC Part 9 – Plumbing Services

The Code was first published in 1970. The last revision of the Code was in 2005 and it adopted major aspects towards water conservation, use of reclaimed water for non potable uses, rain water harvesting and other requirements towards efficient and safe Plumbing Services. Further to which, National Building Code of India 2016 Was released on 15th March 2017; and appears in Volume 2 (Group 1) of the NBC 2016 . The Part 9 of the code is improvised to include new systems, updating the soil, waste, vent and rain water system and more information towards comprehensive design aspects with moreover new and detailed sketches.

The Changes and Revision Section 1 – Water Supply Provisions on water supply requirements for buildings have been related to the estimated occupancy in the chosen type of building. Table 1 on water requirements for buildings other than residences has been updated with respect to type of buildings and it now also includes domestic and flushing requirements separately. Water demand for landscaping purposes has been included. Requirements related to treatment of waste water and usage of recycled waste water have been included. Provisions have been included for protection of water supply by avoiding cross-connection between treated and raw water supplies and back flow prevention, and securing identification of non-potable water supply pipes. List of materials used to manufacture pipes has been updated. General requirements for design of distribution systems have been included. Table 2 on fixture unit for different types of fixtures has been updated. Table 3 on probable simultaneous demand has been updated with demand values included various intermediate and up to 10 000 fixture units, along with graphs for probable demand. Maximum flow rate and flush volumes have been included.

The Changes and Revision Section 1 – Water Supply Provisions related to inadequate and excessive water pressure have been included. Guidance on water hammer effects have been included. Provisions for distribution systems in multi-storeyed buildings have been updated along with illustrations therefor. Provisions related to zoning of distribution systems have been included. Hot water supply systems have been included under the existing clause on hot water supply installations. Detailed provisions related to swimming pools have been included. Guidance on allowance for expansion of water pipes have been included. A new clause on colour coding for different types of water pipes has been included. Provisions have been reviewed and updated from the point of view of accessibility by elderly and persons with disabilities, also, in this context, duly giving cross-reference to 13 of Part 3 ‘Development Control Rules and General Building Requirements’. Certain terminologies have been included and some have been updated. Cross-references to Indian Standards have been updated.

The Changes and Revision Section 1 – Water Supply Occupancy Calculation

Section 1 – Water Supply Water Requirement towards Domestic and Flushing

Section 1 – Water Supply – Pressure Consideration and Reclaimed Water Use

Section 1 – Water Supply – Grey and Black Water Treatment Plants

Section 1 – Water Supply – Cross Connection Control and Tagging/ Identification

Section 1 – Water Supply – Water Efficiency and Approach towards Low Flow Fixtures

Section 1 – Water Supply – Water Supply and Distribution

Section 1 – Water Supply – Water Distribution and Zoning

Section 1 – Water Supply – Hot Water Systems

Section 1 – Water Supply – Swimming Pool Aspect of Pool Sizes, Dimensions, Water Depths, Electrical Safety, Water Treatment, Balancing Tank, Filtration have been covered in detail.

Section 1 – Water Supply – Identification/ Color Coding

Aspects of Water Supply in Sub-Zero Temperature Ranges

The Changes and Revision Section 2 – Drainage and Sanitation Various tables on the requirements for fitments for drainage and sanitation for various occupancies have been updated, and a new table for shopping malls and retail buildings has been included. Enabling provisions for use of corrugated pipes, low noise pipes and under slung pipes have been included. Information about bio-toilets has been added. Typical mounting arrangements for various plumbing fixtures, including drainage systems and ventilation have been illustrated. A new table for calculation of single stack sizing has been included. Various additional requirements relating to layout of drainage and sanitation system have been added. Venting system for high rise buildings, along with a comprehensive table on size and developed length of stack vents and vent stacks, has been included. General provisions on design of drainage pipes have been elaborated. Provisions relating to gradients of drainage pipes have been elaborated. The table on fixture unit for different types of fixtures has been updated. The tables on maximum number of fixture units that can be connected to branches and stacks, and to building drains and sewers, have been updated.

The Changes and Revision Section 2 – Drainage and Sanitation New provisions on design requirement for high rise buildings drainage system have been included. The minimum diameter for floor drains outlets before connecting to floor trap has been included. Provisions related to manhole covers and recommended locations have been included. Provision for estimation of storm water runoff and coefficient of runoff for various surfaces have been included. The table on sizing of rainwater pipes for roof drainage has been updated. The illustration on artificial ground water recharge structure has been detailed. Guidelines relating to siphonic drainage system for large roofs have been included. Provisions on rainwater harvesting for plotted/group housing developments and deep well/bore well recharging, have been included. Clarifications and recommendations on use of septic tanks have been made. New provisions related to pumping and treatment of sewage have been included. A provision on treatment of waste water and usage of recycled water has been included through cross reference to Section 1 ‘Water supply’ of this Part of the Code. Provisions have been reviewed and updated from the point of view of accessibility by elderly and persons with disabilities, also, in this context, duly giving cross-reference to 13 of Part 3 ‘Development Control Rules and General Building Requirements’ of the Code. Certain terminologies have been included and some have been updated. Cross-referred standards have been updated. Guidance on water hammer effects have been included.

Section 2 – Drainage and Sanitation – Stack System

Section 2 – Drainage and Sanitation – Stack System

Section 2 – Drainage and Sanitation – Stack System A Two Pipe System with Common Soil and Waste Vent or with Independent Soil and Waste Vent. This system provides maximum flexibility and the governing safeguards are not severe

Section 2 – Drainage and Sanitation – Design Approach

Section 2 – Drainage and Sanitation – Vent Sizing

Section 2 – Drainage and Sanitation – DFU Design Approach Modified DFU Fixture Table and Pipe Sizing helps in design of complex and large projects.

Section 2 – Drainage and Sanitation – Vent Sizing

Aspects of Waste Disposal in Sub-Zero Temperature Ranges

Other aspects of Manhole Design, Manhole Depths, Storm Water Drainage, Rain Water Harvesting, Inspection, Testing, Maintenance, Sewage Treatment Plants and additional drawings and sketches are included in the Section 2 of Part 9, the significant aspects on Stacks (Soil, Waste, Vent and Rain Water) are much detailed and engineered for large and complex projects. Readers and Users are encouraged to review and also provide their inputs towards their experiences and aligned approach to international codes, their specific inputs towards improvisation based on local practices.